Relocation and Calibration of Mobile Space Saver Racking System FA4600_Warehouse_Transition
Summary
AI-generated · Feb 13, 2026Provide all labor, tools, and equipment to relocate one high-density mobile storage system by disassembling, transporting, and reassembling it. The system comprises four rows of shelving with Vidmar-style drawers mounted on a three-rail sliding track. Work begins with disassembly in Building 301D: inventory components, safely remove drawers, and dismantle the shelving and track. Securely transport all components to Building 504, then reassemble and calibrate: install and level the three-rail track to manufacturer specifications, reconstruct the four shelving rows, reinstall the Vidmar drawers, and verify the sliding mechanism operates smoothly. Complete site restoration by disposing of all packing materials and debris at both locations.
This is a market capability assessment; interested vendors should submit a capabilities statement demonstrating they can perform the disassembly, transport, reassembly, calibration to manufacturer specs, and site cleanup for this mobile storage system.
All interested vendors should submit a capabilities statement via email to the Contracting Specialist SrA Janiya Brown at janiya.brown.1@us.af.mil and SSgt Thearith.em@us.af.mil 1.0 Vision Statement The contractor shall provide all labor, tools, and equipment necessary to disassemble, transport, and reassemble one (1) high-density mobile storage system. 2.0 Scope of Work The system footprint is approximately 19 x 19 x 8.5 , consisting of four (4) rows of shelving integrated with Vidmar-style drawers, mounted on a three-rail sliding track system. ? Disassembly (Bldg 301D): Contractor shall inventory all components, safely remove Vidmar drawers, and disassemble the shelving units and the three-rail track system. ? Transportation: Secure transport of all components from Bldg 301D to Bldg 504. ? Reassembly & Calibration (Bldg 504): * Install and level the 3-rail system to manufacturer specifications. ? Reconstruct the 4 rows of shelving. ? Reinstall Vidmar drawers and ensure smooth mechanical operation of the sliding mechanism. ? Site Restoration: Dispose of all packing materials and debris from both sites.
From Sources Sought posted on Feb 12, 2026Notice history
1-
Sources Sought LATEST Posted Feb 12, 2026
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
USA