Contacts, documents and full notice history are available with a subscription.
Sources Sought NONE Expired 1 notice

Oldmans Dredged Material Placement Facility Dike Raising Construction W912BU26B1ASK

Solicitation W912BU26B1ASK Copied Notice ID e02cbfbae71d4bfcb941eb04d0f20f57 Copied DEPT OF DEFENSE — W2SD ENDIST PHILADELPHIA
SAM.gov
Posted
Oct 07, 2025
Deadline
Oct 22, 2025
Set-aside
NONE
NAICS
237990
PSC
Y1KF

Summary

AI-generated · Oct 09, 2025

Raising the dike at the Oldmans Dredged Material Placement Facility requires a large-scale earthwork effort: about 12,000 linear feet of earthen embankments and the movement of roughly 500,000 cubic yards of dredged material within a 290-acre site along the Delaware River in Salem County, NJ. The work must be completed in about 550 calendar days (roughly 18 months) and will rely on substantial access to heavy earthmoving equipment and labor. Soils are predominantly fine-grained silts and clays with some sand and gravel and are highly moisture-sensitive, requiring active moisture conditioning and careful control to meet compaction requirements. Expect challenges such as seepage into excavations, softening of subgrades, and loss of shear strength, with mitigation through moisture management, disking, stockpiling, aeration, drainage control, limited construction traffic, and drying days; exposed subgrades must be protected. The government will provide three steel sluice structures and 30-inch drainage outfall pipes as Government Furnished Materials, and a licensed Geotechnical Engineer will be required to evaluate geotechnical data and assist in bid documents and work plans.

This Sources Sought/RFI is for market research to determine competition and capability; there is no solicitation yet. The project is estimated to be between $10 million and $25 million. Respondents should indicate capability to perform this work, including subcontracting plans, past relevant experience (within the last 10 years), bonding capacity, and interest in submitting a proposal. The government is seeking information from qualified firms to assess whether there is adequate competition and to inform a potential future procurement.

REQUEST FOR INFORMATION THIS IS A REQUEST FOR INFORMATION (RFI)/SOURCES SOUGHT NOTICE BEING RELEASED PURSUANT TO FEDERAL ACQUISITION REGULATION (FAR) PART 10: MARKET RESEARCH. This RFI is issued solely for informational, market research, and planning purposes only. It does not constitute an Invitation for Bid (IFB), Request for Quote (RFQ), or Request for Proposal (RFP) or a promise to issue an RFQ/IFB/RFP in the future. No solicitation document exists at this time. Issuance of this notice does not constitute any obligation on the part of the Government and is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. In addition, respondents are advised that the United States Government is under no obligation to pay for any information or administrative cost incurred in response to this RFI. At this time, proprietary information is not being requested, and respondents shall refrain from providing proprietary information in response to this RFI. The specifications for this requirement will only be available upon solicitation issuance. Requirement: The U.S. Army Corps of Engineer (USACE), Philadelphia District (NAP), anticipates a requirement for Oldmans Dredged Material Placement Facility Dike Raising Construction project. The estimated magnitude of this project is between $10,000,000 and $25,000,000. Description: Contract work consists of a large-scale earthwork project to construct approximately 12,000 linear feet of earthen embankments at the Oldmans Dredged Material Placement Facility (DMPF) adjacent to the Delaware River in Salem County, NJ. Approximately 500,000 cubic yards of dredged materials must be moved from within the approximately 290-acre site, compacted in lifts and final graded to meet the lines and grades required. Significant experience and expertise with large scale earthwork projects and access to a significant amount of earthmoving equipment and labor will be required to complete all work within an 18-month period of performance. The soils that comprise the available dredged materials are predominately fine-grained in nature (i.e., contain silts and clays of low and high plasticity), with some sand and gravel in limited areas. As such, these soils are highly susceptible to changes in moisture content which may limit construction activities during periods of wet or freezing weather. Contractor must be able to deal with problems that include seepage of water into excavations, softening of exposed subgrade soils, loss of soil shear strength, etc. It is anticipated that the existing dredged material proposed to construct the dikes will require consistent and active moisture conditioning to achieve a moisture content near or at optimum to achieve the specified compaction requirements. Consequently, prudent earthwork techniques such as disking, stockpile management, aeration, promoting positive drainage, limiting construction traffic and allowing for drying days must be utilized to facilitate fill placement and compaction activities. It should be anticipated that protection of exposed excavation subgrades will need to be exercised to minimize disturbance. The contract documents will include available date from the latest subsurface investigations and associated geotechnical laboratory testing. A licensed Geotechnical Engineer will be required for the evaluation of this data and assistance in preparation of bid documents as well as work plans that will be required of the successful bidder. The work will also require the installation of three steel sluice structures and associated 30-inch steel outfall pipes for site drainage. The sluice structures and pipes will be provided as Government Furnished Materials The estimated period of performance will be 550 calendar days. The anticipated North American Industrial Classification System (NAICS) code is 237990, Other Heavy and Civil Engineering Construction, with a SBA Size standard of $45.0M. The Product Service Code (PSC) is Y1KF - Construction of Dredging Facilities. Survey: The Government is issuing this notice to determine a competitive basis. This is not a solicitation and the items listed herein are subject to change or eliminated from the requirement. This survey is for market research purposes only. Only prospective contractors capable of performing this type of work should respond to this Request for Information. Your response to this survey is requested by 2:00 PM Eastern Time, October 22, 2025. Please send by email to Eric Leach at Eric.A.Leach@usace.army.mil and Connor Struckmeyer at Connor.A.Struckmeyer@usace.army.mil. Include in the title "Sources Sought - Oldmans Dredged Material Placement Facility Dike Raising Construction as the subject line in email communications. All submitted responses must be in either Microsoft Word or Adobe pdf format. 1. Name of your firm: 2. CAGE/Unique Entity Identifier: 3. Point of Contact, Phone Number, and E-mail Address: 4. List three (3) projects completed within ten (10) years of the date of this notice that demonstrates experience, as a prime contractor or subcontractor, related to the type of construction provided in the description above. Project 1 Project Name: Contract Number (if applicable) Year Completed Was the project completed on time? Prime or Subcontractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General description of project: Project 2 Project Name: Contract Number (if applicable) Year Completed Was the project completed on time? Prime or Subcontractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General description of project: Project 3 Project Name: Contract Number (if applicable) Year Completed Was the project completed on time? Prime or Subcontractor: Type and percentage of work self-performed (based on contract value): Dollar Amount: General description of project: 5. Are you a Small Business classified under the above NAICS code? If so, do you fall into a sub-category (e.g. HubZone, 8(a), SDVOSB, WOSB, etc.)? 6. For this requirement, what percentage of this work would you subcontract (reference FAR 52.219-14, Limitations on Subcontracting? 7. What type of work requirements will you subcontract out to small businesses? 8. Do you plan to subcontract to only small businesses? 9. If the answer to question 8 is yes , are these small businesses with a sub-category (e.g. e.g. HubZone, 8(a), SDVOSB, WOSB, etc.) 10. What is your bonding capacity per contract? 11. What is your aggregate bonding capacity per contract? 12. If this requirement is advertised, do you anticipate submitting a proposal?

From Sources Sought posted on Oct 07, 2025

Notice history

1
  1. Sources Sought LATEST Posted Oct 07, 2025 View

Details

Solicitation number W912BU26B1ASK
Notice ID e02cbfbae71d4bfcb941eb04d0f20f57
Notice type Sources Sought
Product / Service (PSC) Y1KF
NAICS 237990
Set-aside No Set aside used
Place of performance Pedricktown, New Jersey
Archive date Nov 06, 2025

Award Information

Not yet awarded

Documents

No files available

View on SAM.gov

Contacts

primary
Eric Leach

Email

secondary
Connor Struckmeyer

Email

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION NORTH ATLANTIC
W2SD ENDIST PHILADELPHIA

Place of Performance

Pedricktown, New Jersey 08067
USA

Dates

Posted Oct 07, 2025 10 months ago
Last Updated Aug 06, 2026 1 day ago
Due Oct 22, 2025 9 months ago