Ogden-Hinckley Airport (OGD) Air Traffic Control Tower (ATCT) Design-Build 697DCK-25-R-00437
Summary
AI-generated · Sep 28, 2025Design and construct a new Airport Traffic Control Tower (ATCT) at Ogden-Hinckley Airport (OGD) in Ogden, Utah. The contractor must provide all labor, materials, services, equipment, insurance, security notifications, licenses, permits, and fees required to complete the project, in full compliance with the solicitation’s specifications, drawings, contract clauses, and wage rates. A final NEPA review has not been conducted, and a Notice to Proceed will not be issued until a favorable NEPA finding is obtained for the site.
Access to the FAA’s KSN Site is required to download all Section J attachments, which are too large to email. Interested bidders must request KSN access and provide a KSN POC (name, phone, and email) with their request; only one KSN POC per offeror.
***A FINAL NEPA REVIEW HAS NOT BEEN CONDUCTED. NTP (Notice to proceed) will not be issued until we have a favorable NEPA finding for this site.*** Contractor shall furnish all labor, materials, services, equipment, insurance, security notifications, licenses, permits, and fees in accordance with applicable Federal, State, and local regulatory requirements to DESIGN AND BUILD A NEW AIRPORT TRAFFIC CONTROL TOWER (ATCT) FACILITIES OGDEN-HINCKLEY AIRPORT (OGD) IN OGDEN, UTAH. All work shall be in accordance with the specifications, drawings, contract clauses, and wage rates, as described in this Solicitation Due to their file sizes (as they are too large to transmit via email) interested offeror's must email both (Rodgers.L.Cox@faa.gov) and (Sam.G.Culberth@faa.gov) to request access to the FAA's KSN Site to download all Section J Attachments. Please provide name, phone #, and email address for this KSN P.O.C. (limit one KSN P.O.C. per perspective offeror).
From Solicitation posted on Sep 26, 2025***A FINAL NEPA REVIEW HAS NOT BEEN CONDUCTED. NTP (Notice to proceed) will not be issued until we have a favorable NEPA finding for this site.*** Contractor shall furnish all labor, materials, services, equipment, insurance, security notifications, licenses, permits, and fees in accordance with applicable Federal, State, and local regulatory requirements to DESIGN AND BUILD A NEW AIRPORT TRAFFIC CONTROL TOWER (ATCT) FACILITIES OGDEN-HINCKLEY AIRPORT (OGD) IN OGDEN, UTAH. All work shall be in accordance with the specifications, drawings, contract clauses, and wage rates, as described in this Solicitation Due to their file sizes (as they are too large to transmit via email) interested offeror's must email both (Rodgers.L.Cox@faa.gov) and (Sam.G.Culberth@faa.gov) to request access to the FAA's KSN Site to download all Section J Attachments. Please provide name, phone #, and email address for this KSN P.O.C. (limit one KSN P.O.C. per perspective offeror).
From Solicitation posted on Oct 01, 2025***A FINAL NEPA REVIEW HAS NOT BEEN CONDUCTED. NTP (Notice to proceed) will not be issued until we have a favorable NEPA finding for this site.*** Contractor shall furnish all labor, materials, services, equipment, insurance, security notifications, licenses, permits, and fees in accordance with applicable Federal, State, and local regulatory requirements to DESIGN AND BUILD A NEW AIRPORT TRAFFIC CONTROL TOWER (ATCT) FACILITIES OGDEN-HINCKLEY AIRPORT (OGD) IN OGDEN, UTAH. All work shall be in accordance with the specifications, drawings, contract clauses, and wage rates, as described in this Solicitation Due to their file sizes (as they are too large to transmit via email) interested offeror's must email both (Rodgers.L.Cox@faa.gov) and (Sam.G.Culberth@faa.gov) to request access to the FAA's KSN Site to download all Section J Attachments. Please provide name, phone #, and email address for this KSN P.O.C. (limit one KSN P.O.C. per perspective offeror).
From Solicitation posted on Oct 17, 2025*Amendment 1 to solicitation 697DCK-25-R-00437 was issued on October 17, 2025. The purpose of amendment 1 is to update past performance criteria, incorporate questions and answers, and add attachment 1 and attachment 13 to section J. All other terms and conditions remain unchanged. See Amendment 1 for all changes. -------------------------------------------------------------------------------------------------------------------------------- ***A FINAL NEPA REVIEW HAS NOT BEEN CONDUCTED. NTP (Notice to proceed) will not be issued until we have a favorable NEPA finding for this site.*** Contractor shall furnish all labor, materials, services, equipment, insurance, security notifications, licenses, permits, and fees in accordance with applicable Federal, State, and local regulatory requirements to DESIGN AND BUILD A NEW AIRPORT TRAFFIC CONTROL TOWER (ATCT) FACILITIES OGDEN-HINCKLEY AIRPORT (OGD) IN OGDEN, UTAH. All work shall be in accordance with the specifications, drawings, contract clauses, and wage rates, as described in this Solicitation Due to their file sizes (as they are too large to transmit via email) interested offeror's must email both (Rodgers.L.Cox@faa.gov) and (Sam.G.Culberth@faa.gov) to request access to the FAA's KSN Site to download all Section J Attachments. Please provide name, phone #, and email address for this KSN P.O.C. (limit one KSN P.O.C. per perspective offeror).
From Solicitation posted on Oct 22, 2025*Amendment 2 to solicitation 697DCK-25-R-00437 was issued on November 3, 2025. The purpose of amendment 2 is to extend the proposal due date to November 14, 2025 no later than 1700 ET. This amendment will also incorporate questions and answers 2. All other terms and conditions remain unchanged. See Amendment 2 for all changes --------------------------------------------------------------------------------------------------------------------------------- *Amendment 1 to solicitation 697DCK-25-R-00437 was issued on October 17, 2025. The purpose of amendment 1 is to update past performance criteria, incorporate questions and answers, and add attachment 1 and attachment 13 to section J. All other terms and conditions remain unchanged. See Amendment 1 for all changes. -------------------------------------------------------------------------------------------------------------------------------- ***A FINAL NEPA REVIEW HAS NOT BEEN CONDUCTED. NTP (Notice to proceed) will not be issued until we have a favorable NEPA finding for this site.*** Contractor shall furnish all labor, materials, services, equipment, insurance, security notifications, licenses, permits, and fees in accordance with applicable Federal, State, and local regulatory requirements to DESIGN AND BUILD A NEW AIRPORT TRAFFIC CONTROL TOWER (ATCT) FACILITIES OGDEN-HINCKLEY AIRPORT (OGD) IN OGDEN, UTAH. All work shall be in accordance with the specifications, drawings, contract clauses, and wage rates, as described in this Solicitation Due to their file sizes (as they are too large to transmit via email) interested offeror's must email both (Rodgers.L.Cox@faa.gov) and (Sam.G.Culberth@faa.gov) to request access to the FAA's KSN Site to download all Section J Attachments. Please provide name, phone #, and email address for this KSN P.O.C. (limit one KSN P.O.C. per perspective offeror).
From Solicitation posted on Nov 03, 2025*Amendment 3 to solicitation 697DCK-25-R-00437 was issued on November 6, 2025. The purpose of amendment 3 is to incorporate questions and answers 3. All other terms and conditions remain unchanged. See Amendment 3 for all changes ------------------------------------------------------------------------------------------------------------------------------- *Amendment 2 to solicitation 697DCK-25-R-00437 was issued on November 3, 2025. The purpose of amendment 2 is to extend the proposal due date to November 14, 2025 no later than 1700 ET. This amendment will also incorporate questions and answers 2. All other terms and conditions remain unchanged. See Amendment 2 for all changes --------------------------------------------------------------------------------------------------------------------------------- *Amendment 1 to solicitation 697DCK-25-R-00437 was issued on October 17, 2025. The purpose of amendment 1 is to update past performance criteria, incorporate questions and answers, and add attachment 1 and attachment 13 to section J. All other terms and conditions remain unchanged. See Amendment 1 for all changes. -------------------------------------------------------------------------------------------------------------------------------- ***A FINAL NEPA REVIEW HAS NOT BEEN CONDUCTED. NTP (Notice to proceed) will not be issued until we have a favorable NEPA finding for this site.*** Contractor shall furnish all labor, materials, services, equipment, insurance, security notifications, licenses, permits, and fees in accordance with applicable Federal, State, and local regulatory requirements to DESIGN AND BUILD A NEW AIRPORT TRAFFIC CONTROL TOWER (ATCT) FACILITIES OGDEN-HINCKLEY AIRPORT (OGD) IN OGDEN, UTAH. All work shall be in accordance with the specifications, drawings, contract clauses, and wage rates, as described in this Solicitation Due to their file sizes (as they are too large to transmit via email) interested offeror's must email both (Rodgers.L.Cox@faa.gov) and (Sam.G.Culberth@faa.gov) to request access to the FAA's KSN Site to download all Section J Attachments. Please provide name, phone #, and email address for this KSN P.O.C. (limit one KSN P.O.C. per perspective offeror).
From Solicitation posted on Nov 06, 2025Notice history
6-
-
Solicitation Posted Oct 01, 2025No changes from previous notice
-
Solicitation Posted Oct 17, 2025No changes from previous notice
-
Solicitation Posted Nov 03, 2025View changes (2)
- Description: Description was updated
- Response Deadline: Nov 06, 2025 → Nov 14, 2025
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA