Contacts, documents and full notice history are available with a subscription.
Solicitation SBA Expired 8 notices

Pre-Solicitation Notice - W9128F26RA024 - $699M Small Business Design-Build/Design-Bid-Build Fuels MATOC W9128F26RA024

Solicitation W9128F26RA024 Copied Notice ID d5ca812e74d24779b68bcf02e6d537d2 Copied DEPT OF DEFENSE — W071 ENDIST OMAHA
SAM.gov
Posted
Sep 23, 2025
Deadline
Oct 09, 2025
Set-aside
SBA
NAICS
237120
PSC
Y1GC

Summary

AI-generated · Sep 28, 2025

Provide design-build and design-bid-build construction, maintenance, repair, and demolition of POL facilities and infrastructure for a small-business MATOC, with design included. Work supports fuel receipt, pipeline, storage, transfer, containment, laboratory testing, POL operations, quality control, equipment, and dispensing systems; includes tank rehabilitation to repair, replace, and upgrade coatings, worn components, corrosion, and deficiencies to keep tanks functional, plus tank cleaning prior to inspection to remove residual fuels and sludge. MATOC will be awarded using FAR Part 15 procedures, with evaluation factors covering past performance, overall program management/technical approach, technical approach for the sample project, resumes of key personnel, and price for the sample project.

Important updates: this is an informational presolicitation notice with no attachments in PIEE, and the “Download All Attachments” function will not operate. Amendments 0001–0003 added information to the description. The contract structure provides a base period of 4 years, plus Option 1 for 3 years and Option 2 for 6 months, for a possible total of 7.5 years.

The work generally includes the following: 1.) Construction, maintenance, repair and demolition of POL facilities and infrastructure, to include design. Facilities and infrastructure include, but are not limited to, facilities in direct support of the fuel receipt, pipeline, storage, transfer, containment, laboratory testing, POL operations, quality control, equipment, and dispensing systems, 2.) Tank rehabilitation. Work consists of construction, repairing, replacing, and upgrading coatings, worn components, corrosion, and deficiency to the tank systems necessary to make the tank fully functional for support of mission requirements. Components typically include valves, pumps, piping, controls, dikes/berms, structural components (shell/tank bottom), life safety, and fire safety systems, and 3.) Tank cleaning prior to inspection and upgrades. Work includes cleaning to remove residual fuel products, water/sludge removal, and preparation of tank for inspection. The estimated award date is May 2026. The estimated duration of this Multiple Award Task Order Contract (MATOC) is 4 years for the base period, 3 years for Option 1, and 6 months for Option 2 for a possible total of 7.5 years. MATOCs will be awarded using FAR part 15 procedures. Evaluation factors will include: Past Performance, Overall Program Management/Technical Approach, Technical Approach for the Sample Project, Resumes of Key Personnel, and Price for the Sample Project (factors may be changed prior to solicitation). See SAM Notice for W9128F25RA065 for additional details.

From Presolicitation posted on Sep 23, 2025

The work generally includes the following: 1.) Construction, maintenance, repair and demolition of POL facilities and infrastructure, to include design. Facilities and infrastructure include, but are not limited to, facilities in direct support of the fuel receipt, pipeline, storage, transfer, containment, laboratory testing, POL operations, quality control, equipment, and dispensing systems, 2.) Tank rehabilitation. Work consists of construction, repairing, replacing, and upgrading coatings, worn components, corrosion, and deficiency to the tank systems necessary to make the tank fully functional for support of mission requirements. Components typically include valves, pumps, piping, controls, dikes/berms, structural components (shell/tank bottom), life safety, and fire safety systems, and 3.) Tank cleaning prior to inspection and upgrades. Work includes cleaning to remove residual fuel products, water/sludge removal, and preparation of tank for inspection. The estimated award date is May 2026. The estimated duration of this Multiple Award Task Order Contract (MATOC) is 4 years for the base period, 3 years for Option 1, and 6 months for Option 2 for a possible total of 7.5 years. MATOCs will be awarded using FAR part 15 procedures. Evaluation factors will include: Past Performance, Overall Program Management/Technical Approach, Technical Approach for the Sample Project, Resumes of Key Personnel, and Price for the Sample Project (factors may be changed prior to solicitation). See SAM Notice for W9128F25RA065 for additional details. Important Note: This is an informational notice only. The button called Download All Attachments in PIEE Solicitation will not function as no attachments have been included in this notice. Amendments/Updates 0001-0003 added additional information to this description.

From Presolicitation posted on Sep 24, 2025

In accordance with FAR 7.107-5(c)(1), the U.S. Army Corps of Engineers, Omaha District intends to consolidate contracts for Design-Build/Design-Bid-Build Construction Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contracts (MATOC) for projects located in the Omaha District s Area of Responsibility (AOR) for the Petroleum Oil and Lubricants program. The consolidated effort will be solicited as Multiple Award Task Order Construction Contracts (MATOC) for Design-Build (DB) and Design-Bid-Build (DBB) Construction projects in support of DoD and other Federal agencies. This consolidation meets the requirements of FAR 7.107-2, the benefits of the consolidated acquisition would substantially exceed the benefits that would be derived from an alternative approach. Therefore, the Government found that consolidation is necessary and justified, and this notice shall be available for at least seven days prior to the release of the solicitation of this requirement. The solicitation for W9128F26RA024 is anticipated for release on or around 15 Oct 2025. This is also the consolidation notice for a possible, related MATOC under W9128F26RA011 (if this solicitation is ever released).

From Special Notice posted on Sep 29, 2025

In accordance with FAR 7.107-5(c)(1), the U.S. Army Corps of Engineers, Omaha District intends to consolidate contracts for Design-Build/Design-Bid-Build Construction Indefinite Delivery Indefinite Quantity (IDIQ), Multiple Award Task Order Contracts (MATOC) for projects located in the Omaha District s Area of Responsibility (AOR) for the Petroleum Oil and Lubricants program. The consolidated effort will be solicited as Multiple Award Task Order Construction Contracts (MATOC) for Design-Build (DB) and Design-Bid-Build (DBB) Construction projects in support of DoD and other Federal agencies. This consolidation meets the requirements of FAR 7.107-2, the benefits of the consolidated acquisition would substantially exceed the benefits that would be derived from an alternative approach. Therefore, the Government found that consolidation is necessary and justified, and this notice shall be available for at least seven days prior to the release of the solicitation of this requirement. The solicitation for W9128F26RA024 is anticipated for release on or around 15 Oct 2025. This is also the consolidation notice for a possible, related MATOC under W9128F26RA011 (if this solicitation is ever released). W9128F26RA024 will remain a small business set-aside.

From Special Notice posted on Sep 30, 2025

This Solicitation is for the $699M Small Business Design-Build/Design-Bid-Build Fuels Multiple Award Task Order Contract (MATOC) for CONUS, Hawaii, Alaska, and Outlying Areas. Please review the attached document for compete details and submission requirements.

From Solicitation posted on Oct 17, 2025

This Solicitation is for the $699M Small Business Design-Build/Design-Bid-Build Fuels Multiple Award Task Order Contract (MATOC) for CONUS, Hawaii, Alaska, and Outlying Areas. Please review the attached document for compete details and submission requirements. Change/Amendment 0001 - This change/amendment only includes changes to Attachment 2 - 00 21 00_Phase1_RFP_W9128F26RA024 which is uploaded to PIEE Solicitation.

From Solicitation posted on Oct 21, 2025

This Solicitation is for the $699M Small Business Design-Build/Design-Bid-Build Fuels Multiple Award Task Order Contract (MATOC) for CONUS, Hawaii, Alaska, and Outlying Areas. Please review the attached document for compete details and submission requirements. Update/Amendment 0001 - This update/amendment only includes changes to Attachment 2 - 00 21 00_Phase1_RFP_W9128F26RA024 which is uploaded to PIEE Solicitation. Update/Amendment 0002 - This update/amendment includes changes to Attachment 2 - 00 21 00_Phase1_RFP_W9128F26RA024 and to Attachment 6 - Fuels_MATOC_W9128F26RA024-Specs; the changes to Attachment 6 are only for two sections.

From Solicitation posted on Oct 24, 2025

This Solicitation is for the $699M Small Business Design-Build/Design-Bid-Build Fuels Multiple Award Task Order Contract (MATOC) for CONUS, Hawaii, Alaska, and Outlying Areas. Please review the attached document for compete details and submission requirements. Update/Amendment 0001 - This update/amendment only includes changes to Attachment 2 - 00 21 00_Phase1_RFP_W9128F26RA024 which is uploaded to PIEE Solicitation. Update/Amendment 0002 - This update/amendment includes changes to Attachment 2 - 00 21 00_Phase1_RFP_W9128F26RA024 and to Attachment 6 - Fuels_MATOC_W9128F26RA024-Specs; the changes to Attachment 6 are only for two sections. Update/Amendment 0003 - This update/amendment includes changes to Attachment 2 - 00 21 00_Phase1_RFP_W9128F26RA024 (AM#0003), Attachment 4 - 00 22 00_Phase1_RFP_W9128F26RA024 (AM#0003), and Attachment 6 - Fuels_MATOC_W9128F26RA024-Specs; the changes to Attachment 6 are only for one section.

From Solicitation posted on Nov 07, 2025

Notice history

8
  1. Presolicitation Posted Sep 23, 2025
  2. Presolicitation Posted Sep 24, 2025
    • Description: Description was updated
  3. Special Notice Posted Sep 29, 2025
    • Title: Pre-Solicitation Notice - W9128F26RA024 - $699M Small Business Design-Build/Design-Bid-Build Fuels MATOCConsolidation Notice - W9128F26RA024 - $699M Small Business Design-Build/Design-Bid-Build Fuels MATOC
    • Description: Description was updated
    • Notice Type: PresolicitationSpecial Notice
    • Response Deadline: Oct 09, 2025Oct 06, 2025
    • Set-Aside: Total Small Business Set-Aside (FAR 19.5)None
  4. Special Notice Posted Sep 30, 2025
    • Description: Description was updated
    • Set-Aside: NoneTotal Small Business Set-Aside (FAR 19.5)
  5. Solicitation Posted Oct 17, 2025
    • Title: Consolidation Notice - W9128F26RA024 - $699M Small Business Design-Build/Design-Bid-Build Fuels MATOCSolicitation - W9128F26RA024 - $699M Small Business Design-Build/Design-Bid-Build Fuels MATOC
    • Description: Description was updated
    • Notice Type: Special NoticeSolicitation
    • Response Deadline: Oct 06, 2025Nov 17, 2025
  6. Solicitation Posted Oct 21, 2025
    • Description: Description was updated
  7. Solicitation Posted Oct 24, 2025
    • Description: Description was updated
  8. Solicitation LATEST Posted Nov 07, 2025
    • Description: Description was updated

Details

Solicitation number W9128F26RA024
Notice ID d5ca812e74d24779b68bcf02e6d537d2
Notice type Presolicitation
Product / Service (PSC) Y1GC
NAICS 237120
Archive date Oct 31, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Brandon Hobbs

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTHWESTERN
W071 ENDIST OMAHA

Place of Performance

Continental United States (CONUS), Alaska, Hawaii, and Outlying Areas

Dates

Posted Sep 23, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Due Oct 09, 2025 9 months ago