Rehabilitate Aircraft Hangar, Moore Air Base, Texas JR1154671
Summary
AI-generated · Aug 27, 2025Renovate a WWII-era hangar at Moore Air Base in Edinburg, Texas (about 22,000 square feet with a 30-foot ceiling) that was damaged by 24 inches of floodwater in 2019. The work is split into three phases: Phase 1 covers exterior and structural repairs and the roof, including replacing exterior window frames, doors, and metal siding; Phase 2 remodels front-of-hangar interiors and spaces (break room, offices, locker room, restrooms, avionics room), upgrades HVAC, brings areas into code compliance and ADA readiness, adds fire suppression to the lean-to/shed, and provides infrastructure for a future security system and Wi‑Fi; Phase 3 handles exterior landscape and main-floor work, including repairing and painting interior exterior walls and structural components, repainting interior roof structures, installing four Big Ass Fans or equivalents with individual controls, maintaining hangar roll doors (bearings and tracks), adding fire suppression and a fire pump to the main hangar, and installing an underground storage tank for the fire suppression system.
Estimated value is $5 million to $10 million. Bids will be limited to eligible small businesses. The solicitation will be posted later this year with amendments on the procurement site; questions should be directed to the contracting officer.
The U.S. Department of Agriculture (USDA), Animal and Plant Health Inspection Service (APHIS), has a hangar in need of renovation at Moore Air Base, Edinburg, Texas. The hangar was constructed between 1941 and 1943 during World War II as part of the Army Training Command. The hangar is approximately 22,000 sf with a ceiling height of roughly 30 feet. In 2019 Moore Air Base flooded, and approximately 24 inches of water flooded the hangar. The water caused significant damage to several areas of the hangar including several rooms. Construction design documents divide the project into three separate and distinct phases: Phase 1 Exterior and Structural Structural repairs and roof. Replace exterior window frames, man doors, and exterior metal siding. Phase 2 Interior Rooms and Spaces at Front of Hangar Remodel and replace areas in front of the hangar. Condition the following spaces: break room, offices, locker room, restrooms, and avionics room. Update HVAC system. Update area for building code compliance and ADA requirements. Add fire suppression to the lean-to/shed area of the hangar. Provide infrastructure for the future installation of security system and wi-fi. Phase 3 Exterior Landscape and Hangar Main Floor Area Repair and paint the interior surfaces of the exterior wall and structural components. Repair and paint all interior surfaces of the interior roof structure. Add four Big Ass Fans or equivalent with individual controls. Conduct maintenance (bearings and tracks on the main hangar roll doors). Add fire suppression and fire pump to the main hangar area. Install underground storage tank for fire suppression system. The NAICS code for this project is 236220, with a small business size standard of $45 million. The estimated magnitude of the project is between $5M and $10M. The project will be set aside for small business concerns only. The solicitation will be posted on or about July 17, 2025. It is the responsibility of interested parties to monitor this site for the solicitation and amendments, if any. Questions concerning this synopsis should be directed to Jim Roloff, contracting officer, at james.g.roloff@usda.gov.
From Presolicitation posted on Jul 03, 2025Notice history
1-
Presolicitation LATEST Posted Jul 03, 2025
Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA