NSN 2915-014939532, FUEL INJECTION NOZZLE, WSDC: 19F, AIRCRAFT, EAGLE F-15 SPE4A726R0392_Synopsis
Summary
AI-generated · Mar 18, 2026Fuel injection nozzle for the F-15 Eagle will be procured under a 2-year base Indefinite Quantity Contract with no option years, with an estimated 40 units required per year. A first article test is required; production deliveries are 790 days after order, with FOB destination. Production units will be inspected and accepted at origin, while the first article is inspected at origin and accepted at destination. The part is manufactured under part number 4084965-1 by RTX (Cages 55261 and 77445) and Woodward FST, Inc. (Cage 65065).
Access to the data package is restricted to DoD-certified contractors under DoD 5220.22M; certification is obtained by submitting DD Form 2345 to DLIS. The First Article Test Report is due 320 days after award, and government approval/disapproval will occur within 90 days after receipt of the FAT report, with production unit deliveries due 380 days after approval. A solicitation package will be available as a PDF on DIBBS; paper copies will not be provided.
NSN: 2915-014939532, IQC PR: 1000221730, ITEM: FUEL INJECTION NOZZLE THIS PART IS MANUFACTURED UNDER PART NUMBER 4084965-1 BY RTX (CAGES 55261 AND 77445) WOODWARD FST, INC (CAGE 65065) THE SOLICITATION WILL BE ISSUED AS AN UNRESTICTED PROCUREMENT (OTHER THAN FULL AND OPEN COMPETITION). THIS PROCUREMENT IS FOR AN INDEFINITE QUANTITY CONTRACT (IQC) FOR A BASE PERIOD OF 2 YEARS WITH ZERO (0) OPTIONS. THE ESTIMATED ANNUAL QUANTITY IS 40 EACH. DELIVERY WILL BE 790 DAYS AFTER DATE OF ORDER. INSPECTION AND ACCEPTANCE WILL TAKE PLACE AT ORIGIN. FOB IS AT DESTINATION. THIS ITEM CITED REQUIRES DATA WHICH IS RESTRICTED TO CONTRACTORS CERTIFIED BY DOD TO ACCESS UNCLASSIFIED DATA PER DOD 5220.22M. CERTIFICATION IS OBTAINED BY SUBMITTING DD FORM 2345, MILITARY CRITICAL TECHNICAL DATA AGREEMENT, TO THE DEFENSE LOGISTICS INFORMATION SERVICES. CONTRACTOR FIRST ARTICLE TESTING IS REQUIRED. DELIVERY OF THE FIRST ARTICLE TEST REPORT WILL BE 320 DAYS ARO. GOVERNMENT APPROVAL / DISAPPROVAL WILL BE 90 DAYS AFTER RECEIPT OF FIRST ARTICLE TEST REPORT. DELIVERY OF THE PRODUCTION UNITS WILL BE 380 DAYS AFTER GOVERNMENT APPROVAL. FOB IS AT DESTINATION. FIRST ARTICLE TERMS: INSPECTION AT ORIGIN, ACCEPTANCE AT DESTINATION. PRODUCTION UNIT TERMS: INSPECTION AND ACCEPTANCE AT ORIGIN. A COPY OF THE SOLICITATION WILL BE AVAILABLE VIA THE DLA INTERNET BID BOARD SYSTEM (DIBBS) AT HTTPS://WWW.DIBBS.BSM.DLA.MIL/RFP ON THE ISSUE DATE CITED IN THE SOLICITATION. FROM THE DIBBS HOMEPAGE, SELECT REQUESTS FOR PROPOSAL (RFP) / INVITATION FOR BID (IFB) FROM THE MENU UNDER THE TAB SOLICITATIONS. THEN SEARCH FOR AND CHOOSE THE RFP YOU WISH TO DOWNLOAD. SOLICITATIONS ARE IN PORTABLE DOCUMENT FORMAT (PDF). TO DOWNLOAD AND VIEW THESE DOCUMENTS YOU WILL NEED THE LATEST VERSION OF ADOBE ACROBAT READER. THIS SOFTWARE IS AVAILABLE FREE AT HTTP://WWW.ADOBE.COM. A PAPER COPY OF THE SOLICITATION WILL NOT BE AVAILABLE TO REQUESTORS. THE SOLICITATION WILL BE ISSUED ON OR ABOUT APRIL 1, 2026.
From Presolicitation posted on Mar 17, 2026Notice history
1Details
Award Information
Not yet awarded