Office Refurbishment 1301312954
Summary
AI-generated · Mar 10, 2026Office refurbishment including removal and installation of office furniture and painting. Competition will be limited to three vendors who attended a scheduled site visit.
Oral solicitations may be used for acquisitions up to $350,000, and the contracting officer may choose an oral solicitation instead of a posted solicitation for requirements with an Independent Government Estimate between $20,000 and $350,000 if it is determined to be more efficient than electronic methods, as supported by a recent GAO decision.
Office Furniture removal and installation, and painting. The Government intents is to solicit to three (3) vendors that attended a site visit scheduled by the requesting office. FAR 12.203(a) makes it clear that there is a ceiling of $350,000.00 (SAT) for oral solicitations. FAR 5.101(a)(2)(ii) makes it clear it is not needed to solicit when oral solicitations are used. Based on how the GAO interpreted both provisions in Matter of Phoenix Env t Design, Inc., B-422950 (Dec 10. 2024), it is indeed possible that oral solicitations could potentially be used in acquisitions where the IGE was between $20,000.00 and $350,000.00, as, they indicated that 5.101(a)(2)(ii) overrode 5.101 s general rule requiring that the Contracting Officer is to post for all requirements above $20,000.00. An oral solicitation for a requirement in the $20,000.00 to $350,000.00 range depends on if the Contracting Officer can satisfy the requirement of FAR 13.106-1(c)(1)(ii) that oral solicitation is more efficient than using electronic means.
From Presolicitation posted on Mar 09, 2026Notice history
1Details
Award Information
Not yet awarded
Contacts
Phone
Agency
Place of Performance
USA