NV FLAP NYE 10(1) Bob Ruud Mem Hwy & Bell Vista Ave 6982AF26B000003
Summary
AI-generated · Apr 03, 2026Reconstruction and rehabilitation of approximately 20 miles of roadway along Bob Ruud Memorial Highway and Bell Vista Avenue in Pahrump, NV to improve safety and drainage, with access to Ash Meadows National Wildlife Refuge and Death Valley National Park. Plans and specifications are not available. The work covers roadway reconstruction, rehabilitation, paving, drainage, and safety improvements, including full-depth reclamation (4-inch depth and 8-inch depth), installation of a new aggregate base, asphalt paving, and culvert replacement (some requiring up to about 10 feet of excavation).
Major quantities include 30,000–50,000 tons of aggregate base; full-depth reclamation (4-inch) over about 22 miles; full-depth reclamation (8-inch) over about 10 miles; 65,000–80,000 tons of asphalt pavement; and 24-inch culverts totaling 1,000–2,500 linear feet.
THIS IS NOT A REQUEST FOR BID PLANS AND SPECIFICATIONS ARE NOT AVAILABLE. PROJECT NUMBER: NV FLAP NYE 10(1) PROJECT NAME: Bob Ruud Mem Hwy & Bell Vista Ave PROJECT DESCRIPTION: The Central Federal Lands Highway Division (CFLHD) intends to issue a solicitation for the reconstruction and rehabilitation of approximately 20 miles of roadway. The project begins in Pahrump at the intersection of State Highway 160 and Bell Vista Avenue and provides access to Ash Meadows National Wildlife Refuge and Death Valley National Park. The project aims to improve safety and drainage on Bob Ruud Memorial Highway and Bell Vista Avenue. Bob Ruud Memorial Highway is characterized as a typical rural highway, while Bell Vista Avenue is in a more urban setting within Pahrump, featuring multiple approach roads. SCOPE OF THE WORK: The project consists of roadway reconstruction, rehabilitation, paving, drainage, and safety improvements. Specific work includes full-depth reclamation (FDR), installation of new aggregate base, asphalt paving, and culvert replacement (with some requiring approximately 10 feet of excavation). PRINCIPAL WORK ITEMS: Major items of work include the following ranges: Aggregate Base: 30,000 - 50,000 tons Full Depth Reclamation (4-inch depth): 22 miles Full Depth Reclamation (8-inch depth): 10 miles Asphalt Pavement: 65,000 - 80,000 tons 24-inch Culvert: 1,000 - 2,500 LNFT ANTICIPATED SCHEDULE: Anticipated advertisement April 2026 with an award June 2026, and a tentative project completion of May 2027. ESTIMATED COST RANGE: Between $20,000,000 and $40,000,000
From Presolicitation posted on Apr 02, 2026PROJECT NUMBER: NV FLAP NYE 10(1) PROJECT NAME: Bob Ruud Mem Hwy & Bell Vista Ave PROJECT DESCRIPTION: The Central Federal Lands Highway Division (CFLHD) intends to issue a solicitation for the reconstruction and rehabilitation of approximately 20 miles of roadway. The project begins in Pahrump at the intersection of State Highway 160 and Bell Vista Avenue and provides access to Ash Meadows National Wildlife Refuge and Death Valley National Park. The project aims to improve safety and drainage on Bob Ruud Memorial Highway and Bell Vista Avenue. Bob Ruud Memorial Highway is characterized as a typical rural highway, while Bell Vista Avenue is in a more urban setting within Pahrump, featuring multiple approach roads. SCOPE OF THE WORK: The project consists of roadway reconstruction, rehabilitation, paving, drainage, and safety improvements. Specific work includes full-depth reclamation (FDR), installation of new aggregate base, asphalt paving, and culvert replacement (with some requiring approximately 10 feet of excavation). PRINCIPAL WORK ITEMS: Major items of work include the following ranges: Aggregate Base: 30,000 - 50,000 tons Full Depth Reclamation (4-inch depth): 22 miles Full Depth Reclamation (8-inch depth): 10 miles Asphalt Pavement: 65,000 - 80,000 tons 24-inch Culvert: 1,000 - 2,500 LNFT ANTICIPATED SCHEDULE: Anticipated advertisement May 2026 with an award June 2026, and a tentative project completion of May 2027. ESTIMATED COST RANGE: Between $20,000,000 and $40,000,000 This is a full and open competition.
From Solicitation posted on May 01, 2026PROJECT NUMBER: NV FLAP NYE 10(1) PROJECT NAME: Bob Ruud Mem Hwy & Bell Vista Ave PROJECT DESCRIPTION: The Central Federal Lands Highway Division (CFLHD) intends to issue a solicitation for the reconstruction and rehabilitation of approximately 20 miles of roadway. The project begins in Pahrump at the intersection of State Highway 160 and Bell Vista Avenue and provides access to Ash Meadows National Wildlife Refuge and Death Valley National Park. The project aims to improve safety and drainage on Bob Ruud Memorial Highway and Bell Vista Avenue. Bob Ruud Memorial Highway is characterized as a typical rural highway, while Bell Vista Avenue is in a more urban setting within Pahrump, featuring multiple approach roads. SCOPE OF THE WORK: The project consists of roadway reconstruction, rehabilitation, paving, drainage, and safety improvements. Specific work includes full-depth reclamation (FDR), installation of new aggregate base, asphalt paving, and culvert replacement (with some requiring approximately 10 feet of excavation). PRINCIPAL WORK ITEMS: Major items of work include the following ranges: Aggregate Base: 30,000 - 50,000 tons Full Depth Reclamation (4-inch depth): 22 miles Full Depth Reclamation (8-inch depth): 10 miles Asphalt Pavement: 65,000 - 80,000 tons 24-inch Culvert: 1,000 - 2,500 LNFT ANTICIPATED SCHEDULE: Anticipated advertisement May 2026 with an award June 2026, and a tentative project completion of May 2027. ESTIMATED COST RANGE: Between $20,000,000 and $40,000,000 This is a full and open competition.
From Solicitation posted on May 26, 2026PROJECT NUMBER: NV FLAP NYE 10(1) PROJECT NAME: Bob Ruud Mem Hwy & Bell Vista Ave PROJECT DESCRIPTION: The Central Federal Lands Highway Division (CFLHD) intends to issue a solicitation for the reconstruction and rehabilitation of approximately 20 miles of roadway. The project begins in Pahrump at the intersection of State Highway 160 and Bell Vista Avenue and provides access to Ash Meadows National Wildlife Refuge and Death Valley National Park. The project aims to improve safety and drainage on Bob Ruud Memorial Highway and Bell Vista Avenue. Bob Ruud Memorial Highway is characterized as a typical rural highway, while Bell Vista Avenue is in a more urban setting within Pahrump, featuring multiple approach roads. SCOPE OF THE WORK: The project consists of roadway reconstruction, rehabilitation, paving, drainage, and safety improvements. Specific work includes full-depth reclamation (FDR), installation of new aggregate base, asphalt paving, and culvert replacement (with some requiring approximately 10 feet of excavation). PRINCIPAL WORK ITEMS: Major items of work include the following ranges: Aggregate Base: 30,000 - 50,000 tons Full Depth Reclamation (4-inch depth): 22 miles Full Depth Reclamation (8-inch depth): 10 miles Asphalt Pavement: 65,000 - 80,000 tons 24-inch Culvert: 1,000 - 2,500 LNFT ANTICIPATED SCHEDULE: Anticipated advertisement May 2026 with an award June 2026, and a tentative project completion of May 2027. ESTIMATED COST RANGE: Between $20,000,000 and $40,000,000 This is a full and open competition.
From Solicitation posted on Jun 01, 2026PROJECT NUMBER: NV FLAP NYE 10(1) PROJECT NAME: Bob Ruud Mem Hwy & Bell Vista Ave PROJECT DESCRIPTION: The Central Federal Lands Highway Division (CFLHD) intends to issue a solicitation for the reconstruction and rehabilitation of approximately 20 miles of roadway. The project begins in Pahrump at the intersection of State Highway 160 and Bell Vista Avenue and provides access to Ash Meadows National Wildlife Refuge and Death Valley National Park. The project aims to improve safety and drainage on Bob Ruud Memorial Highway and Bell Vista Avenue. Bob Ruud Memorial Highway is characterized as a typical rural highway, while Bell Vista Avenue is in a more urban setting within Pahrump, featuring multiple approach roads. SCOPE OF THE WORK: The project consists of roadway reconstruction, rehabilitation, paving, drainage, and safety improvements. Specific work includes full-depth reclamation (FDR), installation of new aggregate base, asphalt paving, and culvert replacement (with some requiring approximately 10 feet of excavation). PRINCIPAL WORK ITEMS: Major items of work include the following ranges: Aggregate Base: 30,000 - 50,000 tons Full Depth Reclamation (4-inch depth): 22 miles Full Depth Reclamation (8-inch depth): 10 miles Asphalt Pavement: 65,000 - 80,000 tons 24-inch Culvert: 1,000 - 2,500 LNFT ANTICIPATED SCHEDULE: Anticipated advertisement May 2026 with an award June 2026, and a tentative project completion of May 2027. ESTIMATED COST RANGE: Between $20,000,000 and $40,000,000 This is a full and open competition.
From Solicitation posted on Jun 10, 2026Notice history
5-
Presolicitation Posted Apr 02, 2026
-
Solicitation Posted May 01, 2026View changes (3)
- Description: Description was updated
- Notice Type: Presolicitation → Solicitation
- Response Deadline: Apr 17, 2026 → Jun 02, 2026
-
Solicitation Posted Jun 01, 2026No changes from previous notice
-
Solicitation LATEST Posted Jun 10, 2026No changes from previous notice