Open & Inspect for SRC Remote Interface Controllers and Filter Alignment Test Fixture N4215826QB511
Summary
AI-generated · Feb 07, 2026Open and inspect two SRC Remote Interface Controllers (serials 0001 and 0002) and two Filter Alignment Test Fixtures (P/N 576056, serials 002 and 003) used in the overhaul of F-1542 band-pass filters for surface craft communications at Norfolk Naval Shipyard. Units are not in proper working order: when powered in the test bed, the fixture gears begin to rotate but exceed the limit switches, risking damage to the filter, and the SRCs are unresponsive and do not communicate correctly with the filter. The contractor will assess condition through an open-and-inspect to determine repairs or component replacements needed to restore proper operation and communication for frequency alignment testing.
Norfolk Naval Shipyard (NNSY) overhauls the F-1542 band pass filters for all surface craft communication systems. This overhaul involves alignment of frequencies which requires the use of filter alignment test fixture (P/N: 576056). The SRC remote interface controller is also used as a part of this process to allow for the coupler to test for remote control which is a requirement onboard the ships. NNSY owns two test fixtures, serial numbers 002 and 003, and two SRC Remote Interface Controllers serial number 0001, and 0002. NNSY requires an open and inspection because none of the units are in proper working order. When a filter is placed in the test bed and power is turned on, the gears start turning but then go beyond the limit switches which causes severe damage to the filter. The SRC is unresponsive and not communicating correctly with the filter.
From Combined Synopsis/Solicitation posted on Feb 06, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA