REMOVAL AND REMEDIATION OF BATS, BLDG. 1777 N4008526Q0010
Summary
AI-generated · Mar 27, 2026Remove and remediate a bat roost in Building 1777 at MCAS Cherry Point. Provide all labor, supplies, and equipment; work performed during regular hours (7:00 a.m. – 4:00 p.m., Monday–Friday, excluding federal holidays). The project includes sealing secondary entry points (cracks and holes larger than a dime) with caulk, steel wool, wire mesh, and flashing; installing one-way exclusion devices over primary entry/exit points to allow bats to exit but not re-enter; and leaving the devices in place for 5–10 days (extended in cool or rainy weather) to ensure all bats have left.
After all bats vacate, remove the exclusion devices and permanently seal the final entry points. Conduct hazardous waste cleanup of bat guano, urine-soaked insulation, and nesting debris with trained personnel wearing PPE, using moisture to minimize dust. Sanitize and deodorize the affected areas with professional disinfectants and enzymatic cleaners, and restore the area to its original condition, disposing of all debris off-base. Submit all required paperwork to the Contracting Officer after inspection and approval.
REMOVAL AND REMEDIATION OF BATS, BLDG. 1777 MARINE CORPS AIR STATION CHERRY POINT, NORTH CAROLINA 28533-0006 WORK ORDER #7571479 REGULAR WORKING HOURS The Government s regular working hours are from 0700 to 1600, Monday through Friday, except for Federal Holidays and other days specifically designated by the Contracting Office. The work must be completed prior to 1 May 2026 SCOPE OF WORK The intent of this project is to remove and remediate building 1777 of bats. The contractor shall provide all labor, supplies and equipment needed to complete this project. 2.1 Seal Secondary Entry Points The contractor shall seal all potential entry points cracks, gaps, or holes larger than a dime are sealed except for the primary exits identified during inspection. This prevents bats from finding an alternate way back in once the exclusion begins. Materials used include caulk, steel wool, wire mesh, and flashing. 2.2 Install One-Way Exclusion Devices One-way doors or exclusion netting are installed over the primary entry/exit points. These devices allow bats to leave the building to feed but prevent them from re-entering. Common devices include plastic netting, flexible tubes, or cones. 2.3 Monitoring Period The one-way doors are left in place for a minimum of 5-10 days to ensure all bats have successfully exited the roost. The duration may be extended during cool or rainy weather when bats are less active. 2.4 Final Sealing Once it is confirmed that all bats have vacated the building, the one-way devices are removed, and the final entry points are permanently sealed to complete the exclusion. 2.5 Hazardous Waste Removal Trained technicians wearing appropriate Personal Protective Equipment (PPE), including respirators, will remove all bat guano, urine-soaked insulation, and nesting debris. To minimize airborne dust, materials are often wetted down with a surfactant or disinfectant before removal. 2.6 Sanitization and Deodorization All affected areas are treated with professional-grade disinfectants and enzymatic cleaners to neutralize harmful pathogens (like the fungus that causes histoplasmosis) and eliminate persistent odors. Prior to leaving site, contractor shall conduct site cleanup and return area to its original condition. Removal of old equipment, debris and trash shall be removed and properly disposed of off MCAS Cherry Point base/government property. After inspection and approval, turn all paperwork form into the Contracting Officer. LOCATION MCAS Cherry Point, MACS-2 Squadron Headquarters Bldg. 1777.
From Combined Synopsis/Solicitation posted on Mar 26, 2026REMOVAL AND REMEDIATION OF BATS, BLDG. 1777 MARINE CORPS AIR STATION CHERRY POINT, NORTH CAROLINA 28533-0006 WORK ORDER #7571479 REGULAR WORKING HOURS The Government s regular working hours are from 0700 to 1600, Monday through Friday, except for Federal Holidays and other days specifically designated by the Contracting Office. The work must be completed prior to 1 May 2026 SCOPE OF WORK The intent of this project is to remove and remediate building 1777 of bats. The contractor shall provide all labor, supplies and equipment needed to complete this project. 2.1 Seal Secondary Entry Points The contractor shall seal all potential entry points cracks, gaps, or holes larger than a dime are sealed except for the primary exits identified during inspection. This prevents bats from finding an alternate way back in once the exclusion begins. Materials used include caulk, steel wool, wire mesh, and flashing. 2.2 Install One-Way Exclusion Devices One-way doors or exclusion netting are installed over the primary entry/exit points. These devices allow bats to leave the building to feed but prevent them from re-entering. Common devices include plastic netting, flexible tubes, or cones. 2.3 Monitoring Period The one-way doors are left in place for a minimum of 5-10 days to ensure all bats have successfully exited the roost. The duration may be extended during cool or rainy weather when bats are less active. 2.4 Final Sealing Once it is confirmed that all bats have vacated the building, the one-way devices are removed, and the final entry points are permanently sealed to complete the exclusion. 2.5 Hazardous Waste Removal Trained technicians wearing appropriate Personal Protective Equipment (PPE), including respirators, will remove all bat guano, urine-soaked insulation, and nesting debris. To minimize airborne dust, materials are often wetted down with a surfactant or disinfectant before removal. 2.6 Sanitization and Deodorization All affected areas are treated with professional-grade disinfectants and enzymatic cleaners to neutralize harmful pathogens (like the fungus that causes histoplasmosis) and eliminate persistent odors. Prior to leaving site, contractor shall conduct site cleanup and return area to its original condition. Removal of old equipment, debris and trash shall be removed and properly disposed of off MCAS Cherry Point base/government property. After inspection and approval, turn all paperwork form into the Contracting Officer. LOCATION MCAS Cherry Point, MACS-2 Squadron Headquarters Bldg. 1777.
From Combined Synopsis/Solicitation posted on Mar 31, 2026Notice history
2-
Combined Synopsis/Solicitation Posted Mar 26, 2026
-
Combined Synopsis/Solicitation LATEST Posted Mar 31, 2026View changes (1)
- Response Deadline: Apr 03, 2026 → Apr 06, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA