Contacts, documents and full notice history are available with a subscription.
Award Notice SBA 5 notices

Remove a pedestrian bridge at Caesar Creek Lake W912QR25QA072

Solicitation W912QR25QA072 Copied Notice ID 813a19e25b124801b82f347fb06d6279 Copied DEPT OF DEFENSE — W072 ENDIST LOUISVILLE
SAM.gov
Posted
Aug 21, 2025
Deadline
Sep 11, 2025
Set-aside
SBA
NAICS
238910
PSC
Y1LB

Summary

AI-generated · Aug 25, 2025

Remove a pedestrian bridge and its embankments, and re-establish the streambank in the tailwater area of Caesar Creek Lake. The contractor must supply all management, personnel, materials, supplies, tools, equipment, fuel, and vehicles required to perform the work, and execute everything in strict accordance with the SOW, all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, and incorporated references, including planning, administration, management, supervision, communications, and inspection to ensure compliance with contract requirements and applicable laws.

New access instruction indicates solicitation documents are available through the PIEE portal; select “PIEE Solicitation Module Link for W912QR25QA072” in the attachments/links section to access the solicitation materials.

This Request for Quote (RFQ) is to remove a pedestrian bridge and its embankments, as well as re-establish the streambank in the tail water area of Caesar Creek Lake. Please see the SOW that is attached for more information. The contractor will provide all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform the work as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, etc., contained herein or incorporated by reference. The performance and responsibility of the contractor shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all services are conducted in accordance with the contract requirements and all applicable Federal, State, and local laws and regulations.

From Solicitation posted on Aug 21, 2025

This Request for Quote (RFQ) is to remove a pedestrian bridge and its embankments, as well as re-establish the streambank in the tail water area of Caesar Creek Lake. Please see the SOW that is attached for more information. The contractor will provide all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform the work as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, etc., contained herein or incorporated by reference. The performance and responsibility of the contractor shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all services are conducted in accordance with the contract requirements and all applicable Federal, State, and local laws and regulations. NOTE: For solicitation documents please see the attachments/links section and select "PIEE Solicitation Module Link for W912QR25QA072" for access to the solicitation.

From Solicitation posted on Aug 22, 2025

****Amendment 0001 START****Solicitation W912QR25QA072 is hereby amended as follows on 08 September 2025:The Wage Determination have been updated form Wage Rates_OH20250001_15AUG2025 to Wage Rates_OH20250001_05SEPT2025. *NOTE: The due date for quotes remains 11 September 2025 at 10:00 AM ET.**NOTE: All amendments shall be signed and submitted with the quote.*****Amendment 0001 END****This Request for Quote (RFQ) is to remove a pedestrian bridge and its embankments, as well as re-establish the streambank in the tail water area of Caesar Creek Lake. Please see the SOW that is attached for more information. The contractor will provide all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform the work as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, etc., contained herein or incorporated by reference. The performance and responsibility of the contractor shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all services are conducted in accordance with the contract requirements and all applicable Federal, State, and local laws and regulations.

From Solicitation posted on Sep 08, 2025

****Amendment 0002 START**** Solicitation W912QR25QA072 is hereby amended as follows on 15 September 2025: Due to errors discovered in the Scope of Work, the follow changes have been made. - The signage requirement (item number 3 in Line Item 0001) have been removed from the scope *NOTE: The due date for quotes is updated to 16 September 2025 at 10:00 AM ET.**NOTE: All amendments shall be signed and submitted with the quote.* (Amendment 0001 and 0002) *NOTE: ALL contractors must resubmit their quote by the stated deadline in order to be considered *****Amendment 0002 END******** Amendment 0001 START****Solicitation W912QR25QA072 is hereby amended as follows on 08 September 2025:The Wage Determination have been updated form Wage Rates_OH20250001_15AUG2025 to Wage Rates_OH20250001_05SEPT2025. *NOTE: The due date for quotes remains 11 September 2025 at 10:00 AM ET.**NOTE: All amendments shall be signed and submitted with the quote.*****Amendment 0001 END****This Request for Quote (RFQ) is to remove a pedestrian bridge and its embankments, as well as re-establish the streambank in the tail water area of Caesar Creek Lake. Please see the SOW that is attached for more information. The contractor will provide all necessary management, personnel, materials, supplies, tools, equipment, fuel, and vehicles, except as otherwise provided herein, required to perform the work as specified and in strict accordance with all Terms, Conditions, General, Specific and Technical Provisions, Drawings, Attachments, Exhibits, etc., contained herein or incorporated by reference. The performance and responsibility of the contractor shall include all planning, programming, administration, management, supervision, communications, and inspection necessary to assure that all services are conducted in accordance with the contract requirements and all applicable Federal, State, and local laws and regulations.

From Solicitation posted on Sep 15, 2025

Notice history

5
  1. Solicitation Posted Aug 21, 2025
  2. Solicitation Posted Aug 22, 2025
    • Description: Description was updated
  3. Solicitation Posted Sep 08, 2025
    • Description: Description was updated
  4. Solicitation Posted Sep 15, 2025
    • Description: Description was updated
    • Response Deadline: Sep 11, 2025Sep 16, 2025
  5. Award Notice LATEST Posted Sep 17, 2025

Details

Solicitation number W912QR25QA072
Notice ID 813a19e25b124801b82f347fb06d6279
Award number W912QR25PA042
Notice type Solicitation
Product / Service (PSC) Y1LB
NAICS 238910
Archive date Sep 26, 2025

Award Information

Awardee
1
Total Awarded
$56,500.00
Award Date
Sep 17, 2025

Awardees

Company Name UEI CAGE Code Location
LEININGER ENTERPRISES, LLC YBMZC6K92553 0VWP1 Hillsboro, OH

Documents

No files available

View on SAM.gov

Contacts

primary
ETHAN PHILLIPS

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION GREAT LAKES AND OHIO
W072 ENDIST LOUISVILLE

Place of Performance

Caesar Creek Lake4020 N. Clarksville RoadWaynesville, Ohio 45068-9408
45068

Dates

Posted Aug 21, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 11, 2025 10 months ago