Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 7 notices 6 documents

Pumping Assembly, Water SPRDL1-24-R-0166

Solicitation SPRDL1-24-R-0166 Copied Notice ID 1985aa171d484336ac13a75e6a0b85bb Copied DEPT OF DEFENSE — DLA LAND WARREN
SAM.gov
Posted
Dec 05, 2025
Deadline
Dec 05, 2025
Set-aside
SBA
NAICS
333914
PSC
4320

Summary

AI-generated · Aug 24, 2025

Water pumping assembly (600 GPM), P/N M53051-2-2, is being procured in a definitive contract with a 365-day option for 14 basic and 14 option units. First Article Testing is required, with a waiver option available and government approval needed before production quantity can be manufactured. The product must meet MIL-PRF-53051D standards, and the SOW includes provisioning data, technical manuals, packaging data, security and hazardous-material data, all organized as narratives, CDRLs, and attachments. The solicitation comprises extensive documentation (21 CDRLs and 17 attachments); bidders must review all requirements and access the CDRLs/attachments via the DoD Safe Site.

Between notices, presolicitation confirms FAT is required (no waiver noted) and that the eventual solicitation will include the SOW, provisioning data, technical publications data, packaging data, security and hazardous-material data, and related CDRLs/attachments. When released, bidders should thoroughly review the SOW and attachments. The key changes in the formal solicitation are the explicit FAT waiver option and the government-approval-before-production requirement, along with the inclusion of the full set of CDRLs/attachments and MIL-PRF-53051D reference materials.

Item: Pumping Assembly, Water NSN: 4320-01-691-1630 P/N: M53051-2-2 (CAGE 81349, Government) Qty: 14 each basic, 14 each option Packaging: Military A FOB: Origin Contract Type: Definitive contract with 100% option for 365 days Notes: This procurement is established as a 100% Total Small Business Set-Aside. First Article Testing (FAT) is required and Government approval must be obtained prior to manufacturing the production quantity. Part number M53051-2-2 (Water Pump, 600 GPM) is built utilizing the standards listed in MIL-PRF-53051D (dated 20 Apr 2022). A copy of the MIL-PRF is attached for your review. The solicitation will include a Statement of Work (SOW), with a list of provisioning data, technical manual publications data, packaging data, security and hazardous material data required by the Government. These details will be listed on the solicitation as narratives, Contract Data Requirements List (CDRL) and attachments. Once released, thoroughly review the solicitation document for all requirements prior to submitting your proposal.

From Presolicitation posted on Aug 18, 2025

Item: Pumping Assembly, Water NSN: 4320-01-691-1630 P/N: M53051-2-2 (CAGE 81349, Government) Qty: 14 each basic, 14 each option Packaging: Military A FOB: Origin Contract Type: Definitive contract with 100% option for 365 days Notes: This procurement is established as a 100% Total Small Business SetAside. First Article Testing (FAT) is required (provision for FAT waiver is allowed) and Government approval must be obtained prior to manufacturing the production quantity. Part number M53051-2-2 (Water Pump, 600 GPM) is built utilizing the standards listed in MIL-PRF-53051D (dated 20 Apr 2022). A copy of the MIL-PRF is attached in the Pre-Solicitation notice for this opportunity. The solicitation includes a Statement of Work (SOW) in Section C, with a list of provisioning data, technical manual publications data, packaging data, security and hazardous material data required by the Government. These details are listed on the solicitation as narratives, Contract Data Requirements List (CDRLs) and attachments. There are 21 CDRLs and 17 attachments that support the CDRLs. Thoroughly review the solicitation document for all requirements prior to submitting your proposal. ***** Contact the Contract Specialist to obtain all of the CDRL and attachment documentation via the DoD Safe Site. *****

From Solicitation posted on Aug 18, 2025

*** Amendment 0001 is issued to extend the proposal due date out to 10 Oct 2025 *** Item: Pumping Assembly, Water NSN: 4320-01-691-1630 P/N: M53051-2-2 (CAGE 81349, Government) Qty: 14 each basic, 14 each option Packaging: Military A FOB: Origin Contract Type: Definitive contract with 100% option for 365 days Notes: This procurement is established as a 100% Total Small Business SetAside. First Article Testing (FAT) is required (provision for FAT waiver is allowed) and Government approval must be obtained prior to manufacturing the production quantity. Part number M53051-2-2 (Water Pump, 600 GPM) is built utilizing the standards listed in MIL-PRF-53051D (dated 20 Apr 2022). A copy of the MIL-PRF is attached in the Pre-Solicitation notice for this opportunity. The solicitation includes a Statement of Work (SOW) in Section C, with a list of provisioning data, technical manual publications data, packaging data, security and hazardous material data required by the Government. These details are listed on the solicitation as narratives, Contract Data Requirements List (CDRLs) and attachments. There are 21 CDRLs and 17 attachments that support the CDRLs. Thoroughly review the solicitation document for all requirements prior to submitting your proposal. ***** Contact the Contract Specialist to obtain all of the CDRL and attachment documentation via the DoD Safe Site. *****

From Solicitation posted on Sep 17, 2025

*** Amendment 0003 is issued to extend the proposal due date out to 21 Nov 2025 *** *** Amendment 0002 is issued to extend the proposal due date out to 31 Oct 2025 *** *** Amendment 0001 is issued to extend the proposal due date out to 10 Oct 2025 *** Item: Pumping Assembly, Water NSN: 4320-01-691-1630 P/N: M53051-2-2 (CAGE 81349, Government) Qty: 14 each basic, 14 each option Packaging: Military A FOB: Origin Contract Type: Definitive contract with 100% option for 365 days Notes: This procurement is established as a 100% Total Small Business SetAside. First Article Testing (FAT) is required (provision for FAT waiver is allowed) and Government approval must be obtained prior to manufacturing the production quantity. Part number M53051-2-2 (Water Pump, 600 GPM) is built utilizing the standards listed in MIL-PRF-53051D (dated 20 Apr 2022). A copy of the MIL-PRF is attached in the Pre-Solicitation notice for this opportunity. The solicitation includes a Statement of Work (SOW) in Section C, with a list of provisioning data, technical manual publications data, packaging data, security and hazardous material data required by the Government. These details are listed on the solicitation as narratives, Contract Data Requirements List (CDRLs) and attachments. There are 21 CDRLs and 17 attachments that support the CDRLs. Thoroughly review the solicitation document for all requirements prior to submitting your proposal. ***** Contact the Contract Specialist to obtain all of the CDRL and attachment documentation via the DoD Safe Site. *****

From Solicitation posted on Oct 30, 2025

*** Amendment 0004 is issued to extend the proposal due date out to 05 Dec 2025 *** *** Amendment 0003 is issued to extend the proposal due date out to 21 Nov 2025 *** *** Amendment 0002 is issued to extend the proposal due date out to 31 Oct 2025 *** *** Amendment 0001 is issued to extend the proposal due date out to 10 Oct 2025 *** Item: Pumping Assembly, Water NSN: 4320-01-691-1630 P/N: M53051-2-2 (CAGE 81349, Government) Qty: 14 each basic, 14 each option Packaging: Military A FOB: Origin Contract Type: Definitive contract with 100% option for 365 days Notes: This procurement is established as a 100% Total Small Business SetAside. First Article Testing (FAT) is required (provision for FAT waiver is allowed) and Government approval must be obtained prior to manufacturing the production quantity. Part number M53051-2-2 (Water Pump, 600 GPM) is built utilizing the standards listed in MIL-PRF-53051D (dated 20 Apr 2022). A copy of the MIL-PRF is attached in the Pre-Solicitation notice for this opportunity. The solicitation includes a Statement of Work (SOW) in Section C, with a list of provisioning data, technical manual publications data, packaging data, security and hazardous material data required by the Government. These details are listed on the solicitation as narratives, Contract Data Requirements List (CDRLs) and attachments. There are 21 CDRLs and 17 attachments that support the CDRLs. Thoroughly review the solicitation document for all requirements prior to submitting your proposal. ***** Contact the Contract Specialist to obtain all of the CDRL and attachment documentation via the DoD Safe Site. *****

From Solicitation posted on Nov 13, 2025

** NOTE **: The below questions and answers regarding the Publications and Packaging CDRL portions of the solicitation are posted here for your reference: CDRL(s) A010, A011, A012 Question(s) 1. Is there a need for QTY (3) paper copies to be delivered at each of the 30%, 70%, and 100% completion stages of developing the Technical Manual? No, PDF copies delivered electronically are more than sufficient for PTM reviews. CDRL A014 Question(s) 1. Is there a reason that TM Quality Assurance Plan is included in this solicitation but not for larger contracts for an item manufactured to the same MIL-PRF-53051D? Pending an answer to this question 2. CD-ROMs went essentially obsolete in 2015. Is there a different method of delivery that the U.S. Government is amenable to? The Government still requires CD-ROMs to have a physical media record of the TMs. Packaging - Attachment 15 Question(s) 1. Section F calls out preserving all exterior unpainted metal surfaces in accordance with MIL-STD-2073 and coating said surfaces with preservative MIL-PRF-16173, Grade 1. In MIL-PRF-53051D, Section 3.10, it states that CARC paint shall not be applied to surfaces greater than 400F which means our metallic exhaust guard would not be painted. Is this coating able to be applied to surfaces greater than 400F? Additionally, is there a reason that preservative MIL-PRF-16173, Grade 1 is not listed in MIL-PRF-53051D anywhere? 2. Is there a MIL, ISO, FDA or some other standard that the corrosion preventative coating for food handling machinery and equipment must meet? Additionally, why is this not a requirement for the Type II - Pump Assembly, Water in MIL-PRF-53051D? The SPI calls out a preservative that can be used on bare metal when the item is in storage to prevent corrosion. I m not sure where MIL-PRF-53051D is coming from, it maybe from the PD, which would be engineering and could be focusing on the inside of the pump. If the contractor wants to use a different preservative on non-metal, it will need to be from MIL-STD-2073, Appendix J and that preservative would need to meet the functionality of MIL-PRF-016173. 3. As far as the packaging preservative goes, these systems are painted with Chemical Agent Resistant Coating (CARC) which has anti-corrosive properties already in it as called out in MIL-PRF-53051D which is the MIL-PRF that these systems are manufactured too. Additionally, they are required based on the solicitation to be delivered in heat treated wooden crates. Is the packaging team stating that the preservative needs to be applied to the wooden crate or the exterior of the unit? The internals of the pump system are already cast aluminum and stainless steel which are inherently corrosion resistant. I m not seeing where MIL-PRF-53051D was listed in packaging. I reviewed the pkg contract language and CDRLs and didn t see where it was mentioned. Did the contractor see that in the Purchase Description? If so, that would be an engineering question to answer. As far as the wooden crate, it needs to follow heat treatment requirements per DOD 4140.65M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material as laid out in Section D of the contract. *** Amendment 0004 is issued to extend the proposal due date out to 05 Dec 2025 *** *** Amendment 0003 is issued to extend the proposal due date out to 21 Nov 2025 *** *** Amendment 0002 is issued to extend the proposal due date out to 31 Oct 2025 *** *** Amendment 0001 is issued to extend the proposal due date out to 10 Oct 2025 *** Item: Pumping Assembly, Water NSN: 4320-01-691-1630 P/N: M53051-2-2 (CAGE 81349, Government) Qty: 14 each basic, 14 each option Packaging: Military A FOB: Origin Contract Type: Definitive contract with 100% option for 365 days Notes: This procurement is established as a 100% Total Small Business SetAside. First Article Testing (FAT) is required (provision for FAT waiver is allowed) and Government approval must be obtained prior to manufacturing the production quantity. Part number M53051-2-2 (Water Pump, 600 GPM) is built utilizing the standards listed in MIL-PRF-53051D (dated 20 Apr 2022). A copy of the MIL-PRF is attached in the Pre-Solicitation notice for this opportunity. The solicitation includes a Statement of Work (SOW) in Section C, with a list of provisioning data, technical manual publications data, packaging data, security and hazardous material data required by the Government. These details are listed on the solicitation as narratives, Contract Data Requirements List (CDRLs) and attachments. There are 21 CDRLs and 17 attachments that support the CDRLs. Thoroughly review the solicitation document for all requirements prior to submitting your proposal. ***** Contact the Contract Specialist to obtain all of the CDRL and attachment documentation via the DoD Safe Site. *****

From Solicitation posted on Dec 03, 2025

** NOTE **: The below questions and answers regarding the Publications and Packaging CDRL portions of the solicitation are posted here for your reference: CDRL(s) A010, A011, A012 Question(s) 1. Is there a need for QTY (3) paper copies to be delivered at each of the 30%, 70%, and 100% completion stages of developing the Technical Manual? No, PDF copies delivered electronically are more than sufficient for PTM reviews. CDRL A014 Question(s) 1. Is there a reason that TM Quality Assurance Plan is included in this solicitation but not for larger contracts for an item manufactured to the same MIL-PRF-53051D? The TM Quality Assurance Plan should be included in all solicitation for this type of effort. The purpose of it is to ensure the contractor has some kind of process in place for TM Quality. See the attached document for reference (see Attachments section). 2. CD-ROMs went essentially obsolete in 2015. Is there a different method of delivery that the U.S. Government is amenable to? The Government still requires CD-ROMs to have a physical media record of the TMs. Packaging - Attachment 15 Question(s) 1. Section F calls out preserving all exterior unpainted metal surfaces in accordance with MIL-STD-2073 and coating said surfaces with preservative MIL-PRF-16173, Grade 1. In MIL-PRF-53051D, Section 3.10, it states that CARC paint shall not be applied to surfaces greater than 400F which means our metallic exhaust guard would not be painted. Is this coating able to be applied to surfaces greater than 400F? Additionally, is there a reason that preservative MIL-PRF-16173, Grade 1 is not listed in MIL-PRF-53051D anywhere? 2. Is there a MIL, ISO, FDA or some other standard that the corrosion preventative coating for food handling machinery and equipment must meet? Additionally, why is this not a requirement for the Type II - Pump Assembly, Water in MIL-PRF-53051D? The SPI calls out a preservative that can be used on bare metal when the item is in storage to prevent corrosion. I m not sure where MIL-PRF-53051D is coming from, it maybe from the PD, which would be engineering and could be focusing on the inside of the pump. If the contractor wants to use a different preservative on non-metal, it will need to be from MIL-STD-2073, Appendix J and that preservative would need to meet the functionality of MIL-PRF-016173. 3. As far as the packaging preservative goes, these systems are painted with Chemical Agent Resistant Coating (CARC) which has anti-corrosive properties already in it as called out in MIL-PRF-53051D which is the MIL-PRF that these systems are manufactured too. Additionally, they are required based on the solicitation to be delivered in heat treated wooden crates. Is the packaging team stating that the preservative needs to be applied to the wooden crate or the exterior of the unit? The internals of the pump system are already cast aluminum and stainless steel which are inherently corrosion resistant. I m not seeing where MIL-PRF-53051D was listed in packaging. I reviewed the pkg contract language and CDRLs and didn t see where it was mentioned. Did the contractor see that in the Purchase Description? If so, that would be an engineering question to answer. As far as the wooden crate, it needs to follow heat treatment requirements per DOD 4140.65M and the requirements of the International Standards for Phytosanitary Measures 15 (ISPM), Regulation of Wood Packaging Material as laid out in Section D of the contract. *** Amendment 0004 is issued to extend the proposal due date out to 05 Dec 2025 *** *** Amendment 0003 is issued to extend the proposal due date out to 21 Nov 2025 *** *** Amendment 0002 is issued to extend the proposal due date out to 31 Oct 2025 *** *** Amendment 0001 is issued to extend the proposal due date out to 10 Oct 2025 *** Item: Pumping Assembly, Water NSN: 4320-01-691-1630 P/N: M53051-2-2 (CAGE 81349, Government) Qty: 14 each basic, 14 each option Packaging: Military A FOB: Origin Contract Type: Definitive contract with 100% option for 365 days Notes: This procurement is established as a 100% Total Small Business SetAside. First Article Testing (FAT) is required (provision for FAT waiver is allowed) and Government approval must be obtained prior to manufacturing the production quantity. Part number M53051-2-2 (Water Pump, 600 GPM) is built utilizing the standards listed in MIL-PRF-53051D (dated 20 Apr 2022). A copy of the MIL-PRF is attached in the Pre-Solicitation notice for this opportunity. The solicitation includes a Statement of Work (SOW) in Section C, with a list of provisioning data, technical manual publications data, packaging data, security and hazardous material data required by the Government. These details are listed on the solicitation as narratives, Contract Data Requirements List (CDRLs) and attachments. There are 21 CDRLs and 17 attachments that support the CDRLs. Thoroughly review the solicitation document for all requirements prior to submitting your proposal. ***** Contact the Contract Specialist to obtain all of the CDRL and attachment documentation via the DoD Safe Site. *****

From Solicitation posted on Dec 05, 2025

Notice history

7
  1. Presolicitation Posted Aug 18, 2025 View
  2. Solicitation Posted Aug 18, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
  3. Solicitation Posted Sep 17, 2025
    • Description: Description was updated
    • Response Deadline: Sep 18, 2025Oct 10, 2025
  4. Solicitation Posted Oct 30, 2025
    • Description: Description was updated
    • Response Deadline: Oct 10, 2025Nov 21, 2025
  5. Solicitation Posted Nov 13, 2025
    • Description: Description was updated
    • Response Deadline: Nov 21, 2025Dec 05, 2025
  6. Solicitation Posted Dec 03, 2025
    • Description: Description was updated
  7. Solicitation LATEST Posted Dec 05, 2025
    • Description: Description was updated

Details

Solicitation number SPRDL1-24-R-0166
Notice ID 1985aa171d484336ac13a75e6a0b85bb
Notice type Solicitation
Product / Service (PSC) 4320
NAICS 333914
Archive date Dec 20, 2025

Award Information

Not yet awarded

Contacts

primary
John P. Moses

Email

Phone

secondary
DLA Warren Contract Opportunities

Email

Agency

DEPT OF DEFENSE
DEFENSE LOGISTICS AGENCY
DLA LAND
DLA LAND WARREN MICHIGAN
DLA LAND WARREN

Dates

Posted Dec 05, 2025 8 months ago
Last Updated Aug 06, 2026 1 day ago
Due Dec 05, 2025 8 months ago