PW-North Herbicide-Pesticide Application IDIQ W9126G25QA009
Summary
AI-generated · Aug 24, 2025Provide all personnel, equipment, supplies, facilities, transportation, tools, vehicles, materials, management, supervision, inspection, and other non-personal services necessary to perform herbicide and pesticide treatments at Lake O the Pines, Lake Wright Patman, and Jim Chapman/Cooper Lake to the standards defined in the Performance Work Statement, with government-furnished items limited to those specified. Perform nuisance vegetation and insect control, including per-acre spraying in open parks and mowing areas to address winter broadleaf weeds and grass growth, and ensure all work complies with the contract, applicable laws, municipal codes, and directives from the Contracting Officer or designated representative. All pesticides must be used per their label; if lake water is used for dilution, batched herbicides must be applied within 30 minutes of mixing.
The Government will provide herbicides, insecticides, and surfactants for each application, along with tank-mix instructions. Minimum gallons-per-acre will be determined at application time based on method and vegetation; dye indicators must be included with all herbicide applications at a 0.25% ratio, and dye indicators are to be provided by the contractor. The ordering period consists of a one-year base with four 12-month option periods and a six-month extension option (52.217-8).
W9126G25QA009 Amd_No_0001 - The contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, vehicles, materials, management, supervision, inspection, and other items and non-personal services necessary to effectively perform herbicide and pesticide treatment services as defined in this Performance Work Statement except for those items specified as Government furnished property and services. The contractor shall perform to the standards in this contract. Perform herbicide and pesticide contract, consisting of herbicide and pesticide application for the treatment of nuisance or unwanted vegetation and insects at Lake O the Pines, Lake Wright Patman, and Jim Chapman/Cooper Lake. The KTR shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to effectively perform herbicide and pesticide services at the specified locations and to standards as defined in this Performance Work Statement. All pesticide shall be applied in strict accordance with manufacture s product labeling. If lake water is used for dilution in tank mixture, batched herbicides must be applied within 30 minutes of mixing with water. The Contractor will ensure that all work is accomplished in accordance with the contract, all applicable laws, municipal codes, regulations and/or written directives issued by the Contracting Officer (KO) or the authorized representative of the Contracting Officer (COR), if applicable. In addition, grasses and weeds may be sprayed on a per acre basis in open park and mowing areas for the control of winter broadleaf weeds and growth suppression of grasses. The Government shall provide herbicides, insecticides, and surfactants for each application under this line item, as well as tank mixture instructions. Minimum gallons per acre (GPA) will be determined at time of application depending on application method and present vegetation. Dye indicators shall be included with all herbicide applications at a 0.25% ratio unless otherwise specified by project specific POC. Dye indicators shall be provided by contractor. Ordering period will be a one-year base, four 12-month option periods, and a 6-month extension option (52.217-8). PLEASE SEE ATTACHED PRE-SOLICITATION NOTICE W9126G25QA009 AMD#0001 FOR ADDITIONAL INFORMATION REGARDING THIS PROCUREMENT ACTION.
From Presolicitation posted on Jul 02, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance