Pactola Loop B Campground Reconstruction Project 1240LT26Q0010
Summary
AI-generated · Feb 04, 2026Reconstruct Loop B Campground at Pactola Reservoir, including widening and resurfacing the loop road to support 16 ft one-way and 24 ft two-way traffic, with curve widening and drainage improvement. Add a new 20-stall Osprey Trail parking area, and repurpose the existing Osprey Trail trailhead for overflow and boat-trailer parking. Increase camping spurs from 20 primitive sites to 36 base items; relocate the Host Site (with power, water, and a wastewater vault) to the beginning of the loop, with the former Host Site converted to a Volunteer Site supported by upgraded water and electric and continued use of the sewage vault. An optional item provides removal and replacement of the sewage vault with a new concrete vault.
Water system upgrades involve decommissioning the existing pumphouse and replacing it with a new precast concrete treatment building, upgrading plumbing and controls, replacing all distribution piping, and installing new hydrants. The current system is a poor-condition Transient Non-Community Public water system, with nonfunctional pump controls and treatment, leaky distribution, and inaccessible hydrants; the plan also relocates the water-related facilities as described. Plan sheets showing future tent sites and an on-site toilet are outside the contract scope. This Congressionally directed Great American Outdoors Act project encompasses design, construction, and resurfacing to increase capacity, improve the water system, and upgrade host sites and sewage vaults for modern recreational use.
PROJECT'S NAME: PACTOLA LOOP B CAMPGROUND RECONSTRUCTION PROJECT Questions are due by 9:00 a.m. Central Time on February 12, 2026; Quotes are due by 9:00 a.m. Central Time on March 10, 2026. Questions and Quotes shall be emailed by the due dates and time to the Contract Specialist, Janice King, at janice.king@usda.gov AND to the Conracting Officer, Lucas Dahlman at lucas.dahlman@usda.gov. See Attach 1 - Solicitation Terms and Conditions with its supporting Attachments, Attach 2 -15. Read each document in its entireity. Attachments are located in the Attachments/Links section. Solicitation Number 1240LT26Q0010 is being issued as a Request for Quotation for The Pactola Campground Loop B Construction Project. The Campground is on a Forest Service loop road adjacent to Pactola Reservoir. The road is approximately 14 ft wide. The road will be modified with curve widening and shaping for drainage and new surfacing. Generally, the road width will be 16 for one-way traffic and 24 for two-way traffic. A new 20 parking stall trailhead will be constructed for the Osprey Trail. The existing Osprey Trail trailhead will be repurposed as overflow and boat trailer parking serving Loop B. Furthermore, Loop B currently has 20 spurs that are primitive and poorly defined. The Campground will be improved to have a total of 36 camping spurs as Base Items. There is currently one Host Site, with power, water, and wastewater vault, located near the center of the campground. The Host Site and associated infrastructure will be relocated to the beginning of the Loop, for improved service to campers. The existing Host Site will become a Volunteer Site with upgraded water and electric service and continued use of the sewage vault; there is an Option Item to remove and replace the sewage vault with a new concrete vault. Water system work for this project consists of decommissioning the existing pumphouse and replacing it with a new precast concrete treatment building with upgraded plumbing and controls, replacing all the distribution piping and installing new hydrants. Plan sheets showing additional tent sites on the west side of Loop B and a toilet located in the infield of the Osprey Trailhead parking area are for future construction and will not be part of this contract. This is a Congressionally directed Great American Outdoors Act project that will make improvements to the road - to include design, construction and resurfacing. Pactola Campground Loop B will be reconstructed to increase capacity, improve the water system, and improve host sites with repaired sewage vaults. Camp sites will be designed for modern recreational vehicles using modern design and furnished with modern amenities. The Pactola Reservoir Campground is a seasonal campground operated from approximately mid-May to mid-September annually. The Campground has three Loops: A, B, and C. This project is for reconstruction of Loop B. The Project will be referred to as Pactola Loop B CG or Loop B throughout the Specifications and Contract documents. The water system at Pactola Reservoir Campground consists of a well with a submersible pump, steel below ground water storage tank, and distribution system with 7 points of use. This system is classified as a Transient Non-Community Public water system. The water system is in poor condition. The well needs pump controls, treatment system, and pump house are not functioning properly, are not compliant with codes and require replacement. The distribution system has numerous leaks, is in poor condition and requires replacement. The existing hydrants are not accessible and require upgrades. The stick-built pumphouse building is in poor condition and has inadequate lighting and inadequate ventilation.
From Solicitation posted on Feb 03, 2026PROJECT'S NAME: PACTOLA LOOP B CAMPGROUND RECONSTRUCTION PROJECT Quotes are due by 9:00 a.m. Central Time on March 10, 2026. (Questions were due by 9:00 a.m. Central Time on February 12, 2026); Quotes shall be emailed by the due datesand time to the Contract Specialist, Janice King, at janice.king@usda.gov AND to the Conracting Officer, Lucas Dahlman at lucas.dahlman@usda.gov. 02/12/2026: Issuance of Amendment One (A0001_Summary of Changes_Pactola Loop B Reconstruction). This amendment was issued to provide answers to contractor's questions and to provide the site visit's attendee's list. See this document in the Attachment/Links section. Quotes are due by 9:00 a.m. Central Time on March 10, 2026. See Attach 1 for quote submission requirements. See Attach 1 - Solicitation Terms and Conditions with its supporting Attachments, Attach 2 -15. Read each document in its entireity. Attachments are located in the Attachments/Links section. Solicitation Number 1240LT26Q0010 is being issued as a Request for Quotation for The Pactola Campground Loop B Construction Project. The Campground is on a Forest Service loop road adjacent to Pactola Reservoir. The road is approximately 14 ft wide. The road will be modified with curve widening and shaping for drainage and new surfacing. Generally, the road width will be 16 for one-way traffic and 24 for two-way traffic. A new 20 parking stall trailhead will be constructed for the Osprey Trail. The existing Osprey Trail trailhead will be repurposed as overflow and boat trailer parking serving Loop B. Furthermore, Loop B currently has 20 spurs that are primitive and poorly defined. The Campground will be improved to have a total of 36 camping spurs as Base Items. There is currently one Host Site, with power, water, and wastewater vault, located near the center of the campground. The Host Site and associated infrastructure will be relocated to the beginning of the Loop, for improved service to campers. The existing Host Site will become a Volunteer Site with upgraded water and electric service and continued use of the sewage vault; there is an Option Item to remove and replace the sewage vault with a new concrete vault. Water system work for this project consists of decommissioning the existing pumphouse and replacing it with a new precast concrete treatment building with upgraded plumbing and controls, replacing all the distribution piping and installing new hydrants. Plan sheets showing additional tent sites on the west side of Loop B and a toilet located in the infield of the Osprey Trailhead parking area are for future construction and will not be part of this contract. This is a Congressionally directed Great American Outdoors Act project that will make improvements to the road - to include design, construction and resurfacing. Pactola Campground Loop B will be reconstructed to increase capacity, improve the water system, and improve host sites with repaired sewage vaults. Camp sites will be designed for modern recreational vehicles using modern design and furnished with modern amenities. The Pactola Reservoir Campground is a seasonal campground operated from approximately mid-May to mid-September annually. The Campground has three Loops: A, B, and C. This project is for reconstruction of Loop B. The Project will be referred to as Pactola Loop B CG or Loop B throughout the Specifications and Contract documents. The water system at Pactola Reservoir Campground consists of a well with a submersible pump, steel below ground water storage tank, and distribution system with 7 points of use. This system is classified as a Transient Non-Community Public water system. The water system is in poor condition. The well needs pump controls, treatment system, and pump house are not functioning properly, are not compliant with codes and require replacement. The distribution system has numerous leaks, is in poor condition and requires replacement. The existing hydrants are not accessible and require upgrades. The stick-built pumphouse building is in poor condition and has inadequate lighting and inadequate ventilation.
From Solicitation posted on Feb 12, 2026PROJECT'S NAME: PACTOLA LOOP B CAMPGROUND RECONSTRUCTION PROJECT Quotes are due by 9:00 a.m. Central Time on March 10, 2026. (Questions were due by 9:00 a.m. Central Time on February 12, 2026. Due to time constraints, and passage of the expiration date for questions, the Government may not respond to additional questions recieved after the issuance of this Amendment. Please read this message and ALL documents associated with this project in their entirety. Quotes shall be emailed by the due date and time to the Contract Specialist, Janice King, at janice.king@usda.gov AND to the Conracting Officer, Lucas Dahlman at lucas.dahlman@usda.gov. 02/24/2026: Issuance of Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction). This amendment was issued to provide answers to the additional contractor's questions received, incorporate an updated Attachment 4 which is: Attach 4 - Updated Pactola Loop B Specifications dated 23FEB2026, and to incorporate Attachment 16 which is: Attach 16 - Well Log_1977 Pactola CG. Going forward, use the newly incorporated Attach 4 - Updated Pactola Loop B Specifications dated 23FEB2026 instead of the initial version dated 16Jan2026. In addition, use Attach 16 - Well Log_1977 Pactola CG to assist with question #10 of the Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction). You will find these documents, along with Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction), in the Attachment/Links section. Quotes are due by 9:00 a.m. Central Time on March 10, 2026. See Attach 1 for quote submission requirements. 02/12/2026: Issuance of Amendment One (A0001_Summary of Changes_Pactola Loop B Reconstruction). This amendment was issued to provide answers to contractor's questions and to provide the site visit's attendee's list. See this document in the Attachment/Links section. Quotes are due by 9:00 a.m. Central Time on March 10, 2026. See Attach 1 for quote submission requirements. See Attach 1 - Solicitation Terms and Conditions with its supporting Attachments, Attach 2 -15. Read each document in its entireity. Attachments are located in the Attachments/Links section. Solicitation Number 1240LT26Q0010 is being issued as a Request for Quotation for The Pactola Campground Loop B Construction Project. The Campground is on a Forest Service loop road adjacent to Pactola Reservoir. The road is approximately 14 ft wide. The road will be modified with curve widening and shaping for drainage and new surfacing. Generally, the road width will be 16 for one-way traffic and 24 for two-way traffic. A new 20 parking stall trailhead will be constructed for the Osprey Trail. The existing Osprey Trail trailhead will be repurposed as overflow and boat trailer parking serving Loop B. Furthermore, Loop B currently has 20 spurs that are primitive and poorly defined. The Campground will be improved to have a total of 36 camping spurs as Base Items. There is currently one Host Site, with power, water, and wastewater vault, located near the center of the campground. The Host Site and associated infrastructure will be relocated to the beginning of the Loop, for improved service to campers. The existing Host Site will become a Volunteer Site with upgraded water and electric service and continued use of the sewage vault; there is an Option Item to remove and replace the sewage vault with a new concrete vault. Water system work for this project consists of decommissioning the existing pumphouse and replacing it with a new precast concrete treatment building with upgraded plumbing and controls, replacing all the distribution piping and installing new hydrants. Plan sheets showing additional tent sites on the west side of Loop B and a toilet located in the infield of the Osprey Trailhead parking area are for future construction and will not be part of this contract. This is a Congressionally directed Great American Outdoors Act project that will make improvements to the road - to include design, construction and resurfacing. Pactola Campground Loop B will be reconstructed to increase capacity, improve the water system, and improve host sites with repaired sewage vaults. Camp sites will be designed for modern recreational vehicles using modern design and furnished with modern amenities. The Pactola Reservoir Campground is a seasonal campground operated from approximately mid-May to mid-September annually. The Campground has three Loops: A, B, and C. This project is for reconstruction of Loop B. The Project will be referred to as Pactola Loop B CG or Loop B throughout the Specifications and Contract documents. The water system at Pactola Reservoir Campground consists of a well with a submersible pump, steel below ground water storage tank, and distribution system with 7 points of use. This system is classified as a Transient Non-Community Public water system. The water system is in poor condition. The well needs pump controls, treatment system, and pump house are not functioning properly, are not compliant with codes and require replacement. The distribution system has numerous leaks, is in poor condition and requires replacement. The existing hydrants are not accessible and require upgrades. The stick-built pumphouse building is in poor condition and has inadequate lighting and inadequate ventilation.
From Solicitation posted on Feb 24, 2026PROJECT'S NAME: PACTOLA LOOP B CAMPGROUND RECONSTRUCTION PROJECT Quotes are due by 9:00 a.m. Central Time on March 10, 2026. (Questions were due by 9:00 a.m. Central Time on February 12, 2026. Due to time constraints, and passage of the expiration date for questions, the Government may not respond to additional questions recieved after the issuance of this Amendment.) Please read this message and ALL documents associated with this project in their entirety. Quotes shall be emailed by the due date and time to the Contract Specialist, Janice King, at janice.king@usda.gov AND to the Conracting Officer, Lucas Dahlman at lucas.dahlman@usda.gov. 02/26/2026: Issuance of Amendment Three (A0003_Summary of Changes_Pactola Loop B Reconstruction). This Amendment was issued to provide answers to additional contractor's questions 18-22. Due to time constraints, and passage of the expiration date for questions, the Government may not respond to additional questions recieved after the issuance of this Amendment. You will find this document in the Attachment/Links section. Quotes are due by 9:00 a.m. Central Time on March 10, 2026. See Attach 1 for quote submission requirements. 02/24/2026: Issuance of Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction). This amendment was issued to provide answers to the additional contractor's questions received, incorporate an updated Attachment 4 which is: Attach 4 - Updated Pactola Loop B Specifications dated 23FEB2026, and to incorporate Attachment 16 which is: Attach 16 - Well Log_1977 Pactola CG. Going forward, use the newly incorporated Attach 4 - Updated Pactola Loop B Specifications dated 23FEB2026 instead of the initial version dated 16Jan2026. In addition, use Attach 16 - Well Log_1977 Pactola CG to assist with question #10 of the Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction). You will find these documents, along with Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction), in the Attachment/Links section. Quotes are due by 9:00 a.m. Central Time on March 10, 2026. See Attach 1 for quote submission requirements. 02/12/2026: Issuance of Amendment One (A0001_Summary of Changes_Pactola Loop B Reconstruction). This amendment was issued to provide answers to contractor's questions and to provide the site visit's attendee's list. See this document in the Attachment/Links section. Quotes are due by 9:00 a.m. Central Time on March 10, 2026. See Attach 1 for quote submission requirements. See Attach 1 - Solicitation Terms and Conditions with its supporting Attachments, Attach 2 -15. Read each document in its entireity. Attachments are located in the Attachments/Links section. Solicitation Number 1240LT26Q0010 is being issued as a Request for Quotation for The Pactola Campground Loop B Construction Project. The Campground is on a Forest Service loop road adjacent to Pactola Reservoir. The road is approximately 14 ft wide. The road will be modified with curve widening and shaping for drainage and new surfacing. Generally, the road width will be 16 for one-way traffic and 24 for two-way traffic. A new 20 parking stall trailhead will be constructed for the Osprey Trail. The existing Osprey Trail trailhead will be repurposed as overflow and boat trailer parking serving Loop B. Furthermore, Loop B currently has 20 spurs that are primitive and poorly defined. The Campground will be improved to have a total of 36 camping spurs as Base Items. There is currently one Host Site, with power, water, and wastewater vault, located near the center of the campground. The Host Site and associated infrastructure will be relocated to the beginning of the Loop, for improved service to campers. The existing Host Site will become a Volunteer Site with upgraded water and electric service and continued use of the sewage vault; there is an Option Item to remove and replace the sewage vault with a new concrete vault. Water system work for this project consists of decommissioning the existing pumphouse and replacing it with a new precast concrete treatment building with upgraded plumbing and controls, replacing all the distribution piping and installing new hydrants. Plan sheets showing additional tent sites on the west side of Loop B and a toilet located in the infield of the Osprey Trailhead parking area are for future construction and will not be part of this contract. This is a Congressionally directed Great American Outdoors Act project that will make improvements to the road - to include design, construction and resurfacing. Pactola Campground Loop B will be reconstructed to increase capacity, improve the water system, and improve host sites with repaired sewage vaults. Camp sites will be designed for modern recreational vehicles using modern design and furnished with modern amenities. The Pactola Reservoir Campground is a seasonal campground operated from approximately mid-May to mid-September annually. The Campground has three Loops: A, B, and C. This project is for reconstruction of Loop B. The Project will be referred to as Pactola Loop B CG or Loop B throughout the Specifications and Contract documents. The water system at Pactola Reservoir Campground consists of a well with a submersible pump, steel below ground water storage tank, and distribution system with 7 points of use. This system is classified as a Transient Non-Community Public water system. The water system is in poor condition. The well needs pump controls, treatment system, and pump house are not functioning properly, are not compliant with codes and require replacement. The distribution system has numerous leaks, is in poor condition and requires replacement. The existing hydrants are not accessible and require upgrades. The stick-built pumphouse building is in poor condition and has inadequate lighting and inadequate ventilation.
From Solicitation posted on Feb 26, 2026PROJECT'S NAME: PACTOLA LOOP B CAMPGROUND RECONSTRUCTION PROJECT Quotes are due by 9:00 a.m. Central Time on March 10, 2026. (Questions were due by 9:00 a.m. Central Time on February 12, 2026. Due to time constraints, and passage of the expiration date for questions, the Government may not respond to additional questions recieved after the issuance of this Amendment.) Please read this message and ALL documents associated with this project in their entirety. Quotes shall be emailed by the due date and time to the Contract Specialist, Janice King, at janice.king@usda.gov AND to the Conracting Officer, Lucas Dahlman at lucas.dahlman@usda.gov. 03/03/2026: Issuance of Amendment Four (A0004_Summary of Changes_Pactola Loop B Reconstruction). This Amendment was issued to provide answers to additional contractor's (questions 23-26) and to incorporate Attach 4. -Updated Pactola Loop B Specifications_02March2026. Going forward, use the Specifications issued in the latest Amendment that includes in its title, the latest date of issuance. To date, the latest Specifications issued is: Attach 4. Updated Pactola Loop B Specifications - 02March2026. You will find the A0004 Summary of Changes and Attach 4. Updated Pactola Loop B Specifications - 02March2026 documents in the Attachment/Links section. Please note: Due to time constraints, and passage of the expiration date for questions, the Government may not respond to additional questions received after the issuance of this Amendment. Quotes are due by 9:00 a.m. Central Time on March 10, 2026. See Attach 1 for quote submission requirements. 02/26/2026: Issuance of Amendment Three (A0003_Summary of Changes_Pactola Loop B Reconstruction). This Amendment was issued to provide answers to additional contractor's questions 18-22. Due to time constraints, and passage of the expiration date for questions, the Government may not respond to additional questions recieved after the issuance of this Amendment. You will find this document in the Attachment/Links section. Quotes are due by 9:00 a.m. Central Time on March 10, 2026. See Attach 1 for quote submission requirements. 02/24/2026: Issuance of Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction). This amendment was issued to provide answers to the additional contractor's questions received, incorporate an updated Attachment 4 which is: Attach 4 - Updated Pactola Loop B Specifications dated 23FEB2026, and to incorporate Attachment 16 which is: Attach 16 - Well Log_1977 Pactola CG. Going forward, use the newly incorporated Attach 4 - Updated Pactola Loop B Specifications dated 23FEB2026 instead of the initial version dated 16Jan2026. In addition, use Attach 16 - Well Log_1977 Pactola CG to assist with question #10 of the Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction). You will find these documents, along with Amendment Two (A0002_Summary of Changes_Pactola Loop B Reconstruction), in the Attachment/Links section. Quotes are due by 9:00 a.m. Central Time on March 10, 2026. See Attach 1 for quote submission requirements. 02/12/2026: Issuance of Amendment One (A0001_Summary of Changes_Pactola Loop B Reconstruction). This amendment was issued to provide answers to contractor's questions and to provide the site visit's attendee's list. See this document in the Attachment/Links section. Quotes are due by 9:00 a.m. Central Time on March 10, 2026. See Attach 1 for quote submission requirements. See Attach 1 - Solicitation Terms and Conditions with its supporting Attachments, Attach 2 -15. Read each document in its entireity. Attachments are located in the Attachments/Links section. Solicitation Number 1240LT26Q0010 is being issued as a Request for Quotation for The Pactola Campground Loop B Construction Project. The Campground is on a Forest Service loop road adjacent to Pactola Reservoir. The road is approximately 14 ft wide. The road will be modified with curve widening and shaping for drainage and new surfacing. Generally, the road width will be 16 for one-way traffic and 24 for two-way traffic. A new 20 parking stall trailhead will be constructed for the Osprey Trail. The existing Osprey Trail trailhead will be repurposed as overflow and boat trailer parking serving Loop B. Furthermore, Loop B currently has 20 spurs that are primitive and poorly defined. The Campground will be improved to have a total of 36 camping spurs as Base Items. There is currently one Host Site, with power, water, and wastewater vault, located near the center of the campground. The Host Site and associated infrastructure will be relocated to the beginning of the Loop, for improved service to campers. The existing Host Site will become a Volunteer Site with upgraded water and electric service and continued use of the sewage vault; there is an Option Item to remove and replace the sewage vault with a new concrete vault. Water system work for this project consists of decommissioning the existing pumphouse and replacing it with a new precast concrete treatment building with upgraded plumbing and controls, replacing all the distribution piping and installing new hydrants. Plan sheets showing additional tent sites on the west side of Loop B and a toilet located in the infield of the Osprey Trailhead parking area are for future construction and will not be part of this contract. This is a Congressionally directed Great American Outdoors Act project that will make improvements to the road - to include design, construction and resurfacing. Pactola Campground Loop B will be reconstructed to increase capacity, improve the water system, and improve host sites with repaired sewage vaults. Camp sites will be designed for modern recreational vehicles using modern design and furnished with modern amenities. The Pactola Reservoir Campground is a seasonal campground operated from approximately mid-May to mid-September annually. The Campground has three Loops: A, B, and C. This project is for reconstruction of Loop B. The Project will be referred to as Pactola Loop B CG or Loop B throughout the Specifications and Contract documents. The water system at Pactola Reservoir Campground consists of a well with a submersible pump, steel below ground water storage tank, and distribution system with 7 points of use. This system is classified as a Transient Non-Community Public water system. The water system is in poor condition. The well needs pump controls, treatment system, and pump house are not functioning properly, are not compliant with codes and require replacement. The distribution system has numerous leaks, is in poor condition and requires replacement. The existing hydrants are not accessible and require upgrades. The stick-built pumphouse building is in poor condition and has inadequate lighting and inadequate ventilation.
From Solicitation posted on Mar 03, 2026NOTICE OF AWARD - PACTOLA LOOP B RECONSTRUCTION PROJECT This notification is being issued to inform contractors that the Pactola Loop B Reconstruction Project (Solicitation #: 1240LT26Q0010 / Contract #: 1240LT26C0005) was awarded on April 14, 2026. Eight (8) contractors responded to the Solicitation. The awarded contractor was Quality Driven Service LLC with an overall bid of $1,306,702.50.
From Award Notice posted on Apr 15, 2026Notice history
6-
-
Award Notice LATEST Posted Apr 15, 2026
Details
Award Information
Award Notices
Posted: Apr 15, 2026
NOTICE OF AWARD - PACTOLA LOOP B RECONSTRUCTION PROJECT This notification is being issued to inform contractors that the Pactola Loop B Reconstruction Project (Solicitation #: 1240LT26Q0010 / Contract #: 1240LT26C0005) was awarded on April 14, 2026. Eight (8) contractors responded to the Solicitatio...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| QUALITY DRIVEN SERVICE LLC | N/A | N/A | Box Elder, SD |
Contacts
Agency
Place of Performance
USA