NRCS-WV Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run 12FPC326B0011
Summary
AI-generated · May 20, 2026Clearing designated areas within the project corridor (removing trees, logs, stumps, shrubs, brush, and rubbish) and reshaping the stream channel, with erosion-control measures to minimize sediment and pollutant runoff during construction. Site preparation for treatment includes furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments, and anchoring mulch as specified. The contract also covers mobilization/demobilization of crews and equipment, establishing traffic control to keep public roads safe, and removing surface and groundwater as needed to complete the work per the specifications.
The scope requires constructing, installing, maintaining, and removing temporary water containment facilities, channels, diversions, pumps, piping, and related equipment; excavation per drawings/specifications and disposal of excavated material; and building earth embankments and other earthfills/backfills as shown. A mandatory site visit will be conducted; details are provided in the attached specifications.
Please see Attachment 1 Specifications documents for full details of services requried. USDA-NRCS West Virginia - Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run A site visit will be held on date May 28th, 2026 at 10:00am ET on that day. Attendees will meet at: Valley Grove Community Center 8566 National Road Valley Grove, WV 26060 The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel. Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities. Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified. The work consists of the mobilization and demobilization of the contractor s forces and equipment necessary for performing the work required under the contract. Establishing traffic control and maintaining safe, convenient use of public roads and right of way. Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required. Excavation required by the drawings and specifications, as well as the disposal of the excavated materials. Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications. *See Specifications document attached to posting for full details of required work.
From Combined Synopsis/Solicitation posted on May 19, 2026Please see Attachment 1 Specifications documents for full details of services requried. USDA-NRCS West Virginia - Ohio County EWP 5090-001 & 003 Streambank Stabilization Dixon and McGraw's Run A site visit will be held on date May 28th, 2026 at 10:00am ET on that day. Attendees will meet at: Valley Grove Community Center 8566 National Road Valley Grove, WV 26060 The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel. Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities. Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified. The work consists of the mobilization and demobilization of the contractor s forces and equipment necessary for performing the work required under the contract. Establishing traffic control and maintaining safe, convenient use of public roads and right of way. Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required. Excavation required by the drawings and specifications, as well as the disposal of the excavated materials. Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications. *See Specifications document attached to posting for full details of required work.
From Combined Synopsis/Solicitation posted on Jun 05, 2026Notice history
2-
Combined Synopsis/Solicitation Posted May 19, 2026
-
Combined Synopsis/Solicitation LATEST Posted Jun 05, 2026No changes from previous notice
Details
Award Information
Not yet awarded
Contacts
Agency
Place of Performance
USA