Pump Assemblies FA851725RRepairofMechanicalTransmissionAssembly
Summary
AI-generated · Aug 23, 2025Teardown, Test, and Evaluation (TT&E) and repair of multiple pump assemblies identified by NSNs and P/Ns (Sundstrand/Danfoss L-series: NSN 2520-00-010-3114, P/N 18-2011; NSN 4320-01-216-9809VX, P/N 60244-40687; NSN 4320-01-174-0506VX, P/N 58313-90004; NSN 4320-01-355-4464, P/N 2520-025; Eaton) must be performed. TT&E is to be completed first, followed by repair, with the objective of returning each item to a serviceable condition.
These pump assemblies support the safe operation of the MHU-83 Munition Handling/Loading Lift Truck and the MHU-196/204M Munitions Handling Lift Trailer. The contractor will perform all necessary actions to restore reparable items to serviceable condition and return them accordingly.
This requirement is for the Teardown/Test/Evaluation (TT&E) and repair of Mechanical Transmission Assembly NSN 2520-00-010-3114, P/N 18-2011, L18 Series Sundstrand /Danfoss, Pump Assembly NSN 4320-01-216-9809VX, P/N 60244-40687, L15 Series Sundstrand /Danfoss, Pump Assembly NSN 4320-01-174-0506VX, P/N 58313-90004, L20 Series Sundstrand /Danfoss and Pump Assembly NSN 4320-01-355-4464, P/N 2520-025, Eaton. These components assist in providing the necessary functions that enable the safe operation of the MHU-83 Series Munition Handling/Loading Lift Truck and MHU-196/204M Munitions Handling Lift Trailer. The contractor shall perform all actions necessary to return reparable items to a serviceable condition. The contractor shall perform Teardown, Test, and Evaluation (TT&E) first. Once TT&E is completed, the contractor shall then perform the repair and return each item in a serviceable condition.
From Combined Synopsis/Solicitation posted on Jun 26, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA