Renovate Marshall Gulch Picnic Area & Trailhead 1148960
Summary
AI-generated · Aug 24, 2025Renovate Marshall Gulch Picnic Area & Trailhead involves building a 1,100-foot-long single-lane asphalt road with 32 roadside parking spaces and installing two precast, prestressed beam bridges. The bridges are 64- and 76-feet long, each 30 feet wide, with approximately 8 feet of clear height.
The scope also includes relocating a CXT vault restroom, constructing new picnic areas and demolishing old ones, installing new culverts and removing old ones, removing retaining walls, reconstructing a small channel, and other related improvements to the picnic areas and trailhead.
WorkWork primarily consists of the construction of a 1,100-foot-long single-lane asphalt road with 32 roadside parking spaces and installation of two precast and prestressed beam bridges. The bridge designs are 64 and 76 feet long, both 30 feet wide with clear heights of approximately 8 feet. Additional items include relocating a CXT vault restroom, constructing new and demolishing old picnic areas, installing new and removing old culverts, removing retaining walls, reconstructing a small channel, and various small improvements associated with the picnic areas and trailhead.
From Sources Sought posted on Jun 24, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA