Please see attachment for details on AM0010. W9127825RA005
Summary
AI-generated · Aug 23, 2025This project is for a new aviation fuel storage facility at Soto Cano Air Base, Honduras, with a minimum total capacity of 300,000 gallons. It requires three factory-fabricated 100,000-gallon tanks placed on a curbed foundation slab to contain small drips and spills. The system must include two commercial truck offload skids (redundancy and faster fuel receipt, each offloading at 600 GPM) and two truck fillstands (each capable of delivering fuel at 600 GPM). A POL Ops building must be provided to house a fuel laboratory that meets the C++ sizing requirement described in UFC 4-310-03.
The notices encompass several solicitation identifiers (AM0006, AM0007, AM0010) that all describe the same scope and requirements for this facility; no substantive changes are indicated across the notices beyond the different solicitation IDs.
AVIATION FUEL STORAGE FACILITY AT SOTO CANO AIR BASE, HONDURAS. The project is for a new fuel storage facility that will provide a minimum of 300,000 gallons of fuel storage. Three nominally 100,000-gallon factory fabricated storage tanks will be provided to meet this requirement. The three storage tanks will be placed on a curbed foundation slab for containment of small drips and spills. The system will be provided with two (2) commercial truck offload skids to provide system redundancy as well as an increased rate of fuel receipt. Each of the commercial offload skids will be capable of offloading at a rate of 600 GPM. The new fuel system will have two (2) truck fillstands, each capable of issuing fuel at a rate of 600 GPM. The new system will require a POL Ops building equipped with a fuel laboratory meeting C++ sizing requirement as outlined in UFC 4- 310-03.
From Solicitation posted on Jun 18, 2025AVIATION FUEL STORAGE FACILITY AT SOTO CANO AIR BASE, HONDURAS. The project is for a new fuel storage facility that will provide a minimum of 300,000 gallons of fuel storage. Three nominally 100,000-gallon factory fabricated storage tanks will be provided to meet this requirement. The three storage tanks will be placed on a curbed foundation slab for containment of small drips and spills. The system will be provided with two (2) commercial truck offload skids to provide system redundancy as well as an increased rate of fuel receipt. Each of the commercial offload skids will be capable of offloading at a rate of 600 GPM. The new fuel system will have two (2) truck fillstands, each capable of issuing fuel at a rate of 600 GPM. The new system will require a POL Ops building equipped with a fuel laboratory meeting C++ sizing requirement as outlined in UFC 4- 310-03.
From Solicitation posted on Jul 02, 2025AVIATION FUEL STORAGE FACILITY AT SOTO CANO AIR BASE, HONDURAS. The project is for a new fuel storage facility that will provide a minimum of 300,000 gallons of fuel storage. Three nominally 100,000-gallon factory fabricated storage tanks will be provided to meet this requirement. The three storage tanks will be placed on a curbed foundation slab for containment of small drips and spills. The system will be provided with two (2) commercial truck offload skids to provide system redundancy as well as an increased rate of fuel receipt. Each of the commercial offload skids will be capable of offloading at a rate of 600 GPM. The new fuel system will have two (2) truck fillstands, each capable of issuing fuel at a rate of 600 GPM. The new system will require a POL Ops building equipped with a fuel laboratory meeting C++ sizing requirement as outlined in UFC 4- 310-03.
From Solicitation posted on Jul 11, 2025AVIATION FUEL STORAGE FACILITY AT SOTO CANO AIR BASE, HONDURAS. The project is for a new fuel storage facility that will provide a minimum of 300,000 gallons of fuel storage. Three nominally 100,000-gallon factory fabricated storage tanks will be provided to meet this requirement. The three storage tanks will be placed on a curbed foundation slab for containment of small drips and spills. The system will be provided with two (2) commercial truck offload skids to provide system redundancy as well as an increased rate of fuel receipt. Each of the commercial offload skids will be capable of offloading at a rate of 600 GPM. The new fuel system will have two (2) truck fillstands, each capable of issuing fuel at a rate of 600 GPM. The new system will require a POL Ops building equipped with a fuel laboratory meeting C++ sizing requirement as outlined in UFC 4- 310-03.
From Solicitation posted on Jul 14, 2025AVIATION FUEL STORAGE FACILITY AT SOTO CANO AIR BASE, HONDURAS. The project is for a new fuel storage facility that will provide a minimum of 300,000 gallons of fuel storage. Three nominally 100,000-gallon factory fabricated storage tanks will be provided to meet this requirement. The three storage tanks will be placed on a curbed foundation slab for containment of small drips and spills. The system will be provided with two (2) commercial truck offload skids to provide system redundancy as well as an increased rate of fuel receipt. Each of the commercial offload skids will be capable of offloading at a rate of 600 GPM. The new fuel system will have two (2) truck fillstands, each capable of issuing fuel at a rate of 600 GPM. The new system will require a POL Ops building equipped with a fuel laboratory meeting C++ sizing requirement as outlined in UFC 4- 310-03.
From Solicitation posted on Jul 15, 2025Notice history
5-
-
Solicitation Posted Jul 02, 2025View changes (1)
- Title: Please see attachment for details on AM0006. → Please see attachment for details on AM0007.
-
Solicitation Posted Jul 11, 2025No changes from previous notice
-
Solicitation LATEST Posted Jul 15, 2025View changes (1)
- Title: Please see attachment for details on AM0007. → Please see attachment for details on AM0010.
Details
Award Information
Not yet awarded
Contacts
Phone
Phone