Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 1 notice 16 documents

Remanufacture of Flap Drive Angle Gearbox Assembly FA8118-26-R-0003

Solicitation FA8118-26-R-0003 Copied Notice ID 5093999d2bbc49b89743961dbdd16f63 Copied DEPT OF DEFENSE — FA8118 AFSC PZABB
SAM.gov
Posted
Dec 11, 2025
Deadline
Dec 15, 2025
Set-aside
SBA
NAICS
336413
PSC
1680

Summary

AI-generated · Dec 12, 2025

Remanufacture of Flap Drive Angle Gearbox Assembly under a five-year IDIQ with defined minimum and maximum quantities. The contractor will perform remanufacture to like-new condition, supplying all necessary materials, facilities, labor, parts, equipment, and expertise, including packing and preservation. All work must meet the specified requirements and costs for all work specifications, technical orders, and Over and Above requests must be included in the quoted unit price; government payment for missing components will occur only after O&A review and approval. A Pre-Award Survey and/or Initial Production Evaluation are required, and funding is contingent on available appropriations, with no payment or obligation until funds are provided to the Contracting Officer.

New vendors must obtain qualification via a Source Approval Request (SAR) package submitted through the Tinker AFB Small Business Office. Access to technical data requires an official request by email, and drawings are obtainable through the JEDMICS system. Government-provided repair items, handling of items beyond remanufacture, and disposition directions require coordination with the Administrative Contracting Officer. The contract includes IUID marking per DFARS and requires compliance with NIST SP 800-171, with SPRS showing a score of 110 or a plan to achieve compliance if lower. Quantities are set per line item over the five-year period (e.g., minimum 40 and maximum 350 for line item 0001), and performance, surge, and data rights conditions apply as specified.

A 5-YEAR INDEFINITE DELIVERY INDEFINITE QUANTITY (IDIQ) MIN-MAX TYPE CONTRACT IS CONTEMPLATED. NOTE: It is anticipated that pricing of this action will be based on adequate price competition; therefore, offerors are not required to submit certified cost or pricing data at the time of proposal. However, if after receipt of proposals, it is determined that adequate price competition does not exist, a request for other than certified cost or pricing data may be required in accordance with FAR 15.403-1(b)(1). 52.232-18 Availability of Funds. As prescribed in 32.706-1(a), insert the following clause: Availability of Funds (Apr 1984) Funds are not presently available for this contract. The Government s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer. (End of clause) (a) A Pre-Award Survey and/or Initial Production Evaluation (IPE) is required. Details are provided in Appendix A, paragraphs 1.2 and 1.3 respectively. (b) The contractor shall furnish all material, plant facilities, labor, parts, equipment, and expertise necessary to perform the remanufacture required to restore the end item to a like-new condition. The contractor shall also accomplish ALL necessary packing and preservation and packaging. ALL work shall be completed in accordance with the requirements specified herein (including attachments hereto) and all costs associated with work specifications, technical orders, and/or cost associated with Over and Above request (excluding missing parts) shall be included in the unit price. The government shall only pay the contractor for missing components after review and approval of O&A request. No additional cost will be allowed (i.e.material handling, profit, direct or indirect costs). (c) Qualification requirements apply. Interested vendors that have not been previously qualified for this acquisition must submit a Source Approval Request (SAR) package to the Tinker AFB Small Business Office. For questions regarding the Tinker SAR Process or related issues, these inquiries should be submitted to the TAFB Small Business Office at: AFSC/SB, 3001 Staff Drive, Suite 1AG 85A, Tinker AFB, OK 73145-3009. Email: afsc.sb.workflow@us.af.mil Website: https://www.afsc.af.mil/units/sbo/index.asp. The actual SAR package submission itself shall be submitted electronically through DoD SAFE at https://safe.apps.mil/. DoD SAFE is a safe and secure option for large file submissions. If you have a PKI Certificate, the SAR can be sent directly to the email address below via DoD SAFE. If you do not have a PKI Certificate, then you must send a standard email message to the email address below and ask that they Request a Drop-Off to your email via DoD SAFE, which will enable you to be able to upload the SAR Submission Package documents to DoD SAFE. 429SCMS.SASPO.Workflow@us.af.mil For more information on the Strategic Alternate Sourcing Program, please visit: https://www.tinker.af.mil/Home/429SCMS-SASPO/ As prescribed in FAR 9.202(e), the contracting officer need not delay a proposed award in order to provide a potential offeror with an opportunity to demonstrate its ability to meet the standards specified for qualification. (d) In order to receive any technical data related to this acquisition, offerors must send an email request to Cliff Morgan at clifford.morgan.8@us.af.mil or Amy Gil at amy.gil@us.af.mil. Release of any data is subject to applicable data rights. The request shall be on company letterhead and include the applicable solicitation number, the specific data needed (including TO(s)), and a copy of the current, approved DD Form 2345. The form, including instructions for completing the form, is Page 4 of 56 FA8118-26-R-0003 available at: http://www.dtic.mil/whs/directives/infomgt/forms/forminfo/forminfopage2220.html. The Government is not responsible for incomplete, misdirected, or untimely requests.** In order to receive drawings contractors will need to request all needed drawings through the JEDMICS website: https://af-jedmics.navair.navy.mil/webjedmics/index.jsp. Contractors who need an account will need to complete the instructions at the above link. (e) GOVERNMENT PROPERTY FURNISHED FOR REPAIR (FAR 16.503(c)) Failure of the Government to furnish such items in the amounts or quantities described in the Schedule as estimated or maximum will not entitle the contractor to any equitable adjustment in price under the Government Property clause of the contract. (f) END ITEMS BEYOND REMANUFACTURE "Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements. Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the overhaul limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s). (g) If the contractor estimates that any item is not reparable (i.e. beyond overhaul), the Contractor shall promptly notify the administrative contracting officer in writing and shall not perform further overhaul on any such items except at the direction of the administrative contracting officer (ACO). Upon written confirmation from the ACO that a particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the ACO. Contractors are cautioned that until a contract is executed, any effort performed in support of the anticipated effort is performed strictly at their own risk and expense. There is no authorization to begin performance until the contractor has received a duly authorized contract signed by the Contracting Officer. Also, this request for proposal is not to be construed to mean that the award of a contract is assured, as the availability of funds, timely submission of all requested documents, and acceptance by both parties are prerequisite to any contract award. (h) Condemned units shall not be counted as production. (i) In the event there are component part(s) with long lead times, the awardee is responsible for securing necessary parts to meet the Government s required delivery schedule. (j) In the event that DFARS clause 252.217-7001, Surge Option, is invoked, quantities and prices will be negotiated at that time. The fill-in data in Clause 252.217-7001 will be TBD until a surge is known and negotiations are necessary. (k) Item Unique Identification (IUID) marking is required in accordance with DFARS 252.211-7003. Contractor determined location and method of marking is acceptable. (l) All quantities specified herein represent the total contract quantities for all five years combined. The ordering period for each line item shall extend from the contractual effective data to five years thereafter or until the maximum quantity for each line item is reached, whichever comes first. The minimum and maximum quantities for each line item are as follows: Line Item 0001 NSN: 1680-00-335-6816 Minimum Quantity: 40each Maximum Quantity: 350 each Line Item 0002 Over & Above Line Item 0003 Data (m) This Solicitation contemplates award of a five-year Indefinite Delivery Indefinite Quantity (IDIQ) Type Contract. Reference Clauses 52.216-19 Delivery-Order Limitations, 52.216-22 Indefinite Quantity and 252.216-7006 Ordering. (n) Some units of items listed in Section B may, upon disassembly and/or inspection, be determined to be beyond the remanufacture limits specified in the Work Specification and/or Technical Orders. Any cost for work performed by the Contractor prior to determination that such equipment is beyond these limits, shall be included in the unit price(s) of the listed item(s). (o) In accordance with the attached CAV AF Reporting Requirements (see the document listed in Section J), the contractor must include a DD1348-1when assets are shipped. DCMA Quality Assurance Representatives (QARs) will not approve or sign the Page 5 of 56 FA8118-26-R-0003 DD1348-1, but will ensure DD1348-1 is included with each returned asset. If a DD1348-1 is not included with each returned asset, DCMA will not sign the DD250. (p) In accordance with DAFFARS 5309.105-1 the Supplier Performance Risk System (SPRS) is checked for supplier risk assessments when determining responsibility. DFARS 252.204.7303(b) states that the contracting officer shall verify that the summary level score of a current NIST SP 800-171 DoD Assessment (i.e., not more than 3 years old, unless a lesser time is specified in the solicitation) for each covered contractor information system that is relevant to an offer, contract, task order, or delivery order are posted in Supplier Performance Risk System (SPRS). Offerors are required to represent they will implement National Institute of Standards and Technology (NIST) Special Publication (SP) 800-171 SP 800-171 (reference the provision DFARS 252.204-7008). A score of 110 must be in SPRS, if assessment score is less than 110, contractors must submit a plan with their proposal to become compliant.

From Solicitation posted on Dec 11, 2025

Notice history

1
  1. Solicitation LATEST Posted Dec 11, 2025 View

Details

Solicitation number FA8118-26-R-0003
Notice ID 5093999d2bbc49b89743961dbdd16f63
Notice type Solicitation
Product / Service (PSC) 1680
NAICS 336413
Archive date Dec 30, 2025

Award Information

Not yet awarded

Contacts

primary
Nonika Allen

Email

secondary
Amy Gil

Email

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE MATERIEL COMMAND
AIR FORCE SUSTAINMENT CENTER
FA8118 AFSC PZABB

Dates

Posted Dec 11, 2025 7 months ago
Last Updated Aug 06, 2026 1 day ago
Due Dec 15, 2025 7 months ago