Description
Electrical distribution system upgrades at Gosport Substation involve replacing and increasing the capacity of primary power transformers and distribution switchgear, linking to existing Main Site feeders to raise total system capacity to 168 MVA with three primary transformers, and modernizing the SCADA system. The project also includes replacing and upgrading the Gosport Industrial Transformers, circuit breakers, and relay control house (work to be performed by others), installing a climate-controlled stainless-steel switchgear house on an elevated platform at the Gosport Tie Station with new SCADA controls, and connecting primary feeders to a Backbone Ductbank. Demolition of two substation facilities (Buildings 1532 and 1702) and two microtunnel railroad crossings for electrical ductbanks are planned.
An Industry Day is planned for P732, with an industry flyer and questions to be discussed; the sources sought notices require respondents to read the full notice and answer a PLA questionnaire with yes/no responses and explanations. The two MILCON notices present the same scope, indicating no reported changes between them beyond the industry day activity.
Please P732 Industry Day Flyer and P732 Industry Day Questions.
From Special Notice posted on Jun 03, 2025This project replaces primary power service transformers, primary power service distribution switchgear, and connects to existing feeders on Main Site distribution. Increases total system capacity to 168 MVA with three primary transformers. Modernizes the existing electric supervisory control and data acquisition (SCADA) system. Specifics include: 1. Replaces and increases the capacity of the existing Dominion Gosport Industrial Transformers, circuit breakers, and relay control house with new SO transformers, circuit breakers, and relay control house (WORK BY OTHERS). 2. Replaces and increases the capacity of the Gosport Tie Station switchgear with a climate controlled, preengineered stainless-steel switchgear house on a new elevated platform. Provides new SCADA controls. 3. Connecting Primary feeders to Backbone Ductbank. 4. Demolition of Building 1532, a 53 m2 switch/substation facility; and Building 1702, a 155 m2 switch/substation facility. 5. Two microtunnel railroad crossings for electrical ductbanks. PLEASE READ FULL SOURCES SOUGHT NOTICE. PROVIDE CLEAR YES AND NO ANWERS ALONG WITH ANY ADDITIONAL EXPLANATION ANSWERING THE QUESTIONS ON THE PLA QUESTIONAIRE.
From Sources Sought posted on Jul 24, 2025This project replaces primary power service transformers, primary power service distribution switchgear, and connects to existing feeders on Main Site distribution. Increases total system capacity to 168 MVA with three primary transformers. Modernizes the existing electric supervisory control and data acquisition (SCADA) system. Specifics include: 1. Replaces and increases the capacity of the existing Dominion Gosport Industrial Transformers, circuit breakers, and relay control house with new SO transformers, circuit breakers, and relay control house (WORK BY OTHERS). 2. Replaces and increases the capacity of the Gosport Tie Station switchgear with a climate controlled, preengineered stainless-steel switchgear house on a new elevated platform. Provides new SCADA controls. 3. Connecting Primary feeders to Backbone Ductbank. 4. Demolition of Building 1532, a 53 m2 switch/substation facility; and Building 1702, a 155 m2 switch/substation facility. 5. Two microtunnel railroad crossings for electrical ductbanks. PLEASE READ FULL SOURCES SOUGHT NOTICE. PROVIDE CLEAR YES AND NO ANWERS ALONG WITH ANY ADDITIONAL EXPLANATION ANSWERING THE QUESTIONS ON THE PLA QUESTIONAIRE.
From Sources Sought posted on Jul 28, 2025THIS IS AN UPDATED SOURCES SOUGHT NOTICE. PLEASE READ THE FULL SOURCES SOUGHT NOTICE. YOU WILL UTILIZE ALL DOCUMENTS IN THIS SOURCES SOUGHT NOTICE. PROVIDE CLEAR YES AND NO ANWERS ALONG WITH ANY ADDITIONAL EXPLANATION ANSWERING THE QUESTIONS ON THE PLA QUESTIONAIRE. YOU WILL BE CONSIDERED NON-RESPONSIVE IF FORMS ARE NOT COMPLETELY FILLED OUT AND ANSWERED. This project replaces primary power service transformers, primary power service distribution switchgear, and connects to existing feeders on Main Site distribution. Increases total system capacity to 168 MVA with three primary transformers. Modernizes the existing electric supervisory control and data acquisition (SCADA) system. Specifics include: Replaces and increases the capacity of the existing Dominion Gosport Industrial Transformers, circuit breakers, and relay control house with new SO transformers, circuit breakers, and relay control house (WORK BY OTHERS). Replaces and increases the capacity of the Gosport Tie Station switchgear with a climate controlled, pre-engineered stainless-steel switchgear house on a new elevated platform. Provides new SCADA controls. Connecting Primary feeders to Backbone Ductbank. Demolition of Building 1532, a 53 m2 switch/substation facility; and Building 1702, a 155 m2 switch/substation facility. Two microtunnel railroad crossings for electrical ductbanks. PLEASE READ THE FULL SOURCES SOUGHT NOTICE. YOU WILL UTILIZE ALL DOCUMENTS IN THIS SOURCES SOUGHT NOTICE. PROVIDE CLEAR YES AND NO ANWERS ALONG WITH ANY ADDITIONAL EXPLANATION ANSWERING THE QUESTIONS ON THE PLA QUESTIONAIRE. YOU WILL BE CONSIDERED NON-RESPONSIVE IF FORMS ARE NOT COMPLETELY FILLED OUT AND ANSWERED.
From Sources Sought posted on Sep 26, 2025Award Information
Not yet awarded
Notice Timeline
Special Notice
Jun 03, 2025
Sources Sought
Jul 24, 2025
View changes (5)- Title: P732 Industry Day Event for Electrical Distribution System Upgrades Norfolk Naval Shipyard, Portsmouth Virginia → Military Construction Project (MILCON) P732 Design-Bid-Build, Electrical Distribution System Upgrades (Gosport Substation Only) at Norfolk Naval Shipyard (NNSY) in Portsmouth, Virginia.
- Description: Description was updated
- Notice Type: Special Notice → Sources Sought
- Response Deadline: Jun 20, 2025 → Aug 08, 2025
- Set-Aside: None → No Set aside used
Sources Sought
Jul 28, 2025
No changes from previous noticeSources Sought
Sep 26, 2025
View changes (2)- Description: Description was updated
- Response Deadline: Aug 08, 2025 → Oct 10, 2025