Railway Auto Lift - Auto Lifter W519TC25Q0005
Summary
AI-generated · Aug 23, 2025Auto Lift Rail Lifter is a life-cycle replacement for Maintenance of Way equipment used to lift one or both rails to a set height so tie plates can be inserted safely between the rail and ties. It enables safe, efficient tie-plate insertion and supports high production for railway maintenance across over 100 miles of Army rail track. Quotes must be emailed to two designated contacts by June 2, 2025 at 1:00 PM Central, with questions submitted via the Excel tool (attachment 0003) by May 22, 2025 at 10:00 AM Central.
As of June 30, 2025, the Modular Office Blank Technical Evaluation Form Nadler IT cabling change order is not applicable and has been removed from this solicitation. Additionally, bidders must include a separate line-item for the Auto Lift - Rail Lifter trade-in value.
The Auto Lift - Rail Lifter is a self-propelled piece of rail transport Maintenance of Way (MOW) equipment that automatically lifts one or both rail tracks to a specific height so that plates can be inserted between the rail and the rail tie. The Auto Lift Rail Lifter allows the equipment operator(s) to ensure tie plate insertion and positioning is completed safely and properly. The Auto Lift Rail Lifter supports high production levels while performing railway maintenance. The life-cycle replacement of the requested Maintenance of Way (MOW) Auto Lift Rail Lifter is essential to the maintenance of over 100 miles of rail track owned by the Department of the Army. Quotes are to be submitted via email; please address to both Points of Contact (below). Quotes are due NLT 02 June 2025 at 1 P.M. (1300) U.S. Central time. Questions to the Government are to be submitted via the excel tool (attachment 0003) and are due No Later Than (NLT) 22 May 2025 at 10 A.M. (1000) U.S. Central Time.
From Solicitation posted on Jun 24, 2025The Auto Lift - Rail Lifter is a self-propelled piece of rail transport Maintenance of Way (MOW) equipment that automatically lifts one or both rail tracks to a specific height so that plates can be inserted between the rail and the rail tie. The Auto Lift Rail Lifter allows the equipment operator(s) to ensure tie plate insertion and positioning is completed safely and properly. The Auto Lift Rail Lifter supports high production levels while performing railway maintenance. The life-cycle replacement of the requested Maintenance of Way (MOW) Auto Lift Rail Lifter is essential to the maintenance of over 100 miles of rail track owned by the Department of the Army. Quotes are to be submitted via email; please address to both Points of Contact (below). Quotes are due NLT 02 June 2025 at 1 P.M. (1300) U.S. Central time. Questions to the Government are to be submitted via the excel tool (attachment 0003) and are due No Later Than (NLT) 22 May 2025 at 10 A.M. (1000) U.S. Central Time. Note that as of 30 June 2025, the Modular Office Blank Technical Evaluation Form Nadler IT cabling change order is NOT applicable to this solicitation and is hereby removed. Additionally, include a separate line-item for the Auto Lift - Rail Lifter trade-in value.
From Solicitation posted on Jun 30, 2025Notice history
2Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA