Contacts, documents and full notice history are available with a subscription.
Solicitation Expired 4 notices 8 documents

PNQS 25-9165 Repair Roofs 682, 1408, and 1409 FA330025RFP0588

Solicitation FA330025RFP0588 Copied Notice ID f863e8464e3d4d9dbf2e7acd1a25d1f5 Copied DEPT OF DEFENSE — FA3300 42 CONS CC
SAM.gov
Posted
Sep 11, 2025
Deadline
Sep 23, 2025
Set-aside
None
NAICS
238160
PSC
Z2AA

Summary

AI-generated · Sep 15, 2025

Repair roofs for Maxwell AFB, Alabama, for buildings 682, 1408, and 1409. Provide all plant, labor, materials, equipment, and supervision necessary to complete the roofing work. All work must be performed in accordance with the attached specifications and drawings.

Furnish all plant, labor, materials, and equipment necessary to perform all work in connection with Project Number, PNQS 25-9165 Repair Roofs 682, 1408, 1409, at Maxwell AFB, Alabama, in accordance with the attached specifications and drawings.

From Solicitation posted on Sep 11, 2025

RFIs - 18 September 2025 682 Is 682 is a two-story building? Yes The drawings call for Asphalt Shingles. Is this correct or will the new roof system be Stone Coated Steel? Drawing A-1 says to install stone coated steel. 1408 Is 1408 a five-story building? Yes The drawings do not show porches are they to be included? Drawing 4 in the package shows the porches, see revised drawings 1409 Is 1409 a five-story building? Yes The drawings do not show porches are they to be included? Yes include the porches, see revised drawings. General Please confirm that the amounts of deck replacement and rafter replacement on the drawings is correct. The solicitation states that the acquisition is unrestricted, yet the size standard is $19,000,000. Is this project set aside for Small Businesses only? Yes, this is a small business set aside. 11 September 2025 Furnish all plant, labor, materials, and equipment necessary to perform all work in connection with Project Number, PNQS 25-9165 Repair Roofs 682, 1408, 1409, at Maxwell AFB, Alabama, in accordance with the attached specifications and drawings.

From Solicitation posted on Sep 18, 2025

Amendment 001 - 23 September 2025 The purpose of this Amendment is to: a) To extend the proposal receipt date to 12PM CDT, 26 September 2025. b) Add updated drawings for this requirement (Note drawings Building 862; to read Remove concrete tiles. Repair decking and install Boral Tile-Seal or equal. Install Stone Coated Steel). c) Demolish the existing lightning protection system from concrete tile roof system at attic and convert to medal roofing system. Design and install a new system in accordance with NFPA 780. The new system must be tested and certified by Lightning Protection Institute. d) POC(s): Contract Specialist Mrs. Kemeshia Smith; Phone (334) 953-2560 or kemeshia.smith@us.af.mil or Contracting Officer Mr. Eldrae Perdue (334) 953-3518. e) All other terms and conditions remain unchanged and in full effect. RFIs - 18 September 2025 682 Is 682 is a two-story building? Yes The drawings call for Asphalt Shingles. Is this correct or will the new roof system be Stone Coated Steel? Drawing A-1 says to install stone coated steel. 1408 Is 1408 a five-story building? Yes The drawings do not show porches are they to be included? Drawing 4 in the package shows the porches, see revised drawings 1409 Is 1409 a five-story building? Yes The drawings do not show porches are they to be included? Yes include the porches, see revised drawings. General Please confirm that the amounts of deck replacement and rafter replacement on the drawings is correct. The solicitation states that the acquisition is unrestricted, yet the size standard is $19,000,000. Is this project set aside for Small Businesses only? Yes, this is a small business set aside. 11 September 2025 Furnish all plant, labor, materials, and equipment necessary to perform all work in connection with Project Number, PNQS 25-9165 Repair Roofs 682, 1408, 1409, at Maxwell AFB, Alabama, in accordance with the attached specifications and drawings.

From Solicitation posted on Sep 23, 2025

RFIs - 24 September 2025 RFI Question: Does Bldg 1408 and 1409 need a NEW lightning protection system, including new downleads and grounds, to meet the requirements provided in the amendment? Response: Just the points that are in contact with new roof system. The Lightening Protection is on both buildings now. The problem is that, its copper. We are changing the roof system from concrete tils to a steel roof system. Copper cannot be used on a metal roof system. So all points connected to the new roof system has the be aluminum. In the attic, these parts will be converted from aluminum back to copper wire in the attic per code. RFI Question: To clarify, does the lightning protection system need to be installed on all 3 buildings or just BLDG 1408 as shown in the updated drawing? Response: Buildings 1408 and 1409 are the same buildings, therefore lightening protection will need to be included for buildings 1408 and 1409. Amendment 001 - 23 September 2025 The purpose of this Amendment is to: a) To extend the proposal receipt date to 12PM CDT, 26 September 2025. b) Add updated drawings for this requirement (Note drawings Building 862; to read Remove concrete tiles. Repair decking and install Boral Tile-Seal or equal. Install Stone Coated Steel). c) Demolish the existing lightning protection system from concrete tile roof system at attic and convert to medal roofing system. Design and install a new system in accordance with NFPA 780. The new system must be tested and certified by Lightning Protection Institute. d) POC(s): Contract Specialist Mrs. Kemeshia Smith; Phone (334) 953-2560 or kemeshia.smith@us.af.mil or Contracting Officer Mr. Eldrae Perdue (334) 953-3518. e) All other terms and conditions remain unchanged and in full effect. RFIs - 18 September 2025 682 Is 682 is a two-story building? Yes The drawings call for Asphalt Shingles. Is this correct or will the new roof system be Stone Coated Steel? Drawing A-1 says to install stone coated steel. 1408 Is 1408 a five-story building? Yes The drawings do not show porches are they to be included? Drawing 4 in the package shows the porches, see revised drawings 1409 Is 1409 a five-story building? Yes The drawings do not show porches are they to be included? Yes include the porches, see revised drawings. General Please confirm that the amounts of deck replacement and rafter replacement on the drawings is correct. The solicitation states that the acquisition is unrestricted, yet the size standard is $19,000,000. Is this project set aside for Small Businesses only? Yes, this is a small business set aside. 11 September 2025 Furnish all plant, labor, materials, and equipment necessary to perform all work in connection with Project Number, PNQS 25-9165 Repair Roofs 682, 1408, 1409, at Maxwell AFB, Alabama, in accordance with the attached specifications and drawings.

From Solicitation posted on Sep 24, 2025

Notice history

4
  1. Solicitation Posted Sep 11, 2025
  2. Solicitation Posted Sep 18, 2025
    • Description: Description was updated
  3. Solicitation Posted Sep 23, 2025
    • Title: PNQS 25-9165 Repair Roofs 682, 1408, and 1409Replace Roofs 682, 1408, and 1409-Amendment 001
    • Description: Description was updated
    • Response Deadline: Sep 23, 2025Sep 26, 2025
  4. Solicitation LATEST Posted Sep 24, 2025
    • Title: Replace Roofs 682, 1408, and 1409-Amendment 001Replace Roofs 682, 1408, and 1409-Amendment 0001
    • Description: Description was updated

Details

Solicitation number FA330025RFP0588
Notice ID f863e8464e3d4d9dbf2e7acd1a25d1f5
Notice type Solicitation
Product / Service (PSC) Z2AA
NAICS 238160
Place of performance Montgomery, Alabama
Archive date Oct 08, 2025

Award Information

Not yet awarded

Contacts

primary
Kemeshia Smith

Email

Phone

secondary
Eldrae A. Perdue

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
AIR EDUCATION AND TRAINING COMMAND
FA3300 42 CONS CC

Place of Performance

Montgomery, Alabama 36112
USA

Dates

Posted Sep 11, 2025 10 months ago
Last Updated Aug 06, 2026 2 days ago
Due Sep 23, 2025 10 months ago