Office Repairs for Hastings, MN W912ES26QA030
Summary
AI-generated · Feb 19, 2026Repair and restore flood-damaged spaces at the Hastings Resident Office building at Lock and Dam 2 in Hastings, MN, caused by a frozen and burst copper water pipe. The contractor will remove and replace all damaged materials as indicated (including wall base molding, drywall, wall and above-ceiling insulation, vapor barrier, bathroom wall tiles, stained carpet sections, ceiling tiles, and LED light panels). Replaced materials must match existing undamaged material or be approved by the Contracting Officer. The scope also includes repairing the burst pipe, reconnecting kitchenette plumbing (including the hot water heater), repainting affected areas, remounting electrical conduit and fire alarm annunciators, and testing the fire alarm to ensure functionality.
Additional work includes remounting and testing systems affected by the flood, steam cleaning the carpet, applying epoxy flooring with non-slip grip in the server room, and conducting mold air sampling before and after the repairs. All work is to be performed as described in the solicitation, with materials subject to CO approval if substitutions are requested.
The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a ?? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wall base molding, drywall, wall and above ceiling insulation (foam, batt, R-13 and R-19 fiberglass), water vapor barrier, bathroom wall tiles, stained carpet sections, ceiling tiles, and LED light panels. All replaced materials shall match existing material that was not damaged or otherwise approved by the Contracting Officer. Other work includes repairing the burst section of water pipe, reconnecting plumbing fixtures for the kitchenette to include hot water heater, painting new sheetrock as well as any damaged areas (walls, around floor molding, and along electrical conduit), remounting electrical conduit and fire alarm annunciators, testing the fire alarm system to validate functionality, remount fire extinguisher, steam cleaning the carpet, applying epoxy floor with non-slip grip in server room, and conducting air sampling mold testing before and after repairs.
From Presolicitation posted on Feb 18, 2026The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a ?? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wall base molding, drywall, wall and above ceiling insulation (foam, batt, R-13 and R-19 fiberglass), water vapor barrier, bathroom wall tiles, stained carpet sections, ceiling tiles, and LED light panels. All replaced materials shall match existing material that was not damaged or otherwise approved by the Contracting Officer. Other work includes repairing the burst section of water pipe, reconnecting plumbing fixtures for the kitchenette to include hot water heater, painting new sheetrock as well as any damaged areas (walls, around floor molding, and along electrical conduit), remounting electrical conduit and fire alarm annunciators, testing the fire alarm system to validate functionality, remount fire extinguisher, steam cleaning the carpet, applying epoxy floor with non-slip grip in server room, and conducting air sampling mold testing before and after repairs.
From Solicitation posted on Feb 19, 2026Posted Amendment 0001, new site visit date 12 March 2026 (see attached for details) The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a ?? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wall base molding, drywall, wall and above ceiling insulation (foam, batt, R-13 and R-19 fiberglass), water vapor barrier, bathroom wall tiles, stained carpet sections, ceiling tiles, and LED light panels. All replaced materials shall match existing material that was not damaged or otherwise approved by the Contracting Officer. Other work includes repairing the burst section of water pipe, reconnecting plumbing fixtures for the kitchenette to include hot water heater, painting new sheetrock as well as any damaged areas (walls, around floor molding, and along electrical conduit), remounting electrical conduit and fire alarm annunciators, testing the fire alarm system to validate functionality, remount fire extinguisher, steam cleaning the carpet, applying epoxy floor with non-slip grip in server room, and conducting air sampling mold testing before and after repairs.
From Solicitation posted on Mar 04, 2026The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a ?? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wall base molding, drywall, wall and above ceiling insulation (foam, batt, R-13 and R-19 fiberglass), water vapor barrier, bathroom wall tiles, stained carpet sections, ceiling tiles, and LED light panels. All replaced materials shall match existing material that was not damaged or otherwise approved by the Contracting Officer. Other work includes repairing the burst section of water pipe, reconnecting plumbing fixtures for the kitchenette to include hot water heater, painting new sheetrock as well as any damaged areas (walls, around floor molding, and along electrical conduit), remounting electrical conduit and fire alarm annunciators, testing the fire alarm system to validate functionality, remount fire extinguisher, steam cleaning the carpet, applying epoxy floor with non-slip grip in server room, and conducting air sampling mold testing before and after repairs.
From Award Notice posted on Mar 31, 2026Notice history
4-
Presolicitation Posted Feb 18, 2026
-
Solicitation Posted Feb 19, 2026View changes (2)
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Not set → Mar 06, 2026
-
Solicitation Posted Mar 04, 2026View changes (2)
- Description: Description was updated
- Response Deadline: Mar 06, 2026 → Mar 19, 2026
-
Award Notice LATEST Posted Mar 31, 2026
Details
Award Information
Award Notices
Posted: Mar 31, 2026
The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a ?? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wa...
Awardees
| Company Name | UEI | CAGE Code | Location |
|---|---|---|---|
| TIER 1 MANAGEMENT LLC | CZRJHM84LXZ9 | 9NK03 | UNION, NJ |