AI-generated · Sep 28, 2025A Design-Bid-Build construction project to reconfigure Facility 20145’s high-bay space by inserting an endo-skeleton within the existing structure and renovating surrounding areas to create secure laboratory space. The work includes constructing four new floors in the high-bay area by adding three elevated levels totaling 17,941 square feet above the existing basement, creating additional secure labs within the building envelope, plus a renovation of 9,666 square feet of existing space.
An award has been issued to Messer Construction Co. for $16,042,500 to perform this project.
Facility 20145 requires construction services for a Design-Bid-Build reconfiguration of an existing high-bay space by constructing new endo-skeleton structure within an existing facility and renovating existing space to create secure laboratory space. The project includes construction of 4 floors at the high-bay area in facility 20145 by providing three additional separate elevated floors (Total 17,941 SF) above the existing basement floor. These spaces will create additional secure laboratory space within the building envelope of the high bay existing footprint. Additionally, a renovation shall include 9,666 SF of existing space.
From Award Notice posted on Sep 25, 2025Notice history
1Details
Award Information
Award Notices
Posted: Sep 25, 2025
Facility 20145 requires construction services for a Design-Bid-Build reconfiguration of an existing high-bay space by constructing new endo-skeleton structure within an existing facility and renovating existing space to create secure laboratory space. The project includes construction of 4 floors at...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| MESSER CONSTRUCTION CO | F3PQM5C4ATN8 | 2U915 | Cincinnati, OH |
Agency
Place of Performance