PRE-DEMOLITION SURVEY VARIOUS BUILDINGS NASA WALLOPS FLIGHT FACILITY SURVEY WALLOPS, VA W912DY26RA086
Summary
AI-generated · May 23, 2026Plan and complete environmental sampling of facilities at the installation to identify asbestos-containing materials (ACM) and other regulated materials (ORM) and to perform a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP), and PCBs in paint for parts of the structures that are potentially painted. The sampling should cover all accessible areas (exterior, roof, basement/crawl spaces, etc.), and the contractor must report any areas that could not be accessed, including the size of the non-sampled area and its current or recent use. The structures to be sampled are listed in Table I.
Following sampling, provide a comprehensive assessment that quantifies environmental contamination and outlines the safe removal and disposal methods. All work must comply with applicable federal, state, and local regulations. Laboratory testing and analysis must be completed within the timeframes shown in Table II after field sampling, and a separate Pre-Demolition Assessment Report for the installation must be submitted within the specified period after sample results are received. The report should address any areas not accessed during the survey and specify the area size and the use of those areas, along with recommendations for any follow-on actions in accordance with regulations.
The objective of this Performance Work Statement is to plan and complete the environmental sampling of facilities at the installation. The structures of concern are listed in Table I. The sampling will determine ACM and ORM materials and complete a Waste Stream Analysis for RCRA 8 metals, lead-based paint (LBP) and PCB s-in-paint for those parts of the structure currently identified as potentially having any painted components. Following sampling, the Contractor shall be able to completely quantify the environmental contamination present and the methods required to remove and dispose of said contamination in a safe manner. All sampling shall be planned and performed in accordance with Federal, State, and local regulations for the installation. All recommendations for follow-on actions shall also be in accordance with Federal, State, and local regulations. Laboratory testing and analysis shall be completed within the workdays identified in table two following the respective site sampling field activity completion. The results of the site investigation and sampling effort will be provided in an individual Pre-Demolition Assessment Report for the installation that will be submitted within the workdays identified in table two following the receipt of sample results. The intent of this contract effort is to provide comprehensive sampling for all ACM/ORM materials to include the facility exterior, roof, basement/crawl spaces, etc. The Contractor shall make every reasonable effort to access these areas when present in each facility. The Report will specifically address any areas within given structures that were not accessible during the survey and state the size of the area not accessed, and current or immediate previous use of the area not sampled.
From Solicitation posted on May 22, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA