NRS Hubbard Brook Pierce Lab Flooring Replacement 12445525Q0089
Summary
AI-generated · Sep 09, 2025Replace the conference room flooring in the Lab Pierce building at Hubbard Brook Experimental Forest, NH. The work entails removing the existing carpet, repairing about 128 square feet of damaged subfloor, and installing roughly 1,700 square feet of new carpet tiles.
Award will be a single-award firm-fixed-price contract, with the procurement conducted under FAR Parts 13 and 36. A site visit/pre-quote meeting is scheduled for interested bidders; attendance details will be provided.
The Government intends to award a single award firm fixed contract for this acquisition. The NRS Hubbard Brook Pierce Lab Flooring Replacement. This requirement consist of but is not limitied to the removal of the existing carpeting system, replacement of approximately 128 square feet of damaged subfloor sheathing, and installation of approximately 1700 square feet of new carpet tiles in the conference room of the Lab Pierce building at Hubbard Brook Experimental Forest, NH. Acquisition and source selection are being conducted in accordance with the Federal Acquisition Regulation (FAR), Parts 13 and FAR Part 36. There is a scheduled site visit/pre-quote meeting for this project on Wednesday, September 17th 10:00 AM ET at 234 Mirror Lake Rd. North Woodstock, New Hampshire 03262. Prospective contractors should contact Aaron Cleaver at (603)812-7350 or aaron.c.cleaver@usda.gov if planning to attend. See FAR 52.236-27 Site Visit (Construction) (FEB 1995) for more information.
From Solicitation posted on Sep 08, 2025Notice history
1Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA