Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 2 notices 11 documents

Remediation and Restoration 6913G626Q300028

Solicitation 6913G626Q300028 Copied Notice ID 0c5bf868b66843be962084096bbfeec4 Copied TRANSPORTATION, DEPARTMENT OF — 6913G6 VOLPE NATL TRANS SYS CNTR
SAM.gov
Posted
May 24, 2026
Deadline
Jun 08, 2026
Set-aside
SBA
NAICS
238910
PSC
F999

Summary

AI-generated · May 23, 2026

Remediation and Restoration at two FAA facilities in Georgia (Conyers and Bloomingdale) to remove identified soil contamination, with all work performed in accordance with federal, state, and local requirements (following the most stringent requirement if conflicts exist). The contractor will carry out remedial action, disposal, and site restoration activities, and must adhere to the program’s scope and regulatory constraints.

The contractor must prepare and submit a draft Remediation and Restoration Work Plan within 10 business days after the project kickoff, detailing the technical approach and schedule for all soil remediation, disposal, and restoration activities. The plan should review Government-furnished information and use preliminary assessment/site investigation and remedial investigation data, plus estimated quantities from the SOW, as guides. It must specify disposal methods and all disposal facilities, with disposal sampling and paperwork handled by the contractor, while the government will perform all confirmatory sampling. The Work Plan must identify required permits and include a Site Safety and Health Plan and a brief Risk Management Plan that lists major site risks and mitigation strategies.

The purpose of this solicitation/quote is to provide support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at two facilities in the FAA Eastern Service Area (ESA) to remove identified soil contamination sites as cited hereunder. The FAA facilities to be addressed are located in Conyers, GA and Bloomingdale, GA. The FAA s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facilities above based on prior research, known historic operations and practices, and required cleanup actions or previously identified sites. The Contractor shall conduct all work in accordance with Federal, State and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirementThe Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below.. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for all sites including the identification of all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. The government will perform ALL confirmatory sampling required at the sites. Additionally, the work plan shall also identify any required permits needed to perform the work. Additional components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. (see SOW for more details).

From Combined Synopsis/Solicitation posted on May 22, 2026

The purpose of this solicitation/quote is to provide support to the Federal Aviation Administration (FAA) Facilities Environmental Cleanup (ECU) Program. As part of this effort, a Remedial Action (RA) will be conducted at two facilities in the FAA Eastern Service Area (ESA) to remove identified soil contamination sites as cited hereunder. The FAA facilities to be addressed are located in Conyers, GA and Bloomingdale, GA. The FAA s ECU Program has identified the potential for environmental and human health risks and/or liability associated with the facilities above based on prior research, known historic operations and practices, and required cleanup actions or previously identified sites. The Contractor shall conduct all work in accordance with Federal, State and local requirements. Where inconsistencies exist, the Contractor shall follow the most stringent requirementThe Contractor shall submit a draft Remediation and Restoration work plan (Work Plan) (where applicable) within ten (10) business days of the project kick-off meeting that addresses the project requirements below.. This task involves the preparation and submission of a draft and final Work Plan. The Work Plan shall detail the technical approach and schedule for conducting all contaminated soil remediation, disposal, and site restoration activities described below. To assist with preparation of the Work Plan, the contractor shall thoroughly review the Government-furnished information (GFI) for pertinent information. The removal quantities and depths in the Preliminary Assessment/Site Investigation and Remedial Investigation reports (if provided) are to be used as a guide along with the estimated total quantities listed in this SOW Section 2.2.2. The Work Plan shall describe methods and procedures for performing soil remediation, disposal, and restoration. Disposal methods must be detailed by the contractor for all sites including the identification of all disposal facilities where waste and debris is to be shipped. Disposal sampling and paperwork is the responsibility of the contractor. The government will perform ALL confirmatory sampling required at the sites. Additionally, the work plan shall also identify any required permits needed to perform the work. Additional components required with the Work Plan are the Site Safety and Health Plan (SSHP), which shall include personnel health and safety precautions to be followed. The work plan shall also include a brief Risk Management Plan that identifies major risks and hazards on each site and discusses ways to minimize these risks. (see SOW for more details).

From Combined Synopsis/Solicitation posted on May 24, 2026

Notice history

2
  1. Combined Synopsis/Solicitation Posted May 22, 2026 View
  2. Combined Synopsis/Solicitation LATEST Posted May 24, 2026
    No changes from previous notice

Details

Solicitation number 6913G626Q300028
Notice ID 0c5bf868b66843be962084096bbfeec4
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) F999
NAICS 238910
Place of performance Bloomingdale, Georgia
Archive date Jun 23, 2026

Award Information

Not yet awarded

Contacts

primary
Roland Regan

Email

Agency

TRANSPORTATION, DEPARTMENT OF
OFFICE OF THE SECRETARY
6913G6 VOLPE NATL TRANS SYS CNTR

Place of Performance

Bloomingdale, Georgia 31302
USA

Dates

Posted May 24, 2026 2 months ago
Last Updated Aug 06, 2026 1 day ago
Due Jun 08, 2026 1 month ago