Z--PMOC DISPATCH REMODEL 89503225BWA000066
Summary
AI-generated · Aug 23, 2025Remodel PMOC Dispatch area: remodel the existing kitchen, operators lounge, and restrooms, including relocating the operator’s restroom entry door to the east side, relocating the Southeast entry door to a double-door frame in the basement hallway, and remodeling the men’s and women’s restrooms in the basement hallway. The contractor shall perform all necessary demolition to prepare the work area for construction.
The two records describe the same scope of work, with no new information or changes between notices.
PMOC Dispatch Remodel of existing kitchen, operators restroom, hall restrooms; and adding/removing doors. The Contractor shall conduct all necessary demolition to prepare the work area for construction. Requirement includes the following remodel: the existing Dispatch Kitchen and Operators lounge, the existing operator s restroom including relocating the entry door to the east side of the restroom, existing men s and women s restrooms in the basement hallway, and relocate the existing Southeast entry door to the double door frame at the basement hallway.
From Solicitation posted on Jun 10, 2025PMOC Dispatch Remodel of existing kitchen, operators restroom, hall restrooms; and adding/removing doors. The Contractor shall conduct all necessary demolition to prepare the work area for construction. Requirement includes the following remodel: the existing Dispatch Kitchen and Operators lounge, the existing operator s restroom including relocating the entry door to the east side of the restroom, existing men s and women s restrooms in the basement hallway, and relocate the existing Southeast entry door to the double door frame at the basement hallway.
From Solicitation posted on Jul 02, 2025PMOC Dispatch Remodel of existing kitchen, operators restroom, hall restrooms; and adding/removing doors. The Contractor shall conduct all necessary demolition to prepare the work area for construction. Requirement includes the following remodel: the existing Dispatch Kitchen and Operators lounge, the existing operator s restroom including relocating the entry door to the east side of the restroom, existing men s and women s restrooms in the basement hallway, and relocate the existing Southeast entry door to the double door frame at the basement hallway.
From Award Notice posted on Sep 02, 2025Notice history
3-
-
Solicitation Posted Jul 02, 2025View changes (1)
- Title: PMOC DISPATCH REMODEL → Z--PMOC DISPATCH REMODEL
-
Award Notice LATEST Posted Sep 02, 2025
Details
Award Information
Award Notices
Posted: Sep 02, 2025
PMOC Dispatch Remodel of existing kitchen, operators restroom, hall restrooms; and adding/removing doors. The Contractor shall conduct all necessary demolition to prepare the work area for construction. Requirement includes the following remodel: the existing Dispatch Kitchen and Operators lounge, t...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| COMPLETE CONCRETE, INC. | E9K4B6AG2Q68 | 4VBK3 | Rapid City, SD |
Contacts
Phone