Pre Bid Meeting -WY FLAP SHE 26(1), Red Grade Road, Phase 1 6982AF26SN000001
Summary
AI-generated · Oct 31, 2025A virtual Pre-Bid meeting will cover WY FLAP SHE 26(1) Red Grade Road, Phase 1; to request attendance, email CFL Acquisitions and include the project in the subject line, and a link will be provided to attendees. The project site is accessible for viewing before and during the solicitation (weather permitting), and bidders are urged to inspect the site to verify conditions that may affect cost; failure to inspect cannot be used as a basis for a claim after award.
Scope involves rehabilitating, widening, and minor realignment of Red Grade Road (about 2.6 miles) to improve access to the Bighorn National Forest and BLM lands, addressing substandard width, geometrics, and safety, with drainage improvements to meet design standards. The work includes two schedules and one option: Schedule A (~1.8 miles) and Schedule B (~2.6 miles, which includes Schedule A and an additional ~0.8 miles); Option X for Aspen Parking Lot rehabilitation at ~MP 2.7. The proposed roadway will vary in width from 18 to 22 feet, on a corridor that currently averages 18 feet, and the project occurs in mountainous terrain with 3R+ improvements.
WY FLAP SHE 26(1) Red Grade Road, Phase 1 Special Notice: The Federal Highway Administration (FHWA) Central Federal Lands Highway Division (CFLHD) will be conducting a virtual Pre-Bid meeting for WY FLAP SHE 26(1) Red Grade Road, Phase 1 on November 13, 2025, at 1:00 p.m. Mountain Time. Please send an email to CFL Acquisitions, cflacquisitions@dot.gov if you would like to attend. Please ensure that WY FLAP SHE 26(1) Red Grade Road, Phase 1 Attn: Kelly Palmer or Laura Slauter is in the subject line. A link to the virtual meeting will be sent on November 12, 2025, end of day. The project site is currently accessible and available for viewing prior to the meeting and throughout the Solicitation timeframe, weather permitting. Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. PROJECT DESCRIPTION: The purpose of this project is to improve access to the Bighorn National Forest and Bureau of Land Management (BLM) lands through roadway rehabilitation, widening, and minor roadway realignment of Red Grade Road (County Road 26/USFS Route FSR 26). Red Grade Road provides a travel corridor from Wyoming State Highway 335 to US Highway 14. The project will address the substandard roadway typical section, geometrics, and safety issues. SCOPE OF THE WORK: This total project length is approximately 2.6 miles. The plans include two (2) schedules and one (1) option: Schedule A is approximately 1.8-miles (~MP 1.0 to ~MP 2.8) and includes the majority of large cuts and retaining walls. Schedule B is approximately 2.6-miles (~MP 1.0 to ~MP 3.6), which includes the limits of schedule A and the remaining 0.8-miles. Option X includes the rehabilitation of the Aspen s Parking Lot at ~MP 2.7. The proposed roadway will vary from 22-foot wide to 18-foot total. The existing roadway width is 18 feet wide. The project will include minor horizontal and vertical realignments to improve sight distance and roadway geometry, as well as drainage improvements to obtain a design standard for the proposed roadway. The project is considered 3R+ and located in mountainous terrain.
From Special Notice posted on Oct 30, 2025WY FLAP SHE 26(1) Red Grade Road, Phase 1 This Pre-Bid Meeting has been changed to a in-person meeting. Special Notice: The Federal Highway Administration (FHWA) Central Federal Lands Highway Division (CFLHD) will be conducting a IN PERSON Pre-Bid meeting for WY FLAP SHE 26(1) Red Grade Road, Phase 1 on November 13, 2025, at 9:00 a.m. Mountain Time. Meeting at the Base Trailhead Parking Lot (right at the beginning of the project ~MP 1) County Highway 26. Please send an email to CFL Acquisitions, cflacquisitions@dot.gov if you would like to attend. Please ensure that WY FLAP SHE 26(1) Red Grade Road, Phase 1 Attn: Kelly Palmer or Laura Slauter is in the subject line. The project site is currently accessible and available for viewing prior to the meeting and throughout the Solicitation timeframe, weather permitting. THIS IS A NON-MANDATORY MEETING. Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. PROJECT DESCRIPTION: The purpose of this project is to improve access to the Bighorn National Forest and Bureau of Land Management (BLM) lands through roadway rehabilitation, widening, and minor roadway realignment of Red Grade Road (County Road 26/USFS Route FSR 26). Red Grade Road provides a travel corridor from Wyoming State Highway 335 to US Highway 14. The project will address the substandard roadway typical section, geometrics, and safety issues. SCOPE OF THE WORK: This total project length is approximately 2.6 miles. The plans include two (2) schedules and one (1) option: Schedule A is approximately 1.8-miles (~MP 1.0 to ~MP 2.8) and includes the majority of large cuts and retaining walls. Schedule B is approximately 2.6-miles (~MP 1.0 to ~MP 3.6), which includes the limits of schedule A and the remaining 0.8-miles. Option X includes the rehabilitation of the Aspen s Parking Lot at ~MP 2.7. The proposed roadway will vary from 22-foot wide to 18-foot total. The existing roadway width is 18 feet wide. The project will include minor horizontal and vertical realignments to improve sight distance and roadway geometry, as well as drainage improvements to obtain a design standard for the proposed roadway. The project is considered 3R+ and located in mountainous terrain.
From Special Notice posted on Nov 04, 2025WY FLAP SHE 26(1) Red Grade Road, Phase 1 This Pre-Bid Meeting has been changed to a in-person meeting. Special Notice: The Federal Highway Administration (FHWA) Central Federal Lands Highway Division (CFLHD) will be conducting a IN PERSON Pre-Bid meeting for WY FLAP SHE 26(1) Red Grade Road, Phase 1 on November 13, 2025, at 9:00 a.m. Mountain Time. Meeting at the Base Trailhead Parking Lot (right at the beginning of the project ~MP 1) County Highway 26. Please send an email to CFL Acquisitions, cflacquisitions@dot.gov if you would like to attend. Please ensure that WY FLAP SHE 26(1) Red Grade Road, Phase 1 Attn: Kelly Palmer or Laura Slauter is in the subject line. The project site is currently accessible and available for viewing prior to the meeting and throughout the Solicitation timeframe, weather permitting. THIS IS A NON-MANDATORY MEETING. Offerors or quoters are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of contract performance, to the extent that the information is reasonably obtainable. In no event shall failure to inspect the site constitute grounds for a claim after contract award. PROJECT DESCRIPTION: The purpose of this project is to improve access to the Bighorn National Forest and Bureau of Land Management (BLM) lands through roadway rehabilitation, widening, and minor roadway realignment of Red Grade Road (County Road 26/USFS Route FSR 26). Red Grade Road provides a travel corridor from Wyoming State Highway 335 to US Highway 14. The project will address the substandard roadway typical section, geometrics, and safety issues. SCOPE OF THE WORK: This total project length is approximately 2.6 miles. The plans include two (2) schedules and one (1) option: Schedule A is approximately 1.8-miles (~MP 1.0 to ~MP 2.8) and includes the majority of large cuts and retaining walls. Schedule B is approximately 2.6-miles (~MP 1.0 to ~MP 3.6), which includes the limits of schedule A and the remaining 0.8-miles. Option X includes the rehabilitation of the Aspen s Parking Lot at ~MP 2.7. The proposed roadway will vary from 22-foot wide to 18-foot total. The existing roadway width is 18 feet wide. The project will include minor horizontal and vertical realignments to improve sight distance and roadway geometry, as well as drainage improvements to obtain a design standard for the proposed roadway. The project is considered 3R+ and located in mountainous terrain.
From Special Notice posted on Nov 06, 2025Notice history
3-
Special Notice Posted Oct 30, 2025
-
Special Notice LATEST Posted Nov 06, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA