Parking Lot Stormwater Treatment Vault Service and Maintenance 6991PE25Q000013
Summary
AI-generated · Sep 05, 2025Parking lot stormwater treatment vault service and maintenance is required, as described in the attached Statement of Work. The work covers ongoing service and maintenance of the stormwater treatment vaults at the Suisun Bay Reserve Fleet facility, with submittal instructions and evaluation criteria located in Sections 9 and 10 of the Combined Synopsis/Solicitation.
An amendment adds posted Questions and Answers, and notes a site visit may be scheduled; to attend the site visit, confirm attendance with the designated contact per the amendment.
The U.S. Department of Transportation (DOT), Maritime Administration (MARAD), Suisun Bay Reserve Fleet (SBRF) has a requirement for parking lot stormwater treatment vault service and maintenance identified in the attached Statement of Work (SOW). Refer to Sections 9 and 10 of the Combined Synopsis/Solicitation for submittal instructions and evaluation criteria.
From Combined Synopsis/Solicitation posted on Sep 03, 2025The U.S. Department of Transportation (DOT), Maritime Administration (MARAD), Suisun Bay Reserve Fleet (SBRF) has a requirement for parking lot stormwater treatment vault service and maintenance identified in the attached Statement of Work (SOW). Refer to Sections 9 and 10 of the Combined Synopsis/Solicitation for submittal instructions and evaluation criteria. RFQ Amendment 1: The purpose of this amendment is to post the Questions and Answers (Q&As). If your firm is interested in attending a site visit, please contact Mr. Luis Martinez via email at luis.martinez@dot.gov or telephone at (707) 747-7803 to confirm attendance.
From Combined Synopsis/Solicitation posted on Sep 04, 2025The U.S. Department of Transportation (DOT), Maritime Administration (MARAD), Suisun Bay Reserve Fleet (SBRF) has a requirement for parking lot stormwater treatment vault service and maintenance identified in the attached Statement of Work (SOW). Refer to Sections 9 and 10 of the Combined Synopsis/Solicitation for submittal instructions and evaluation criteria. RFQ Amendment 1: The purpose of this amendment is to post the Questions and Answers (Q&As). If your firm is interested in attending a site visit, please contact Mr. Luis Martinez via email at luis.martinez@dot.gov or telephone at (707) 747-7803 to confirm attendance. RFQ Amendment 2: The purpose of this amendment is to post the second set of Q&As.
From Combined Synopsis/Solicitation posted on Sep 09, 2025Notice history
3-
Combined Synopsis/Solicitation Posted Sep 03, 2025
-
Combined Synopsis/Solicitation Posted Sep 04, 2025View changes (1)
- Description: Description was updated
-
Combined Synopsis/Solicitation LATEST Posted Sep 09, 2025View changes (2)
- Title: Parking Lot Stormwater Treatment Vault Service and Maintenance → SBRF Parking Lot Stormwater Treatment Vault Service and Maintenance
- Description: Description was updated
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA