PN 90610 SOF Arms Room Addition W912PM25R0021
Summary
AI-generated · Aug 23, 2025Renovation of an Arms Room and construction of a new loading bay at Fort Bragg, NC requires a contractor to provide all labor, materials, equipment, incidentals, supervision, and transportation to renovate the Arms Room in the SOTF main administrative building (0190M) and to construct the loading bay. The project includes a unique building fortification not included in the base construction cost, and requires fire detection, alarm, and suppression systems connected to an Energy Monitoring Control System (EMCS), plus building information systems, an Intrusion Detection System (IDS), and a Mass Notification System. Hazardous materials abatement and a swing-space move are also required, along with comprehensive interior design services.
Sustainable design features per DoD policies (SDD and EPAct05) must be provided, with supporting facilities including site development and utilities (electrical service, water, sewer, gas), main power upgrades, lighting, paving, storm drainage, information systems, landscaping, and signage. The project adheres to DoD Minimum Antiterrorism for Buildings standards, requires accessibility for people with disabilities, and must include cyber security measures. Buildings are to be designed for a minimum 40-year life per UFC 1-200-02, with energy-efficient and integrated building systems performance, and heating/air conditioning to be supplied by self-contained systems. Amendment 0001 provides updated documents in response to bidder inquiries.
This is a solicitation for the renovation of an Arms Room and addition of a loading bay at Fort Bragg, NC. The scope of work includes ALL labor, materials, equipment, incidentals, supervision, and transportation for work necessary to renovate the Arms Room in the SOTF main administrative building, 0190M, at Fort Bragg, NC (PN 90610 SOF Arms Room Addition). Project consists of new construction of Loading Bay and renovation of Arms Room. Building fortification for this project is unique in nature and not included in the unit cost of the building. Provide fire detection, alarm, and suppression systems and connection to Energy Monitoring Control Systems (EMCS). Install building information systems, Intrusion Detection System (IDS) and Mass Notification System. Provide hazardous materials abatement and swing space move. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features are required to be provided. Supporting facilities include site development, utilities and connections (electrical service, water, sewer, and gas), upgrade the main power supply, lighting, paving, storm drainage, information systems, landscaping and signage. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards are required to be provided. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities are required to be provided. Cyber Security Measures are required to be incorporated into this project. Facilities will be designed to a minimum life of 40 years in accordance with DoD Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies and integrated building systems performance. Heating and air conditioning are required to be provided by self-contained systems. ***AMENDMENT 0001 - PROVIDES UPDATED DOCUMENTS IN RESPONSE TO BIDDER INQUIRIES.***
From Solicitation posted on Jun 25, 2025Award Notice for PN 90610 SOF Arms Room Addition Construction, Fort Bragg, North Carolina.
From Award Notice posted on Sep 05, 2025Notice history
2-
Solicitation Posted Jun 25, 2025
-
Award Notice LATEST Posted Sep 05, 2025
Details
Award Information
Award Notices
Posted: Sep 05, 2025
Award Notice for PN 90610 SOF Arms Room Addition Construction, Fort Bragg, North Carolina.
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| 4K Global-ACC MP, LLC | R5L6ZTP35AL8 | 119Q5 | Martinez, GA |
Contacts
Phone
Phone
Agency
Place of Performance
28310