Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 1 notice 1 document

Pump,Rotary SPRMM126QME86

Solicitation SPRMM126QME86 Copied Notice ID 0023f02220f74c499bfc3b0574289f3f Copied DEPT OF DEFENSE — SPRMM1 DLA MECHANICSBURG
SAM.gov
Posted
Apr 15, 2026
Deadline
Apr 23, 2026
Set-aside
SBA
NAICS
333914
PSC
4320

Summary

AI-generated · Apr 16, 2026

Rotary pump procurement with no drawings or technical data provided. Quotes must be submitted via electronic data interchange (EDI) and should note any exceptions (mil specs/standards, packaging, inspection & acceptance, etc.) or include a hard copy of the exceptions. If you’re not the manufacturer, identify the Original Equipment Manufacturer (OEM), provide the OEM’s CAGE code and the specific part number offered, and supply an email contact for follow-up. Vendors are encouraged to register for the PIEE/EDA system to view orders and receive automated notices; invoices and receiving reports must be submitted electronically through PIEE-WAWF. Delivery timeframe is not specified in the notice, and inspections/acceptance occur at origin.

Award is expected using Lowest Price Technically Acceptable (LPTA). The procurement is issued under SEPA-EAF authority. Any request to change production facilities must be approved by the Contracting Officer and must meet four conditions, including a required $250 price reduction to cover administrative costs; the Government reserves the right to deny approval even if conditions are met. Inspections and final acceptance occur at origin.

1. All contractual documents (i.e. contracts, purchase orders, task orders, Delivery orders, and modifications) related to the instant procurement are considered to be "issued" by the government when copies are either deposited in the mail, transmitted by facsimile, or sent by other electronic commerce methods, such as email. The government's acceptance of the contractor's proposal constitutes bilateral agreement to "issue" contractual documents as detailed herein. 2. Drawings or technical data are not available for this item. 3. Delivery days _________ aro. 4. Offer valid for _____ days. 5. When submitting quotes via Electronic Data Interchange (EDI), make sure you specify any exceptions (i.e. Mil specs/standards, packaging, Inspection & Acceptance (I&A), packaging houses etc) or follow up with a hardcopy of the exceptions. If nothing is indicated or received, award will be based upon solicitation requirements. Changes or requests for changes after award will have consideration costs deducted on modifications. 6. If you are not the manufacturer of the material you are offering, you MUST state who the Original Equipment Manufacturer (OEM) is Commercial and Government Entity Code (CAGE) code) and the part number you are offering. 7. Please provide an email address for follow up communications. ____________________________________________________________ 8. It is recommended that vendors provide contact information to NAVSUP Weapon System Support (WSS) Mechanicsburg in order to receive automated notifications from Navy Electronic Commerce Online (NECO) when contracts/modifications are issued by Defense Logistics Agency (DLA) Weapons Support Mechanicsburg and posted on Procurement Integrated Enterprise Environment (PIEE) Electronic Data Access (EDA). To receive these notifications, contact: NAVSUPWSS code 025, procurement systems design and contract support division Via email at NAVSUPWSSITIMPHelpdesk@navy.mil. Please include the following information with your request: CAGE code, company name, address and Point-of-Contact (POC) with phone number and email address. 9. Contractors can view their orders, contracts and modifications at the EDA web tool. This web tool is located at the PIEE website. It is recommended that the contractor register for EDA at https://piee.eb.mil/. Click on new user and registration. Any order resulting from this Request for Quotation will require electronic submittal of Invoice and Receiving Report (COMBO) through PIEE-WAWF. 10. The following DLA Procurement Notes are applicable to this requirement: E06 Inspection and Acceptance at Source (JUN 2018) 11. INSPECTION OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ INSPECTION OF PACKAGING AND FINAL ACCEPTANCE OF MATERIAL WILL BE AT (CAGE & ADDRESS): ______________________________________________________________ 12. UCF SECTION F PRODUCTION FACILITY CHANGES (a) The performance of any of the work contracted for in any place other than that named in the contract is prohibited unless specifically approved by the Contracting Officer. Written requests for a change in production facilities must be submitted in writing to the Contracting Officer. Changes in production facilities may be approved, provided: (1) Performance by small business or in labor surplus areas as required by the contract will not be changed; (2) The change will not cause a delay in delivery or necessitate a change in the purchase description; (3) The free on board (f.o.b.) point is not changed; and (4) Each request is supported by a price reduction of $250.00 to cover the Government's administrative costs to process the change. (b) The Government reserves the right to deny approval even if these four elements are met. 13. Award evaluations will be made using the Lowest Price Technically Acceptable (LPTA) criteria per DFARS 215.101-2-70(a)(1)(i). 14. This solicitation is being issued under SEPA-EAF Authority. INSPECTION AT ORIGIN ACCEPTANCE AT ORIGIN POC EMAIL: AMANDA.HELLER@DLA.MIL

From Solicitation posted on Apr 15, 2026

Notice history

1
  1. Solicitation LATEST Posted Apr 15, 2026 View

Details

Solicitation number SPRMM126QME86
Notice ID 0023f02220f74c499bfc3b0574289f3f
Notice type Solicitation
Product / Service (PSC) 4320
NAICS 333914
Place of performance USA
Archive date May 08, 2026

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Amanda Heller

Email

Agency

DEPT OF DEFENSE
DEFENSE LOGISTICS AGENCY
DLA MARITIME
DLA MARITIME MECHANICSBURG
SPRMM1 DLA MECHANICSBURG

Place of Performance


USA

Dates

Posted Apr 15, 2026 3 months ago
Last Updated Aug 06, 2026 2 days ago
Due Apr 23, 2026 3 months ago