NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam 12FPC326B0012
Summary
AI-generated · May 21, 2026Rehabilitate the existing Tyler Dam in Worcester County, MA to meet current safety and performance standards. Engineering studies show the auxiliary spillway capacity is insufficient, risking overtopping and potential embankment breach during the probable maximum flood. A site showing is scheduled at the project site for bidders to review conditions.
Major items of work include: excavating the approach channel upstream of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street intersects the dam top; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.
Please see Attachment 1 Specificaitons document for further details. Tyler Dam Rehabilitation Worchester County, MA Site Showing on: Wednesday, May 27?? at 10:00 AM at the site 200 Robin Hill Street Marlborough, MA 01752 The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.
From Combined Synopsis/Solicitation posted on May 20, 2026Notice history
1-
Combined Synopsis/Solicitation LATEST Posted May 20, 2026
Details
Award Information
Not yet awarded