Removal of (4) Temporary production facilities N4215826Q0001
Summary
AI-generated · Nov 20, 2025Remove four (4) temporary production facilities; contractor has the option to demolish the temporary facilities on site. Ensure all debris from the temporary facilities is removed from Norfolk Naval Shipyard and properly disposed of. Take ownership of all leftover material inside the temporary facilities after transfer of ownership, and remove any portion of the staircase system that is not shipyard scaffolding. Provide all cranes, labor, materials, equipment, tools, transportation, and supervision necessary to perform the removal. Refer to the Statement of Work in the Combined Synopsis attachment for details.
The contractor shall remove of four (4) Temporary Production Facilities. The contractor has the option to demolish the temporary facilities on site. The Contractor shall ensure all the debris associated with the temporary facilities is removed from Norfolk Naval Shipyard and disposed of properly. The contractor shall take ownership of all leftover material (furniture, cabling, facility infrastructure etc.) inside the temporary facilities after transfer of ownership. Contractor is to take any portion of the staircase system that is not shipyard scaffolding. The contractor shall provide all cranes, labor, materials, equipment, tools, transportation, and supervision necessary to remove this equipment. See Statement of Work which is within the Combined Synopsis attachment.
From Combined Synopsis/Solicitation posted on Nov 19, 2025The contractor shall remove of four (4) Temporary Production Facilities. The contractor has the option to demolish the temporary facilities on site. The Contractor shall ensure all the debris associated with the temporary facilities is removed from Norfolk Naval Shipyard and disposed of properly. The contractor shall take ownership of all leftover material (furniture, cabling, facility infrastructure etc.) inside the temporary facilities after transfer of ownership. Contractor is to take any portion of the staircase system that is not shipyard scaffolding. The contractor shall provide all cranes, labor, materials, equipment, tools, transportation, and supervision necessary to remove this equipment. See Statement of Work which is within the Combined Synopsis attachment and other attachments.
From Combined Synopsis/Solicitation posted on Nov 20, 2025Notice history
2-
-
Combined Synopsis/Solicitation LATEST Posted Nov 20, 2025View changes (1)
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA