AI-generated · Apr 21, 2026Provide and service 18 portable toilets and 14 dual hand-washing stations at Camp Nett at Niantic and Stones Ranch Military Reservation in East Lyme, CT, including delivery, placement, daily cleaning and restocking, and removal. A CTARNG representative will identify exact locations at installation; units must be delivered on the start date and serviced daily at 1000 hours during the period, with removal after completion. The contractor must handle all management, labor, transportation, pickup and delivery of equipment and waste, and must collect and properly dispose of all wastewater, using the SRMR water point as needed.
Facilities must meet professional, environmentally responsible standards and be sanitary, including safe disposal of feminine hygiene products; the contractor must allow inspection of conditions and ensure sanitary conditions at all times. The contractor must provide its own vehicles and establish access routes to the base, comply with installation security and conduct requirements, safeguard government property, and not rely on CTARNG for equipment, fuel, or utilities. If the CTARNG is not satisfied with cleanliness or service, the contractor must repeat the same service at no charge.
1. Objective. The objective of this statement of work is to obtain portable toilets, handwashing stations and services to facilitate at Camp Nett at Niantic, Niantic, CT 06357 and Stones Ranch Military Reservation (SRMR), East Lyme CT 06333. 2. Specific tasks. The specific tasks are as follows: a. The contractor is required to emplace, clean and service 18 portable toilets for delivery and removal (to include cleaning and re-stocking), and 14 dual hand-washing stations for delivery and removal (to include service & re-stocking) daily as agreed to between the CTARNG and the Contractor. i. All portable toilets and handwashing stations must be delivered and positioned on 13 July 2026. ii. On date/time of installation, customer to provide representative in person to identify specific locations for portable toilets and hand-washing stations. iii. Portable toilets will be serviced daily from 14 July 2026 through 18 July 2026. iv. Services to be conducted at 1000hrs daily. v. Initial Schedule: Deliver all units referenced above on 7/13/26. Clean and restock all units on 7/14, 7/15, 7/16, 7/17, 7/18, (5 daily services). Remove all units on 7/19 after 1200hrs. b. The contractor must collect and properly dispose of all wastewaters. The contractor must furnish all management, labor, transportation, pickup and delivery of equipment/facilities and waste. c. SRMR water point will be available to vendor. d. Cleaning/Servicing of provided facilities (e.g. toilets and hand-washing stations) must conform to the generally accepted industry and local standards of quality, cleanliness, finish, appearance and packaging. The facilitated must not only be clean in the sense of being emptied but also free from bacteria, fungi and micro-organisms, including pathogens and disease producing organisms. e. Facilities must be able to properly dispose of feminine hygiene products. 3. Qualification requirements. a. Equipment provided and services conducted must be professional and environmentally responsible. b. Equipment must be able to receive female sanitary waste in a safe and respectful manner. c. All work must be performed under sanitary conditions. d. The contract facility must be open for inspection of conditions at any time by a representative of the CTARNG, and the CTARNG reserves the right to perform or cause to have performed any test necessary to determine the sanitary condition of the articles delivered by the contractor. e. The contractor must provide his own vehicle(s) and they must be always maintained in safe operating condition. The contractor must establish routes as to gain access to the base through POC TBD. f. Contractor personnel must adhere to standards of conduct as established by the installation commander. g. At no time will contractor personnel purchase any items from the local economy for any CTARNG personnel. h. Contractor must adhere to all current installation security policies. i. The contractor must be responsible for safeguarding all government property (e.g. Uniforms) provided for contracted purposes. At the close of each work period, government facilities, property and materials must be secured. j. The CTARNG must not provide any equipment, fuel, personnel, utilities or facilities to the contractor for the execution of this contract. k. SATISFACTION GUARANTEE: If CTARNG is not satisfied with the cleanliness of the facilities or the service provided, the contractor must provide the same service(s) again at no charge.
From Combined Synopsis/Solicitation posted on Apr 20, 2026Notice history
1-
Combined Synopsis/Solicitation LATEST Posted Apr 20, 2026
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA