Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 5 notices 4 documents

PREMISE WIRING B145 FA462626Q0009

Solicitation FA462626Q0009 Copied Notice ID a691c56dba2c48a585cb4e7ecad0823f Copied DEPT OF DEFENSE — FA4626 341 CONS LGC
SAM.gov
Posted
Mar 20, 2026
Deadline
Apr 06, 2026
Set-aside
SBA
NAICS
238210
PSC
5975

Summary

AI-generated · Mar 21, 2026

Engineer, furnish, install, and test a premises wiring upgrade for Building 145 at Malmstrom AFB to install plenum-rated Cat-6 and OM4 multimode fiber cabling, with drop layouts shown in Attachment A. The scope includes upgrading communications racks/cabinets, installing new AC power with a power distribution unit, and grounding the racks, plus removing and disposing of all outdated Cat-3/5 copper and MM fiber cabling and any residual materials from the building. See the attached Statement of Objectives for full details.

Engineer, furnish, install, and test (EFI&T) a premises wiring upgrade to new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145 (B145) at Malmstrom AFB, MT. The Cat-6 and OM4 MM fiber drop layouts are shown in Attachment A, Layout Drawings. The upgrade shall include installation and replacement of communications (comms) racks/cabinets, installation of new AC power with power distribution unit (PDU), and comms rack/cabinet grounding. The Contractor shall remove all existing outdated and abandoned-in-place (AIP) Cat-3/5 and MM fiber cabling, along with any residual materials, from the building and dispose of them accordingly. See Attached SOO for full details.

From Solicitation posted on Mar 20, 2026

Engineer, furnish, install, and test (EFI&T) a premises wiring upgrade to new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145 (B145) at Malmstrom AFB, MT. The Cat-6 and OM4 MM fiber drop layouts are shown in Attachment A, Layout Drawings. The upgrade shall include installation and replacement of communications (comms) racks/cabinets, installation of new AC power with power distribution unit (PDU), and comms rack/cabinet grounding. The Contractor shall remove all existing outdated and abandoned-in-place (AIP) Cat-3/5 and MM fiber cabling, along with any residual materials, from the building and dispose of them accordingly. Amendment 0001: 1. A site visit has been scheduled for April 7th 2026 at 10:00 MST. The site visit will begin at the contracting office front lobby located 7015 Goddard Dr., Bldg. 145. Malmstrom AFB, MT 59402. 2. To Extend the Solicitation from April 6th 2026 to April 10th 2026 1:00 PM MST See Attached SOO for full details.

From Solicitation posted on Mar 30, 2026

Engineer, furnish, install, and test (EFI&T) a premises wiring upgrade to new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145 (B145) at Malmstrom AFB, MT. The Cat-6 and OM4 MM fiber drop layouts are shown in Attachment A, Layout Drawings. The upgrade shall include installation and replacement of communications (comms) racks/cabinets, installation of new AC power with power distribution unit (PDU), and comms rack/cabinet grounding. The Contractor shall remove all existing outdated and abandoned-in-place (AIP) Cat-3/5 and MM fiber cabling, along with any residual materials, from the building and dispose of them accordingly. Amendment 0001: 1. A site visit has been scheduled for April 7th 2026 at 10:00 MST. The site visit will begin at the contracting office front lobby located 7015 Goddard Dr., Bldg. 145. Malmstrom AFB, MT 59402. 2. To Extend the Solicitation from April 6th 2026 to April 10th 2026 1:00 PM MST RFIs answered How many existing drops can be taken out of service while new cabling is being installed? This will have to be a phased plan with sections being done at a time. We have a pretty good idea on how we want it done, but we are open to working with the contractor to find the best solution. Please clarify the description new/replacement . Is an existing drop already in this location and we are removing the existing cabling or is this a totally new location? If some are new and some are replacement, what is the count of each? 90% will removing and replacing what is already there. There is a few area that require new drops to be cut in from existing cabling that is running out in the open. Section 4.7.3 mentions SIPRNet. We find no SIPRNet locations called out in the drawings. Will there be any SIPRNet locations? Figure ATT-2 (the last page) shows 8 SIPR drops and that they all will be redirected to CEL-2. Section 4.7.16 Generally, is the amount of cable known to exist about equal to the number of new cables to be installed or is there a large amount of previously abandoned cable to be removed? It is not equal as I know there is a room full of 66 blocks and cooper that will need to be pulled. It should state somewhere that all unused copper will be removed from the building. Is there existing backbone to the new rack locations? Is the contractor responsible for terminating, placing in patch panels, patch cords, etc.? There is no new rack location. It will be racking replacements and there is already a backbone there. Yes, for terminating to the patch panel. We will patch into the switch. See Attached SOO for full details.

From Solicitation posted on Apr 02, 2026

Engineer, furnish, install, and test (EFI&T) a premises wiring upgrade to new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145 (B145) at Malmstrom AFB, MT. The Cat-6 and OM4 MM fiber drop layouts are shown in Attachment A, Layout Drawings. The upgrade shall include installation and replacement of communications (comms) racks/cabinets, installation of new AC power with power distribution unit (PDU), and comms rack/cabinet grounding. The Contractor shall remove all existing outdated and abandoned-in-place (AIP) Cat-3/5 and MM fiber cabling, along with any residual materials, from the building and dispose of them accordingly. Amendment 0001: 1. A site visit has been scheduled for April 7th 2026 at 10:00 MST. The site visit will begin at the contracting office front lobby located 7015 Goddard Dr., Bldg. 145. Malmstrom AFB, MT 59402. 2. To Extend the Solicitation from April 6th 2026 to April 10th 2026 1:00 PM MST RFIs answered How many existing drops can be taken out of service while new cabling is being installed? This will have to be a phased plan with sections being done at a time. We have a pretty good idea on how we want it done, but we are open to working with the contractor to find the best solution. Please clarify the description new/replacement . Is an existing drop already in this location and we are removing the existing cabling or is this a totally new location? If some are new and some are replacement, what is the count of each? 90% will removing and replacing what is already there. There is a few area that require new drops to be cut in from existing cabling that is running out in the open. Section 4.7.3 mentions SIPRNet. We find no SIPRNet locations called out in the drawings. Will there be any SIPRNet locations? Figure ATT-2 (the last page) shows 8 SIPR drops and that they all will be redirected to CEL-2. Section 4.7.16 Generally, is the amount of cable known to exist about equal to the number of new cables to be installed or is there a large amount of previously abandoned cable to be removed? It is not equal as I know there is a room full of 66 blocks and cooper that will need to be pulled. It should state somewhere that all unused copper will be removed from the building. Is there existing backbone to the new rack locations? Is the contractor responsible for terminating, placing in patch panels, patch cords, etc.? There is no new rack location. It will be racking replacements and there is already a backbone there. Yes, for terminating to the patch panel. We will patch into the switch. See Attached SOO for full details.

From Solicitation posted on Apr 08, 2026

Engineer, furnish, install, and test (EFI&T) a premises wiring upgrade to new plenum-rated Cat-6 and OM4 multimode (MM) fiber cabling for Building 145 (B145) at Malmstrom AFB, MT. The Cat-6 and OM4 MM fiber drop layouts are shown in Attachment A, Layout Drawings. The upgrade shall include installation and replacement of communications (comms) racks/cabinets, installation of new AC power with power distribution unit (PDU), and comms rack/cabinet grounding. The Contractor shall remove all existing outdated and abandoned-in-place (AIP) Cat-3/5 and MM fiber cabling, along with any residual materials, from the building and dispose of them accordingly. Amendment 0001: 1. A site visit has been scheduled for April 7th 2026 at 10:00 MST. The site visit will begin at the contracting office front lobby located 7015 Goddard Dr., Bldg. 145. Malmstrom AFB, MT 59402. 2. To Extend the Solicitation from April 6th 2026 to April 10th 2026 1:00 PM MST RFIs answered How many existing drops can be taken out of service while new cabling is being installed? This will have to be a phased plan with sections being done at a time. We have a pretty good idea on how we want it done, but we are open to working with the contractor to find the best solution. Please clarify the description new/replacement . Is an existing drop already in this location and we are removing the existing cabling or is this a totally new location? If some are new and some are replacement, what is the count of each? 90% will removing and replacing what is already there. There is a few area that require new drops to be cut in from existing cabling that is running out in the open. Section 4.7.3 mentions SIPRNet. We find no SIPRNet locations called out in the drawings. Will there be any SIPRNet locations? Figure ATT-2 (the last page) shows 8 SIPR drops and that they all will be redirected to CEL-2. Section 4.7.16 Generally, is the amount of cable known to exist about equal to the number of new cables to be installed or is there a large amount of previously abandoned cable to be removed? It is not equal as I know there is a room full of 66 blocks and cooper that will need to be pulled. It should state somewhere that all unused copper will be removed from the building. Is there existing backbone to the new rack locations? Is the contractor responsible for terminating, placing in patch panels, patch cords, etc.? There is no new rack location. It will be racking replacements and there is already a backbone there. Yes, for terminating to the patch panel. We will patch into the switch. See Attached SOO for full details.

From Solicitation posted on Apr 09, 2026

Notice history

5
  1. Solicitation Posted Mar 20, 2026
  2. Solicitation Posted Mar 30, 2026
    • Description: Description was updated
    • Response Deadline: Apr 06, 2026Apr 10, 2026
  3. Solicitation Posted Apr 02, 2026
    • Description: Description was updated
  4. Solicitation Posted Apr 08, 2026
    No changes from previous notice
  5. Solicitation LATEST Posted Apr 09, 2026
    • Response Deadline: Apr 10, 2026Apr 17, 2026

Details

Solicitation number FA462626Q0009
Notice ID a691c56dba2c48a585cb4e7ecad0823f
Notice type Solicitation
Product / Service (PSC) 5975
NAICS 238210
Place of performance Malmstrom AFB, Montana
Archive date Apr 21, 2026

Award Information

Not yet awarded

Contacts

primary
Jeffrey Krieger

Email

Phone

secondary
Charles McClintic

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR FORCE GLOBAL STRIKE COMMAND
FA4626 341 CONS LGC

Place of Performance

Malmstrom AFB, Montana 59402
USA

Dates

Posted Mar 20, 2026 4 months ago
Last Updated Aug 06, 2026 1 day ago
Due Apr 06, 2026 4 months ago