Remove Traffic Island and Construct Sloped Concrete Static Display W50S6T26QA026
Summary
AI-generated · Jun 17, 2026Remove the traffic island in front of the West Gate guard shack and construct sloped concrete sides around an existing raised pedestal to support a static F-15 heritage aircraft display. Demolish and remove the island, repair the underlying irrigation, and repave the area so the final surface is smooth and seamless. The project value is under $25,000.
An RFQ is attached with the details for bid submission. A site visit is tentatively scheduled for Thursday, 25 June at 0900 PDT; the rally point is the west gate visitor parking lot, with limited parking and carpooling advised. To access the base, bidders must complete DBIDS prequalification and submit a base access form with attendee information (names, citizenship, and 6-digit DBIDS code) at least five business days before the site visit. The site visit is not mandatory but strongly recommended; questions are accepted until seven days before the solicitation response deadline. Offerors are responsible for verifying site conditions.
This project is to construct sloped concrete sides around an existing raised pedestal for a static F-15 heritage aircraft display. In addition to the pedestal, the contractor will demolish and remove the traffic island located in front of the West Gate guard shack, repair the underlying irrigation, and repave the area. The final surface will be smooth and seamless. The magnitude of this requirement is less than $25,000 Request for Quote (RFQ) details are provided on the attached solicitation. This requirement is being solicited as a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Review the RFQ solicitation instructions for quote submission criteria. Quotes shall be submitted electronically to the following email addresses: jarrod.sanchez@us.af.mil; justin.scales.1@us.af.mil A site visit is tentatively scheduled for Thursday 25 June at 0900 PDT. The designated rally point will be the west gate visitor parking lot. Parking space is limited therefore carpooling is strongly advised. To be granted base access, Offerors must complete Defense Biometric Identification System (DBIDS) Prequalification and submit a base access form. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided 5 business days before the site visit. Refer to Attachment, Base Access Request for additional instructions. Questions will be accepted until seven days prior to solicitation response deadline. The site visit is not mandatory but strongly recommended. Offerors are responsible for verifying conditions at the project site. As required by 15 U.S.C. 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses: (A). The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204. (B). Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below: Selected Agency: DEPT OF THE ARMY Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts 30 days or less: 0 31 to 60 days: 1 61 to 90 days: 0 91 to 180 days: 0 181 to 365 days: 1 Greater than 365 days: 1 After completion of contract performance via a contract modification addressing all un-definitized equitable adjustments received during contract performance 2
From Solicitation posted on Jun 16, 2026This project is to construct sloped concrete sides around an existing raised pedestal for a static F-15 heritage aircraft display. In addition to the pedestal, the contractor will demolish and remove the traffic island located in front of the West Gate guard shack, repair the underlying irrigation, and repave the area. The final surface will be smooth and seamless. The magnitude of this requirement is less than $25,000 Request for Quote (RFQ) details are provided on the attached solicitation. This requirement is being solicited as a Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Review the RFQ solicitation instructions for quote submission criteria. Quotes shall be submitted electronically to the following email addresses: jarrod.sanchez@us.af.mil; justin.scales.1@us.af.mil A site visit is tentatively scheduled for Thursday 25 June at 0900 PDT. The designated rally point will be the west gate visitor parking lot. Parking space is limited therefore carpooling is strongly advised. To be granted base access, Offerors must complete Defense Biometric Identification System (DBIDS) Prequalification and submit a base access form. Complete all fields under the CONTRACTOR/VENDOR/VISITOR INFORMATION section consisting of attendee names, citizenship, and DBIDS code (6-digit code). The base access form must be provided 5 business days before the site visit. Refer to Attachment, Base Access Request for additional instructions. Questions will be accepted until seven days prior to solicitation response deadline. The site visit is not mandatory but strongly recommended. Offerors are responsible for verifying conditions at the project site. As required by 15 U.S.C. 644(w), implemented by RFO FAR 36.101-4, the following information is provided to interested small businesses: (A). The National Guard Bureau (NGB) has no agency-specific policies or procedures applicable to definitization of equitable adjustments for change orders under construction contracts, other than those described at FAR 43.204, DFARS 243.204 and Army FAR Supplement (AFARS) 5143.204. (B). Data for the prior 3 fiscal years regarding the time required to definitize equitable adjustments for change orders under construction contracts for the NGB is currently unavailable, however data for Department of the Army (which NGB reports to) is listed below: Selected Agency: DEPT OF THE ARMY Time to definitize after receipt of an adequate Change Order Definitization Proposal under Construction Contracts: Number of Change Order Proposals definitized under Construction Contracts 30 days or less: 0 31 to 60 days: 1 61 to 90 days: 0 91 to 180 days: 0 181 to 365 days: 1 Greater than 365 days: 1 After completion of contract performance via a contract modification addressing all un-definitized equitable adjustments received during contract performance 2
From Solicitation posted on Jun 23, 2026Notice history
2-
Solicitation Posted Jun 16, 2026
-
Solicitation LATEST Posted Jun 23, 2026No changes from previous notice