PKA B665 REPAIR WASTEWATER PIPES FA442725R0017
Summary
AI-generated · Aug 24, 2025Design Build project on Travis AFB to repair the sanitary sewer system at B665. Proposals must be prepared in accordance with the attached SF1442 Solicitation FA4427250017 and its attachments, which provide instructions on how to prepare the proposal and list site visit dates, RFI deadlines, and proposal due dates. There are no changes between the notices; both refer to the same requirement.
The proprosed acquistion is for a Design Build project on Travis AFB to repair the sanitary sewer system at B665. Please see the attached SF1442 Solicitation FA4427250017 and attachments for instructions on how to pepare a proposal, site visit dates, RFI deadlines, and proposal due dates.
From Solicitation posted on Jul 11, 2025The proprosed acquistion is for a Design Build project on Travis AFB to repair the sanitary sewer system at B665. Please see the attached SF1442 Solicitation FA4427250017 and attachments for instructions on how to pepare a proposal, site visit dates, RFI deadlines, and proposal due dates.
From Solicitation posted on Jul 23, 2025Notice history
2-
-
Solicitation LATEST Posted Jul 23, 2025No changes from previous notice
Details
Award Information
Not yet awarded
Documents
8Contacts
Phone
Phone
Agency
Place of Performance
USA