Purchase and Delivery of One (1) Prefabricated Modular Classroom to Aviano Air Bases, Italy FA568225Q8040
Summary
AI-generated · Aug 24, 2025Purchase and delivery of one prefabricated modular classroom to Aviano Air Base, Italy, designed to support training for 30 personnel wearing military protective equipment. The unit measures 12,000 mm in length by 7,200 mm in width with a 2,700 mm ceiling height, and its base frame, perimeter corner profiles, and roof frame must be fabricated from thick press-formed galvanized steel profiles.
It must include electrical outlets and be capable of receiving electrical power, have communication port connections, contain functioning windows and at least one door for accessibility and ventilation, and provide temperature control to ensure comfort during training activities. See the attached Combined Synopsis/Solicitation document for additional details.
Purchase and delivery of 1 prefabricated modular classroom that meets the following specifications: Dimensions: Length: 12,000 mm Width: 7,200 mm Ceiling Height: 2,700 mm Base Frame: Constructed from thick press-formed galvanized steel profiles. Perimeter Corner Profiles: Made of thick press-formed galvanized steel. Roof Frame: Fabricated using thick press-formed galvanized steel profiles. Capacity: Must support training courses for 30 personnel engaged in rigorous activity while wearing military protective equipment. Electrical Requirements: Must include outlets and be capable of receiving electrical power. Communication Ports: Must have communication port connections Windows and Doors: Must include functioning windows and at least one door for accessibility and ventilation. Temperature Control: Must have the ability to be temperature controlled to ensure comfort during training activities. The classroom will be delivered to Aviano Air Base, ITA. See attached Combined Synopsis / Solicitation document for more details.
From Combined Synopsis/Solicitation posted on Aug 12, 2025Purchase and delivery of 1 prefabricated modular classroom that meets the following specifications: Dimensions: Length: 12,000 mm Width: 7,200 mm Ceiling Height: 2,700 mm Base Frame: Constructed from thick press-formed galvanized steel profiles. Perimeter Corner Profiles: Made of thick press-formed galvanized steel. Roof Frame: Fabricated using thick press-formed galvanized steel profiles. Capacity: Must support training courses for 30 personnel engaged in rigorous activity while wearing military protective equipment. Electrical Requirements: Must include outlets and be capable of receiving electrical power. Communication Ports: Must have communication port connections Windows and Doors: Must include functioning windows and at least one door for accessibility and ventilation. Temperature Control: Must have the ability to be temperature controlled to ensure comfort during training activities. The classroom will be delivered to Aviano Air Base, ITA. See attached Combined Synopsis / Solicitation document for more details. AMENDMENT 1 - 12 SEPTEMBER 2025 - The purpose of this amendment is to extend the solicitation deadline from 15 September 2025 @ 1000 CET to 18 September 2025 @ 1600 CET.
From Combined Synopsis/Solicitation posted on Sep 12, 2025Purchase and delivery of 1 prefabricated modular classroom that meets the following specifications: Dimensions: Length: 12,000 mm Width: 7,200 mm Ceiling Height: 2,700 mm Base Frame: Constructed from thick press-formed galvanized steel profiles. Perimeter Corner Profiles: Made of thick press-formed galvanized steel. Roof Frame: Fabricated using thick press-formed galvanized steel profiles. Capacity: Must support training courses for 30 personnel engaged in rigorous activity while wearing military protective equipment. Electrical Requirements: Must include outlets and be capable of receiving electrical power. Communication Ports: Must have communication port connections Windows and Doors: Must include functioning windows and at least one door for accessibility and ventilation. Temperature Control: Must have the ability to be temperature controlled to ensure comfort during training activities. The classroom will be delivered to Aviano Air Base, ITA. See attached Combined Synopsis / Solicitation document for more details. AMENDMENT 1 - 12 SEPTEMBER 2025 - The purpose of this amendment is to extend the solicitation deadline from 15 September 2025 @ 1000 CET to 18 September 2025 @ 1600 CET. AMENDMENT 2 - 18 SEPTEMBER 2025 - The purpose of this amendment is to extend the solicitation deadline from 18 September 2025 @ 1000 CET to 10 October 2025 @ 1600 CET.
From Combined Synopsis/Solicitation posted on Sep 18, 2025Notice history
3-
-
Combined Synopsis/Solicitation Posted Sep 12, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Sep 15, 2025 → Sep 18, 2025
-
Combined Synopsis/Solicitation LATEST Posted Sep 18, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Sep 18, 2025 → Oct 10, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
ITA