Remove a pedestrian bridge at Caesar Creek Lake W912QR25QA072
Summary
AI-generated · Aug 25, 2025Remove a pedestrian bridge and its embankments, and re-establish the streambank in the tailwater area of Caesar Creek Lake. The contractor must supply all management, personnel, materials, supplies, tools, equipment, fuel, and vehicles required to perform the work, and execute everything in strict accordance with the SOW, all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, and incorporated references, including planning, administration, management, supervision, communications, and inspection to ensure compliance with contract requirements and applicable laws.
New access instruction indicates solicitation documents are available through the PIEE portal; select “PIEE Solicitation Module Link for W912QR25QA072” in the attachments/links section to access the solicitation materials.
This Request for Quote (RFQ) is to remove a pedestrian bridge and its embankments, as well as re-establish the streambank in the tail water area of Caesar Creek Lake. Please see the SOW that is attached for more information. The contractor will provide all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform the work as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, etc., contained herein or incorporated by reference. The performance and responsibility of the contractor shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all services are conducted in accordance with the contract requirements and all applicable Federal, State, and local laws and regulations.
From Solicitation posted on Aug 21, 2025This Request for Quote (RFQ) is to remove a pedestrian bridge and its embankments, as well as re-establish the streambank in the tail water area of Caesar Creek Lake. Please see the SOW that is attached for more information. The contractor will provide all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform the work as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, etc., contained herein or incorporated by reference. The performance and responsibility of the contractor shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all services are conducted in accordance with the contract requirements and all applicable Federal, State, and local laws and regulations. NOTE: For solicitation documents please see the attachments/links section and select "PIEE Solicitation Module Link for W912QR25QA072" for access to the solicitation.
From Solicitation posted on Aug 22, 2025****Amendment 0001 START****Solicitation W912QR25QA072 is hereby amended as follows on 08 September 2025:The Wage Determination have been updated form Wage Rates_OH20250001_15AUG2025 to Wage Rates_OH20250001_05SEPT2025. *NOTE: The due date for quotes remains 11 September 2025 at 10:00 AM ET.**NOTE: All amendments shall be signed and submitted with the quote.*****Amendment 0001 END****This Request for Quote (RFQ) is to remove a pedestrian bridge and its embankments, as well as re-establish the streambank in the tail water area of Caesar Creek Lake. Please see the SOW that is attached for more information. The contractor will provide all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform the work as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, etc., contained herein or incorporated by reference. The performance and responsibility of the contractor shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all services are conducted in accordance with the contract requirements and all applicable Federal, State, and local laws and regulations.
From Solicitation posted on Sep 08, 2025****Amendment 0002 START**** Solicitation W912QR25QA072 is hereby amended as follows on 15 September 2025: Due to errors discovered in the Scope of Work, the follow changes have been made. - The signage requirement (item number 3 in Line Item 0001) have been removed from the scope *NOTE: The due date for quotes is updated to 16 September 2025 at 10:00 AM ET.**NOTE: All amendments shall be signed and submitted with the quote.* (Amendment 0001 and 0002) *NOTE: ALL contractors must resubmit their quote by the stated deadline in order to be considered *****Amendment 0002 END******** Amendment 0001 START****Solicitation W912QR25QA072 is hereby amended as follows on 08 September 2025:The Wage Determination have been updated form Wage Rates_OH20250001_15AUG2025 to Wage Rates_OH20250001_05SEPT2025. *NOTE: The due date for quotes remains 11 September 2025 at 10:00 AM ET.**NOTE: All amendments shall be signed and submitted with the quote.*****Amendment 0001 END****This Request for Quote (RFQ) is to remove a pedestrian bridge and its embankments, as well as re-establish the streambank in the tail water area of Caesar Creek Lake. Please see the SOW that is attached for more information. The contractor will provide all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform the work as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, etc., contained herein or incorporated by reference. The performance and responsibility of the contractor shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all services are conducted in accordance with the contract requirements and all applicable Federal, State, and local laws and regulations.
From Solicitation posted on Sep 15, 2025Notice history
5-
Solicitation Posted Aug 21, 2025
-
Solicitation Posted Sep 15, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Sep 11, 2025 → Sep 16, 2025
-
Award Notice LATEST Posted Sep 17, 2025
Details
Award Information
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| LEININGER ENTERPRISES, LLC | YBMZC6K92553 | 0VWP1 | Hillsboro, OH |
Contacts
Phone
Agency
Place of Performance
45068