Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation Expired 4 notices 1 document

Power Factor Correction System 356250(RE)

Solicitation 356250(RE) Copied Notice ID 5b73e112bc8141e3894e3887d28d865c Copied ENERGY, DEPARTMENT OF — SLAC Natl Accel Lab -DOE Contractor
SAM.gov
Posted
Jun 11, 2025
Deadline
Jul 16, 2025
Set-aside
None
NAICS
423610
PSC
6150

Summary

AI-generated · Aug 25, 2025

Proposals are sought for a Power Factor Correction System for SLAC National Accelerator Laboratory. Submit per the attached RFP package (RFP_356250_Power Factor Correction System.zip) and include quoted price, delivery, a technical compliance statement, and required certifications, along with all forms/documents listed in the cover letter. A U.S. domestic end item source is required. Clarification requests are due by the stated deadline, and proposals must be received by the due date with a 90-day acceptance window. Payment terms are Net 30 days; freight terms are FOB Destination, Prepaid and Add.

Amendment history notes: Amendment 1 adds an attachment containing Offeror’s Clarifications; the due date remains unchanged and an alternative point of contact is identified. Amendment 2 adds the Statement of Work Reactive Power Compensation (RPC) – Power Factor Correction System, Revision 2, which adds NRTL listing requirements in Section 2.0; no change to the due date. Amendment 3 consolidates additional clarifications from Offerors, reiterates the RPC SOW and NRTL requirement, and confirms no change to the due date.

SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions. SLAC National Accelerator Laboratory invites interested vendors to submit a proposal in accordance with the attached RFP preparation requirements for the Power Factor Correction System. Any clarification requests are due by Friday, June 27, 2025. Your proposal must be received no later than Wednesday, July 16, 2025, 5:00 PM PDT, and be valid for 90 days after submission. SLAC has a requirement for a U.S. domestic end item source of the following: Attached RFP_356250_Power Factor Correction System NOTE: The following documents are attached in this solicitation. RFP_356250_Power Factor Correction System.zip Must complete and return all documentation mentioned in the cover letter Please provide quoted price, delivery, technical compliance statement and certification to the attention of Ryan Enos. Payment Terms: Net 30 days Freight terms: FOB Destination Prepaid and Add

From Combined Synopsis/Solicitation posted on Jun 11, 2025

RFP AMENDMENT #1 IS BEING ISSUED AND POSTED TO: (1) Incorporate the attached, "Attachment 02 - Offeror's Request for Clarifications" dated July 1, 2025," as a result of clarifications from Prospective Vendors. (2) RFP due date is not extended and will remain as July 16, 2025, 5:00 PM Pacific Standard Time (PST). (3) Note alternative POC for this procurement: Lorenza Ladao lladao@slac.stanford.edu ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions. SLAC National Accelerator Laboratory invites interested vendors to submit a proposal in accordance with the attached RFP preparation requirements for the Power Factor Correction System. Any clarification requests are due by Friday, June 27, 2025. Your proposal must be received no later than Wednesday, July 16, 2025, 5:00 PM PDT, and be valid for 90 days after submission. SLAC has a requirement for a U.S. domestic end item source of the following: Attached RFP_356250_Power Factor Correction System NOTE: The following documents are attached in this solicitation. RFP_356250_Power Factor Correction System.zip Must complete and return all documentation mentioned in the cover letter Please provide quoted price, delivery, technical compliance statement and certification to the attention of Ryan Enos. Payment Terms: Net 30 days Freight terms: FOB Destination Prepaid and Add

From Combined Synopsis/Solicitation posted on Jul 02, 2025

RFP Amendment No. 02 is being issued to: (1) Incorporate the attached, "Statement of Work Reactive Power Compensation (RPC) - Power Factor Correction System" Revision 2 date released July 8, 2025 which added NRTL listing requirements in Section 2.0. (2) RFP due date is not extended and will remain as July 16, 2025, 5:00 PM Pacific Standard Time (PST). RFP AMENDMENT #1 IS BEING ISSUED AND POSTED TO: (1) Incorporate the attached, "Attachment 02 - Offeror's Request for Clarifications" dated July 1, 2025," as a result of clarifications from Prospective Vendors. (2) RFP due date is not extended and will remain as July 16, 2025, 5:00 PM Pacific Standard Time (PST). (3) Note alternative POC for this procurement: Lorenza Ladao lladao@slac.stanford.edu ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions. SLAC National Accelerator Laboratory invites interested vendors to submit a proposal in accordance with the attached RFP preparation requirements for the Power Factor Correction System. Any clarification requests are due by Friday, June 27, 2025. Your proposal must be received no later than Wednesday, July 16, 2025, 5:00 PM PDT, and be valid for 90 days after submission. SLAC has a requirement for a U.S. domestic end item source of the following: Attached RFP_356250_Power Factor Correction System NOTE: The following documents are attached in this solicitation. RFP_356250_Power Factor Correction System.zip Must complete and return all documentation mentioned in the cover letter Please provide quoted price, delivery, technical compliance statement and certification to the attention of Ryan Enos. Payment Terms: Net 30 days Freight terms: FOB Destination Prepaid and Add

From Combined Synopsis/Solicitation posted on Jul 08, 2025

Amendment No. 03 is being issued to: (1) Incorporate the attached, "Attachment 02 - Offeror's Request for Clarifications" dated July 9, 2025," as a result of clarifications from Prospective Vendors. (2) RFP due date is not extended and will remain as July 16, 2025, 5:00 PM Pacific Standard Time (PST). ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. RFP Amendment No. 02 is being issued to: (1) Incorporate the attached, "Statement of Work Reactive Power Compensation (RPC) - Power Factor Correction System" Revision 2 date released July 8, 2025 which added NRTL listing requirements in Section 2.0. (2) RFP due date is not extended and will remain as July 16, 2025, 5:00 PM Pacific Standard Time (PST). RFP AMENDMENT #1 IS BEING ISSUED AND POSTED TO: (1) Incorporate the attached, "Attachment 02 - Offeror's Request for Clarifications" dated July 1, 2025," as a result of clarifications from Prospective Vendors. (2) RFP due date is not extended and will remain as July 16, 2025, 5:00 PM Pacific Standard Time (PST). (3) Note alternative POC for this procurement: Lorenza Ladao lladao@slac.stanford.edu ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED. SLAC National Accelerator Laboratory is operated by Stanford University for the Department of Energy. As a management and operating contractor, subcontracts awarded by the Laboratory are not Federal procurements, and are not directly subject to the Federal Acquisition Regulations in 48 CFR. Nonetheless, certain Federal laws, Executive Orders, and regulations may affect our DOE approved purchasing system, as required by statute, regulation, or contract terms and conditions. SLAC National Accelerator Laboratory invites interested vendors to submit a proposal in accordance with the attached RFP preparation requirements for the Power Factor Correction System. Any clarification requests are due by Friday, June 27, 2025. Your proposal must be received no later than Wednesday, July 16, 2025, 5:00 PM PDT, and be valid for 90 days after submission. SLAC has a requirement for a U.S. domestic end item source of the following: Attached RFP_356250_Power Factor Correction System NOTE: The following documents are attached in this solicitation. RFP_356250_Power Factor Correction System.zip Must complete and return all documentation mentioned in the cover letter Please provide quoted price, delivery, technical compliance statement and certification to the attention of Ryan Enos. Payment Terms: Net 30 days Freight terms: FOB Destination Prepaid and Add

From Combined Synopsis/Solicitation posted on Jul 09, 2025

Notice history

4
  1. Combined Synopsis/Solicitation Posted Jun 11, 2025
  2. Combined Synopsis/Solicitation Posted Jul 02, 2025
    • Description: Description was updated
  3. Combined Synopsis/Solicitation Posted Jul 08, 2025
    • Description: Description was updated
  4. Combined Synopsis/Solicitation LATEST Posted Jul 09, 2025
    • Description: Description was updated

Details

Solicitation number 356250(RE)
Notice ID 5b73e112bc8141e3894e3887d28d865c
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) 6150
NAICS 423610
Place of performance Menlo Park, California
Archive date Jul 17, 2025

Award Information

Not yet awarded

Documents

1
View on SAM.gov

Contacts

primary
Ryan Enos

Email

Agency

ENERGY, DEPARTMENT OF
ENERGY, DEPARTMENT OF
SLAC Natl Accel Lab -DOE Contractor

Place of Performance

Menlo Park, California 94025
USA

Dates

Posted Jun 11, 2025 1 year ago
Last Updated Aug 06, 2026 2 days ago
Due Jul 16, 2025 1 year ago