Pave Parking Area at John W. Flannagan Dam and Reservoir W9123725QA061
Summary
AI-generated · Sep 04, 2025Pave a 4,000-square-yard parking area at John W. Flannagan Dam and Reservoir, starting at the entrance to the project office and continuing through the main office parking area. Provide all materials, equipment, labor, layouts, and supervision. Work includes applying a tack coat per VDOT 310-1 at 0.10 gallons per square yard, placing a 2-inch surface course per VDOT 315-1, and ensuring full-depth pavement. Where there is no existing base, install an additional 2–4 inches of aggregate base per VDOT 309-1, then a two-layer asphalt base per BM-2, apply the tack coat again at 0.10 gal/yd², and place a final 1-inch surface course per SM-2-A. The paving must drain properly with no standing water and the site must be prepared to avoid low or high spots; taper the asphalt to adjoining roads and parking areas.
A drawing defines the approximate area for reference, but it is not to scale and the depicted buildings may no longer be present.
The contractor shall provide all materials, equipment, labor, layouts of work features, and supervision needed to complete paving.Project construction will generally consist of the following items of work:? The Contractor shall apply a tack coat conforming to VDOT Item 310-1 on all areas to be resurfaced. Tack coat shall be placed at 0.10 gallons per square yard. ? The Contractor shall place a 2 inch surface course of asphalt concrete pavement on all areas, surface course must conform to VDOT Item 315-1. Asphalt will begin at the entrance to the project office from main road and shall continue up thru the Main office parking area, 4000 square yards. All paving will be full depth. The existing parking area has an existing gravel base.? Contractor shall ensure all paving will drain water without any water standing. Contractor shall prepare the site to avoid any low or high spots before paving. ? Paving is 4000 square yards feet of full depth pavement consisting of a 2-base course with a 1 ? top coat surface course which shall conform to the same VDOT specifications required.? The Contractor shall grade, reshape, and compact all areas as needed. In areas with no existing base, the Contractor shall place and compact an additional 2- 4-inch aggregate base in accordance with VDOT Item 309-1. A two-layer asphalt base course shall be installed per VDOT Item 315-1, BM-2. A tack coat, per VDOT Item 310-1 shall be applied at a rate of .10 gallons per square yard. Finally, a 1 inch asphalt surface course shall be placed over all base material, conforming to VDOT Item 315-1, SM-2-A. ? Contractor shall taper asphalt to adjoining roads and parking areas. ? A drawing defining the approximate area is included below. Note, buildings in the drawing are no longer in the area. Drawing is not to scale and used for a reference only. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here.
From Combined Synopsis/Solicitation posted on Sep 03, 2025The contractor shall provide all materials, equipment, labor, layouts of work features, and supervision needed to complete paving.Project construction will generally consist of the following items of work:? The Contractor shall apply a tack coat conforming to VDOT Item 310-1 on all areas to be resurfaced. Tack coat shall be placed at 0.10 gallons per square yard. ? The Contractor shall place a 2 inch surface course of asphalt concrete pavement on all areas, surface course must conform to VDOT Item 315-1. Asphalt will begin at the entrance to the project office from main road and shall continue up thru the Main office parking area, 4000 square yards. All paving will be full depth. The existing parking area has an existing gravel base.? Contractor shall ensure all paving will drain water without any water standing. Contractor shall prepare the site to avoid any low or high spots before paving. ? Paving is 4000 square yards feet of full depth pavement consisting of a 2-base course with a 1 ? top coat surface course which shall conform to the same VDOT specifications required.? The Contractor shall grade, reshape, and compact all areas as needed. In areas with no existing base, the Contractor shall place and compact an additional 2- 4-inch aggregate base in accordance with VDOT Item 309-1. A two-layer asphalt base course shall be installed per VDOT Item 315-1, BM-2. A tack coat, per VDOT Item 310-1 shall be applied at a rate of .10 gallons per square yard. Finally, a 1 inch asphalt surface course shall be placed over all base material, conforming to VDOT Item 315-1, SM-2-A. ? Contractor shall taper asphalt to adjoining roads and parking areas. ? A drawing defining the approximate area is included below. Note, buildings in the drawing are no longer in the area. Drawing is not to scale and used for a reference only. **NOTICE** Information regarding the U.S. Army Corps of Engineers process for settling requests for equitable adjustments and duration goals to achieve definitization of equitable adjustments for change orders under construction contracts can be found by going to https://www.usace.army.mil/Business-With-Us/Partnering/ then clicking on View FFP Contract Changes Playbook Here. 9/8 - Amendment 0001 published to 1) update the Contract Line Items and 2) replace FAR Clause 52.219-28 Alternate I with the base clause.
From Combined Synopsis/Solicitation posted on Sep 08, 2025Notice history
2-
-
Combined Synopsis/Solicitation LATEST Posted Sep 08, 2025View changes (1)
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Phone
Phone
Agency
Place of Performance
24256