Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 1 notice 3 documents

Refurbish/Repaint Antenna Towers 697DCK-26-R-00351

Solicitation 697DCK-26-R-00351 Copied Notice ID 1f7d5ba906e74f838963fb1f77452f43 Copied TRANSPORTATION, DEPARTMENT OF — 697DCK REGIONAL ACQUISITIONS SVCS
SAM.gov
Posted
Jun 29, 2026
Deadline
Jul 20, 2026
Set-aside
SBA
NAICS
238320
PSC
Z1BG

Summary

AI-generated · Jun 30, 2026

Refurbish/repaint antenna towers requires comprehensive surface preparation and coating work with strict hazardous-material controls. Surface prep must remove contaminants and use SSPC-SP 2/3/11 as needed, with debris containment and daily cleanup to prevent off-site drift. The contractor must review the FAA sampling results showing lead-based paint, PCB presence (not detected on some towers but assumed present), and chromium/cadmium; develop a project-specific Health and Safety Plan, implement a Class 3P containment, and dispose all hazardous waste per CT DEP and EPA rules with proper manifests. Submittals are required, and work must comply with OSHA, EPA, and SSPC/AMPP standards.

Coating sequence includes a spot prime coat of Tnemec Series 135 Chembuild epoxy (color 1243 Metallic Aluminum) at 4–6 mil DFT, a full coat of the same epoxy (color DC74 Off-White) at 4–6 mil DFT, and a final finish coat of Tnemec Series 1095 Endura-Shield polyurethane at 2.5–3.5 mil DFT on exterior surfaces. Thickness must be measured per SSPC-PA 2 (4 sets of 3 readings per coat per tower) with results provided to the FAA. Additional tasks include keeping the ladder/safety system coating limited to mounting areas, removing any stray paint from the fall-arrestor channel, removing rust at base conduit threads, applying a concrete sealer to foundations, and replacing the base ground/rigid conduit assembly with an ASTM A325 galvanized bolted connection and a new hot-dip galvanized steel platform plate (2.5 x 2.5 ft) with re-drilled bolts. The contractor must review as-built drawings, protect underground cables, plan for project phasing, and note a potential Option to price separately to coat 200 additional hot-dip galvanized lattice towers.

SCOPE OF WORK: 1. Surface preparation: i. Remove any visible oil, grease or salt contaminants. ii. All steel surfaces must be prepared in accordance with SSPC-SP 2 (Hand Tool Cleaning), SSPC-SP 3 (Power Tool Cleaning) and SSPC-SP 11 (Power-Tool Cleaning to Bare Metal) Standards. SP11 must only take place when necessary. Following hand and power tool cleaning, all surfaces must be brushed, blown clean with compressed air or vacuumed to remove all dust, and debris before the application of any coating. The Contractor must prevent the migration of debris, paint chips and dust to adjacent properties. All debris must be collected at the end of each workday. No debris must be left on-site overnight, and the premises must be returned to a clean condition upon completion of work. iii. Hazardous Materials Requirements: The FAA completed lead, heavy metal (chromium and cadmium) and polychlorinated biphenyl (PCB) sampling on the 75 towers which were found to be detected. The contractor must review the attached sampling report to ensure awareness of the presence of hazardous materials and must ensure that all surface preparation work must comply with all local, state and federal requirements. 1. Summarized Results: Tower A: Detected lead-based paint, polychlorinated biphenyls, chromium and cadmium. Tower B: Detected lead-based paint, chromium and cadmium. PCBs were found to be not detected but Contractor must assume PCBs are present. Tower C: Detected lead-based paint, polychlorinated biphenyls, chromium and cadmium. Tower references are shown in a diagram in the last page of the sampling report. a. Contractor must submit on a project specific Health and Safety Plan mitigating all hazard identified in the tower sampling report. All work must be completed in accordance with OSHA, EPA, SSPC/AMPP Standards and all other relevant standards. The Contractor must have a class 3P containment to prevent debris from spreading outside the worksite. See submittal section for all required submittals. b. All waste must be disposed according to Connecticut Department of Energy and Environmental Protection and EPA regulations and disposed at waste facilities that accept the associated hazardous materials. c. Contractor must provide a manifest in accordance with all federal, state and local standards. 2. Spot Prime Coat: All bare steel surfaces must receive one spot prime coat of Tnemec Series 135 Chembuild epoxy, or approved equal, in color 1243 Metallic Aluminum at 4-6 mil Dry Film Thickness (DFT). Follow all manufacturer requirements. 3. Full coat: Apply full coat of Tnemec Series 135 Chembuild epoxy, or approved equal, in color DC74 Off-White at 4-6 mil DFT on all exterior surfaces. Follow all manufacturer requirements. 4. Full Finish Coat: Apply one full finish coat of Tnemec Series 1095 Endura-Shield polyurethane, or approved equal, at 2.5-3.5 mils DFT on all exterior surfaces. Follow all manufacturer requirements. 5. The towers are equipped with a ladder and rail combination MSA dynaglide ladder safety system. The ladder safety system is hot dip galvanized, approximately 15 years old and in good condition. The contractor must only prepare and coat the ladder where it mounts to the tower. The Contractor must remove any paint that is mistakenly placed inside the fall arrestor channel, so it does not affect the performance of the system. 6. Remove rust at the conduit threads at the base of each tower. Coat with above coating system. 7. Measure thickness of coatings according to SSPC-PA 2. Take 4 sets of 3 individual readings per tower for each coat. Provide to the FAA copies of these results. 8. Apply new silane concrete sealer to existing exposed concrete foundation surfaces. 9. At the base of each tower is a bare #6 ground, partially in rigid conduit, that is clamped to a tower leg with a washer and structural bolt. Remove the #6 and associated rigid conduit to 1.5 below grade. Remove the existing bolt that was used to clamp the #6 and replace with an ASTM A325 bolted connection to include bolt, hardened washer, nut and palnut. Bolted connection must be hot dip galvanized. Contractor to verify dimensions on site. 10. Contractor must install a new hot dip galvanized 1/4 thick A36 steel plate in the middle of the platform on each tower. Plate dimension is approximately 2.5 x2.5 . The purpose of the steel plate is to cover an existing hole in the platform where a piece of equipment was removed. Redrill the existing six 3/8 bolt holes to and install new ASTM A325 bolted connection. Contractor must verify and review all dimensions with the FAA. Contractor must remove the existing 3 metal strips and six bolts that currently cover the platform opening. 11. The Contractor must review the provided as builts to ensure construction operations do not impact any existing equipment. The Contractor must protect the underground communication cables that travel from each tower to the stub ups at the building from heavy equipment. 12. The Contractor must be aware and plan for project phasing requirements that are listed below in the SOW. 13. Potential Additional Work (Contract Option #1): The Contractor must provide separate line-item pricing as part of their base bid proposal to coat the 200 hot dip galvanized steel lattice tower. Based on funding, this option may or may not be added to the contract.

From Solicitation posted on Jun 29, 2026

Notice history

1
  1. Solicitation LATEST Posted Jun 29, 2026

Details

Solicitation number 697DCK-26-R-00351
Notice ID 1f7d5ba906e74f838963fb1f77452f43
Notice type Solicitation
Product / Service (PSC) Z1BG
NAICS 238320
Place of performance Shelton, Connecticut
Archive date Aug 04, 2026

Award Information

Not yet awarded

Contacts

primary
Ms. Joni Haynes

Email

Agency

TRANSPORTATION, DEPARTMENT OF
FEDERAL AVIATION ADMINISTRATION
697DCK REGIONAL ACQUISITIONS SVCS

Place of Performance

Shelton, Connecticut
USA

Dates

Posted Jun 29, 2026 1 month ago
Last Updated Aug 06, 2026 2 days ago
Due Jul 20, 2026 2 weeks ago