Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 2 notices 3 documents

Playground Maintenance FA521525Q0057

Solicitation FA521525Q0057 Copied Notice ID 90dbf3d63d004fb8bba940679643d6d5 Copied DEPT OF DEFENSE — FA5215 766 ESS PKP
SAM.gov
Posted
Sep 17, 2025
Deadline
Sep 25, 2025
Set-aside
SBA
NAICS
238990
PSC
J035

Summary

AI-generated · Sep 29, 2025

Implement a 12-month playground maintenance program with quarterly inspections and services to keep all playground equipment and surfacing safe and functional. Tasks include conducting quarterly inspections, tightening or replacing loose/missing hardware, pressure washing structures and surfacing, removing debris and mildew, controlling corrosion and rust, patching cracks or holes in safety surfacing up to 25 square feet per visit, and providing inspection reports after each visit that document completed maintenance, identify broken or worn items, list recommended replacement parts, and include photographs of deficiencies and completed actions. There are no changes between the two notices; the scope and requirements are identical.

Scope of Work The contractor shall implement a 12-month playground maintenance program consisting of quarterly inspections and services. 3.1 Inspections and Maintenance The contractor shall: - Conduct quarterly inspections of all playground equipment and surfacing. - Tighten loose hardware and replace missing hardware. - Pressure wash all structures and surfacing; remove debris, dirt, and mildew. - Control corrosion and rust to prevent further deterioration. - Patch cracks or holes in safety surfacing up to 25 square feet per visit. - Provide inspection reports after each visit. Reports shall: - Document completed maintenance tasks. - Identify broken, damaged, or worn items. - Provide a list of recommended replacement parts. - Include photographs of deficiencies and completed actions.

From Combined Synopsis/Solicitation posted on Sep 17, 2025

Scope of Work The contractor shall implement a 12-month playground maintenance program consisting of quarterly inspections and services. 3.1 Inspections and Maintenance The contractor shall: - Conduct quarterly inspections of all playground equipment and surfacing. - Tighten loose hardware and replace missing hardware. - Pressure wash all structures and surfacing; remove debris, dirt, and mildew. - Control corrosion and rust to prevent further deterioration. - Patch cracks or holes in safety surfacing up to 25 square feet per visit. - Provide inspection reports after each visit. Reports shall: - Document completed maintenance tasks. - Identify broken, damaged, or worn items. - Provide a list of recommended replacement parts. - Include photographs of deficiencies and completed actions.

From Combined Synopsis/Solicitation posted on Sep 19, 2025

Notice history

2
  1. Combined Synopsis/Solicitation Posted Sep 17, 2025
  2. Combined Synopsis/Solicitation LATEST Posted Sep 19, 2025
    No changes from previous notice

Details

Solicitation number FA521525Q0057
Notice ID 90dbf3d63d004fb8bba940679643d6d5
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) J035
NAICS 238990
Place of performance JBPHH, Hawaii
Archive date Oct 10, 2025

Award Information

Not yet awarded

Contacts

primary
MSgt Jerime Gorse

Email

Phone

secondary
Thomas Hembree

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE AIR FORCE
PACIFIC AIR FORCES
FA5215 766 ESS PKP

Place of Performance

JBPHH, Hawaii 96860
USA

Dates

Posted Sep 17, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Due Sep 25, 2025 10 months ago