Project Labor Agreement (PLA) Market Survey for Integrated Training Command (ITC) at Malmstrom Air Force Base (MAFB), Montana W912DW26R1B9Z
Summary
AI-generated · Mar 09, 2026Feedback is being collected on the potential use of a Project Labor Agreement for a large-scale construction project to build an Integrated Training Center at Malmstrom AFB for Sentinel GBSD equipment and training devices, supporting wing-level maintenance, security forces, cyber defense, and operations training in a single facility. The 7,152 SM (76,979 SF) center will include high-bay and technical labs, shops, and classrooms built to ICD 705 specifications, with a deep reinforced concrete foundation, structural steel framing, insulated metal panel exterior walls, interior partitions, and a sloped standing-seam roof; building systems will cover electrical, mechanical, water, sewer, fire and lighting protection, security, and NIPR/SIPR communications, along with site work such as drainage, utilities, access paving, parking, and walkways.
This PLA market survey is not a solicitation and no proposals will be accepted at this time. Industry input is being sought to inform acquisition decisions for a project anticipated to exceed $35 million. Responses should address the attached questions and be submitted electronically by 1:00 pm Pacific Time on 25 March 2026. The inquiry includes the PLA definition as a pre-hire agreement with one or more labor organizations and notes that the government will consider whether to require a PLA for contractors and subcontractors on the project, though no commitment is made at this stage.
THIS IS A PROJECT LABOR AGREEMENT (PLA) SURVEY ONLY. THIS IS NOT A REQUEST FOR PROPOSAL, REQUEST FOR QUOTE, OR INVITATION FOR BID. THERE WILL NOT BE A SOLICITATION, SPECIFICATIONS OR DRAWINGS AVAILABLE AT THIS TIME. This is a SPECIAL NOTICE. No proposals are being requested or accepted with this notice. The U.S. Army Corps of Engineers (USACE) Seattle District is soliciting feedback from the construction community addressing the potential use of PLA for a large scale construction project (exceeding $35 million) at Malmstrom AFB, MT. DESCRIPTION OF WORK: Construct a 7,152SM (76.979SF) Integrated Training Center (ITC) designed to house Sentinel (GBSD) specific equipment and training devices used for wing-level maintenance, security forces, cyber defense, and operations training into a single, purpose-built facility. The facility includes both high-bay and single-story technical training labs, shops, and classrooms built to ICD 705 technical specifications. Construction will consist of a deep reinforced concrete foundation (pier and grade beam), structural slab, structural steel framing, insulated metal panel exterior walls, interior masonry or metal stud partitions, and a sloped standing seam metal roof. Building systems will include electrical, mechanical, water, sewer, fire and lighting protection systems, security systems, and NIPR and SIPR communications systems. Overall site improvements include clearing, grubbing, grading, minor demolition, drainage, utility, and communications connections, plus access paving, parking, and walkways as applicable. REVOLUTIONARY FEDERAL ACQUISITION REGULATION OVERHAUL (RFO) 22.502-1 DEFINITION: Project labor agreement means a pre-hire collective bargaining agreement with one or more labor organizations that establishes the terms and conditions of employment for a specific construction project and is an agreement described in 29 U.S.C. 158(f). RFO 22.503 POLICY: (a) Executive Order (E.O.) 14063, Use of Project Labor Agreements for Federal Construction Projects, requires agencies to use project labor agreements in large-scale construction projects to promote economy and efficiency in the administration and completion of Federal construction projects. (b) When awarding a contract in connection with a large-scale construction project, agencies must require use of project labor agreements for contractors and subcontractors engaged in construction on the project, unless an exception at 22.502-2(d) applies. INDUSTRY COMMENTS: The construction community is invited to comment on the use of PLA(s) using the attached list of questions. SUBMISSION DETAILS: Responses to this PLA Market Survey should be submitted no later than 1:00 pm (Pacific Time) on 25 March 2026. Submit responses electronically to Kyla Couch, Contract Specialist, at kyla.m.couch@usace.army.mil. Responses to this PLA market survey will be used by the Government to make appropriate acquisition decisions. All interested sources must respond to future solicitations announcements separately from responses to this market survey. Please note again, this is not a solicitation for proposals and does not constitute any commitment by the government.
From Special Notice posted on Mar 04, 2026Notice history
1-
Special Notice LATEST Posted Mar 04, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA