Office Repairs for Hastings, MN W912ES26QA030

Solicitation W912ES26QA030 Copied Notice ID 8054c23993c94ff69f48aa4b05fc4d03 Copied DEPT OF DEFENSE — W07V ENDIST ST PAUL
SAM.gov
Posted
Feb 18, 2026
Deadline
No deadline
Set-aside
SBA
NAICS
238310
PSC
Z2AA

Summary

AI-generated · Feb 19, 2026

Repair and restore flood-damaged spaces at the Hastings Resident Office building at Lock and Dam 2 in Hastings, MN, caused by a frozen and burst copper water pipe. The contractor will remove and replace all damaged materials as indicated (including wall base molding, drywall, wall and above-ceiling insulation, vapor barrier, bathroom wall tiles, stained carpet sections, ceiling tiles, and LED light panels). Replaced materials must match existing undamaged material or be approved by the Contracting Officer. The scope also includes repairing the burst pipe, reconnecting kitchenette plumbing (including the hot water heater), repainting affected areas, remounting electrical conduit and fire alarm annunciators, and testing the fire alarm to ensure functionality.

Additional work includes remounting and testing systems affected by the flood, steam cleaning the carpet, applying epoxy flooring with non-slip grip in the server room, and conducting mold air sampling before and after the repairs. All work is to be performed as described in the solicitation, with materials subject to CO approval if substitutions are requested.

The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a ?? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wall base molding, drywall, wall and above ceiling insulation (foam, batt, R-13 and R-19 fiberglass), water vapor barrier, bathroom wall tiles, stained carpet sections, ceiling tiles, and LED light panels. All replaced materials shall match existing material that was not damaged or otherwise approved by the Contracting Officer. Other work includes repairing the burst section of water pipe, reconnecting plumbing fixtures for the kitchenette to include hot water heater, painting new sheetrock as well as any damaged areas (walls, around floor molding, and along electrical conduit), remounting electrical conduit and fire alarm annunciators, testing the fire alarm system to validate functionality, remount fire extinguisher, steam cleaning the carpet, applying epoxy floor with non-slip grip in server room, and conducting air sampling mold testing before and after repairs.

From Presolicitation posted on Feb 18, 2026

The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a ?? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wall base molding, drywall, wall and above ceiling insulation (foam, batt, R-13 and R-19 fiberglass), water vapor barrier, bathroom wall tiles, stained carpet sections, ceiling tiles, and LED light panels. All replaced materials shall match existing material that was not damaged or otherwise approved by the Contracting Officer. Other work includes repairing the burst section of water pipe, reconnecting plumbing fixtures for the kitchenette to include hot water heater, painting new sheetrock as well as any damaged areas (walls, around floor molding, and along electrical conduit), remounting electrical conduit and fire alarm annunciators, testing the fire alarm system to validate functionality, remount fire extinguisher, steam cleaning the carpet, applying epoxy floor with non-slip grip in server room, and conducting air sampling mold testing before and after repairs.

From Solicitation posted on Feb 19, 2026

Posted Amendment 0001, new site visit date 12 March 2026 (see attached for details) The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a ?? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wall base molding, drywall, wall and above ceiling insulation (foam, batt, R-13 and R-19 fiberglass), water vapor barrier, bathroom wall tiles, stained carpet sections, ceiling tiles, and LED light panels. All replaced materials shall match existing material that was not damaged or otherwise approved by the Contracting Officer. Other work includes repairing the burst section of water pipe, reconnecting plumbing fixtures for the kitchenette to include hot water heater, painting new sheetrock as well as any damaged areas (walls, around floor molding, and along electrical conduit), remounting electrical conduit and fire alarm annunciators, testing the fire alarm system to validate functionality, remount fire extinguisher, steam cleaning the carpet, applying epoxy floor with non-slip grip in server room, and conducting air sampling mold testing before and after repairs.

From Solicitation posted on Mar 04, 2026

The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a ?? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wall base molding, drywall, wall and above ceiling insulation (foam, batt, R-13 and R-19 fiberglass), water vapor barrier, bathroom wall tiles, stained carpet sections, ceiling tiles, and LED light panels. All replaced materials shall match existing material that was not damaged or otherwise approved by the Contracting Officer. Other work includes repairing the burst section of water pipe, reconnecting plumbing fixtures for the kitchenette to include hot water heater, painting new sheetrock as well as any damaged areas (walls, around floor molding, and along electrical conduit), remounting electrical conduit and fire alarm annunciators, testing the fire alarm system to validate functionality, remount fire extinguisher, steam cleaning the carpet, applying epoxy floor with non-slip grip in server room, and conducting air sampling mold testing before and after repairs.

From Award Notice posted on Mar 31, 2026

Notice history

4
  1. Presolicitation Posted Feb 18, 2026
  2. Solicitation Posted Feb 19, 2026
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Not setMar 06, 2026
  3. Solicitation Posted Mar 04, 2026
    • Description: Description was updated
    • Response Deadline: Mar 06, 2026Mar 19, 2026
  4. Award Notice LATEST Posted Mar 31, 2026

Details

Solicitation number W912ES26QA030
Notice ID 8054c23993c94ff69f48aa4b05fc4d03
Award number W912ES26PA055
Notice type Presolicitation
Product / Service (PSC) Z2AA
NAICS 238310
Archive date Feb 24, 2026

Award Information

Awardee
1
Total Awarded
$21,900.00
Award Date
Mar 26, 2026

Award Notices

Office Repairs for Hastings, MN View Notice

Posted: Mar 31, 2026

The Hastings Resident Office building at Lock and Dam 2 in Hastings, MN experienced flood damage caused by a ?? copper water pipe which froze and burst. The Contractor shall remove and replace all damaged material as indicated in paragraph 2.3. Damaged material includes, but is not limited to, 4? wa...

Awardees

Company Name UEI CAGE Code Location
TIER 1 MANAGEMENT LLC CZRJHM84LXZ9 9NK03 UNION, NJ

Documents

No files available

View on SAM.gov

Contacts

primary
Justin Rose

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION MISSISSIPPI VALLEY
ENDIST ST PAUL
W07V ENDIST ST PAUL

Place of Performance

55033

Dates

Posted Feb 18, 2026 5 months ago
Last Updated Aug 06, 2026 2 days ago