REMOVE & REPLACE WINDOWS AT BUILDING 40-3 AT WATERVLIET ARSENAL W911PT26PA071
Summary
AI-generated · Apr 16, 2026Replace windows at Building 40-3 at Watervliet Arsenal. The contractor must provide construction management, labor, materials, equipment, and subcontractors to perform the window replacement per Statement of Work #25PW056.
Must follow the applicable NY wage determination, provide 100% payment and performance bonds, and complete the work as a firm-fixed-price contract with technical POC Bruno Batko. Awarded to American Maintenance & Supplies, Inc. for $157,306.18.
Provide construction management, labor, materials, equipment, and subcontractors for the replacement of Windows @ Bldg 40-3 at Watervliet Arsenal per Statement of Work #25PW056. Wage Determination General Decision Number NY2 revision dated 1/30/2026 100% Payment and Performance Bonds are required. Technical POC will be Bruno Batko Firm Fixed Price
From Award Notice posted on Apr 15, 2026Notice history
1Details
Award Information
Award Notices
Posted: Apr 15, 2026
Provide construction management, labor, materials, equipment, and subcontractors for the replacement of Windows @ Bldg 40-3 at Watervliet Arsenal per Statement of Work #25PW056. Wage Determination General Decision Number NY2 revision dated 1/30/2026 100% Payment and Performance Bonds are required. T...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| AMERICAN MAINTENANCE & SUPPLIES, INC | J6ZSW57BCX68 | 4LPT9 | Union City, NJ |
Contacts
Phone
Phone
Agency
Place of Performance
USA