PEDESTRIAN BRIDGE REPLACEMENT, TRUMAN ANNEX, NAS KEY WEST, FL N6945025F1247
Summary
AI-generated · Aug 28, 2025Replace the pedestrian bridge at Truman Annex, NAS Key West, Florida, with a firm-fixed-price task order under an existing 8(a) IDIQ contract for construction.
This action uses FAR 6.302-5(a)(2)(i) authority (8(a) program). Awarded to HZ Construction Inc. for about $2.54 million.
This is a firm fixed-price task order issued under an existing 8(a) IDIQ contract for constructions as Authorized by Statute(FAR6.302-5(a)(2)(i)
From Award Notice posted on Aug 27, 2025Notice history
1Details
Award Information
Award Notices
Posted: Aug 27, 2025
This is a firm fixed-price task order issued under an existing 8(a) IDIQ contract for constructions as Authorized by Statute(FAR6.302-5(a)(2)(i)
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| HZ CONSTRUCTION INC | MMXBQZ4HALN8 | 8PYA2 | Orlando, FL |
Agency
Place of Performance
USA