Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 2 notices 5 documents

NRCS-WV Kanawha County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow Road 12FPC326B0010

Solicitation 12FPC326B0010 Copied Notice ID 8fc0f2af5263453983f1b61339d086ce Copied AGRICULTURE, DEPARTMENT OF — FPAC BUS CNTR-ACQ DIV
SAM.gov
Posted
May 21, 2026
Deadline
Jun 17, 2026
Set-aside
SBA
NAICS
237990
PSC
Y1QA

Summary

AI-generated · May 22, 2026

Kanawha County EWP Streambank Stabilization Sharon Hollow and Ohley Hollow Road requires a contractor to clear designated areas (trees, logs, stumps, shrubs, brush, and rubbish) and reshape the stream channel; install erosion and sediment control measures to protect water and air quality during construction; prepare the site and furnish/place seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments, anchoring mulch as specified. The work includes mobilization and demobilization of forces and equipment, establishing traffic control to keep public roads and right of way safe, and removing surface water and groundwater as needed to perform the construction per the drawings and specifications.

Key tasks also include constructing, operating, and maintaining temporary water containment facilities, channels, and diversions; providing pumps, piping, and related equipment; and removing all temporary works after they are no longer required. Excavation and disposal of excavated material, and construction of earth embankments and other earthfills are required per the drawings and specifications. Full details are in the attached Specifications document.

Please see attachments and comibined synopsis solicitaiton for further deatails. Kanawha County EWP 5091-001 Streambank Stabilization Sharon Hollow and Ohley Hollow Road for USDA NRCS-WV. The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel. Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities. Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified. The work consists of the mobilization and demobilization of the contractor s forces and equipment necessary for performing the work required under the contract. Establishing traffic control and maintaining safe, convenient use of public roads and right of way. Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required. Excavation required by the drawings and specifications, as well as the disposal of the excavated materials. Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications. *See Specifications document attached to posting for full details of required work.

From Combined Synopsis/Solicitation posted on May 21, 2026

Please see attachments and comibined synopsis solicitaiton for further deatails. Kanawha County EWP 5091-001 Streambank Stabilization Sharon Hollow and Ohley Hollow Road for USDA NRCS-WV. The project consists of clearing designated areas by the removal and disposal of trees, logs, stumps, shrubs, brush, and rubbish and the shaping of the channel. Installing measures or performing work to control erosion and minimize the production of sediment and other pollutants to water and air from construction activities. Preparing the area for treatment; furnishing and placing seed, sprigs, mulch, fertilizer, inoculant, lime, and other soil amendments; and anchoring mulch in designated areas as specified. The work consists of the mobilization and demobilization of the contractor s forces and equipment necessary for performing the work required under the contract. Establishing traffic control and maintaining safe, convenient use of public roads and right of way. Removal of surface water and ground water as necessary to perform the construction required by the contract in accordance with the specifications. It must include: (1) constructing, installing, building, and maintaining all necessary temporary water containment facilities, channels, and diversions; (2) furnishing, installing, and operating all necessary pumps, piping, and other facilities and equipment; and (3) removing all such temporary works and equipment after their intended function is no longer required. Excavation required by the drawings and specifications, as well as the disposal of the excavated materials. Construction of earth embankments, other earthfills, and earth backfills required by the drawings and specifications. *See Specifications document attached to posting for full details of required work.

From Combined Synopsis/Solicitation posted on Jun 05, 2026

Notice history

2
  1. Combined Synopsis/Solicitation Posted May 21, 2026
  2. Combined Synopsis/Solicitation LATEST Posted Jun 05, 2026
    No changes from previous notice

Details

Solicitation number 12FPC326B0010
Notice ID 8fc0f2af5263453983f1b61339d086ce
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) Y1QA
NAICS 237990
Place of performance West Virginia
Archive date Jul 02, 2026

Award Information

Not yet awarded

Contacts

primary
Mark Domingo

Email

Agency

AGRICULTURE, DEPARTMENT OF
FARM PRODUCTION AND CONSERVATION BUSINESS CENTER
FPAC BUS CNTR-ACQ DIV

Place of Performance

West Virginia
USA

Dates

Posted May 21, 2026 2 months ago
Last Updated Aug 06, 2026 2 days ago
Due Jun 17, 2026 1 month ago