Port Operations Bldg. 284 Interior and Exterior Repairs N6945025F1189
Summary
AI-generated · Sep 11, 2025Interior work covers replacing three HVAC systems (4-ton and 2-ton units) with energy-efficient units (minimum 16 SEER; 15 SEER2), replacing all ductwork in 1st- and 2nd-floor office spaces, engineering and verifying HVAC sizing with pressure testing per UFC codes, removing and reinstalling ceiling tiles, installing LED lighting in the 1st-floor training room and 2nd-floor offices, removing old VCT and installing new tile, replacing office carpet, painting walls in the 2nd-floor offices and hallway, moving office furniture out and back in, painting bay-area walls and repainting bay floor lines, and patching damaged walls in two bay locations.
Exterior work involves removing and replacing a three-bay standing-seam metal roof system on a pre-manufactured metal structure, including galv(an)ized valley/gutters between bays, all gutters, fascia and downspouts, roof fans and exhaust fans, with compliance to UFC wind-velocity requirements. The contract was awarded to JBW SAC JV LLC for about $2.67 million.
CLIN 001 Interior: Replace existing HVAC (3) systems, currently a 4-ton unit and 2-ton unit. 16 SEER (15 SEER2) minimum efficiency rating. Replace all HVAC ducting in office spaces on 1st and 2nd floor. Engineer and verify HVAC sizing and all pressure testing once complete IAW UFC codes. Remove and install new ceiling tiles, LED lighting in 1st floor training room and 2nd floor office spaces. Remove old VCT in 2nd floor office spaces and hall with a new VCT tile. Carpet in office spaces to be replaced with new carpet. Paint walls in 2nd floor offices spaces and hallway. Contractor to remove office furniture and put back in place. Paint walls on all bay areas, Paint new lines on bay floors. Replace/patch damaged walls in bay areas in two (2) locations. CLIN 002 Exterior: Repairs include remove and replacement of a three (3) bay standing seam metal roof system attached to a pre-manufactured metal structure, including a galvanized valley/gutter between bays, all gutter, fascia and downspouts, roof fans and exhaust fans, must meet UFC wind velocities.
From Award Notice posted on Sep 09, 2025Notice history
1Details
Award Information
Award Notices
Posted: Sep 09, 2025
CLIN 001 Interior: Replace existing HVAC (3) systems, currently a 4-ton unit and 2-ton unit. 16 SEER (15 SEER2) minimum efficiency rating. Replace all HVAC ducting in office spaces on 1st and 2nd floor. Engineer and verify HVAC sizing and all pressure testing once complete IAW UFC codes. Remove and...