Removal of 2 Half-Walls 19AU9026Q0011
Summary
AI-generated · Aug 07, 2026Removal of two half-walls in the waiting area of the U.S. Embassy Consulate in Vienna, including demolition and disposal of concrete brick sections (total length about 14.5 m, height 1.3 m) and the adjacent floor, plus dismantling and later reinstallation of electrical components in the walls and floor. After demolition, the area will be rebuilt with new flooring (screed, impact insulation, laminate) and the space cleaned. The contractor will also handle removing old wiring and installing new switches, sockets, and wiring in the existing walls, with associated site logistics, dust protection, and disposal.
Quotations will be required per detailed tender documents to be published in the next solicitation. Work must occur in short time slots, including nights and weekends, while the facility remains in operation, with measures in place to avoid disturbing employees and clients. Requirements include dust protection, security clearances for personnel, vehicles, and materials, adherence to USG security regulations, and comprehensive safety and site-cleaning procedures. The indicative schedule is about 4–5 days of construction.
This project is for the removal of 2 half-walls in the waiting area at the U.S. Embassy Consulate in 1010 Vienna. Interested parties shall prepare and submit a quotation according to the detailed tender documents that will be published in the next step of procurement/solicitation notice. Tender specifiations: General Contractor for Construction work, Flooring and Electrical Installation The SOW consists but is not limited to the following: - Dust Protection: temporary dust screen made of strong plastic sheeting around the demolishing area (floor to ceiling) - Site installation & Logistics Complications: City centre, vehicle access, hotel-office building in operation, neighbors, operating hours, restricted working hours, security measures - Demolition, removal and disposal of 2 half-walls: concrete bricks (length sum +14.5m, height=1.3m) and adjacent floor in all layers - Electrical installations Dismantling of switches, sockets, wiring in half walls and floors before demolition; new switches/sockets/wires to be installed in existing walls. - Filling of the area in the floor+ new flooring (screed, impact sound insulation, laminate flooring) - Site-Cleaning renovation area and all affected areas in the building Special requirements - The work will be carried out in short time slots (incl. night & weekend) while the facility remains in operation and in the presence of the employees and clients who should not be disturbed during the construction work - USG Security regulations - Clearance process for employees, cars, material on site - Safety and protective measures Execution periods Indicative construction schedule: 4-5 days in fall 2026
From Solicitation posted on Aug 07, 2026Notice history
1-
Solicitation LATEST Posted Aug 07, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
AUT