Contacts, documents and full notice history are available with a subscription.
Combined Synopsis/Solicitation SBA Expired 1 notice 5 documents

NRCS-MA Tyler Dam Rehabilitation Project Floodwater Retarding Dam 12FPC326B0012

Solicitation 12FPC326B0012 Copied Notice ID 8eb83b2ee91b4b8b997bba01f3437005 Copied AGRICULTURE, DEPARTMENT OF — FPAC BUS CNTR-ACQ DIV
SAM.gov
Posted
May 20, 2026
Deadline
Jun 18, 2026
Set-aside
SBA
NAICS
237990
PSC
Y1QA

Summary

AI-generated · May 21, 2026

Rehabilitate the existing Tyler Dam in Worcester County, MA to meet current safety and performance standards. Engineering studies show the auxiliary spillway capacity is insufficient, risking overtopping and potential embankment breach during the probable maximum flood. A site showing is scheduled at the project site for bidders to review conditions.

Major items of work include: excavating the approach channel upstream of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street intersects the dam top; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.

Please see Attachment 1 Specificaitons document for further details. Tyler Dam Rehabilitation Worchester County, MA Site Showing on: Wednesday, May 27?? at 10:00 AM at the site 200 Robin Hill Street Marlborough, MA 01752 The work consists of rehabilitating the existing dam to be in compliance with current safety and performance standards. Engineering studies identified that the dam has inadequate auxiliary spillway capacity that would result in overtopping and breaching of the embankment during the probable maximum flood. The major items of work include: excavating the approach channel upstream of the auxiliary spillway drop structure by 2.5 feet to improve flow efficiency; installing a geosynthetic clay liner in the auxiliary spillway approach; raising portions of the dam embankment crest to provide additional freeboard and create a uniform crest elevation; constructing a concrete crest wall to provide freeboard and prevent overtopping at a low spot where Robin Hill Street intersects the top of dam; replacing concrete joint sealant above the waterline in the auxiliary spillway and in the principal spillway conduit; replacing existing chain-link fencing surrounding the auxiliary spillway drop structure; and removing trees within 20 feet of the right upstream embankment groin.

From Combined Synopsis/Solicitation posted on May 20, 2026

Notice history

1
  1. Combined Synopsis/Solicitation LATEST Posted May 20, 2026

Details

Solicitation number 12FPC326B0012
Notice ID 8eb83b2ee91b4b8b997bba01f3437005
Notice type Combined Synopsis/Solicitation
Product / Service (PSC) Y1QA
NAICS 237990
Place of performance Massachusetts
Archive date Jul 03, 2026

Award Information

Not yet awarded

Contacts

primary
Mark Domingo

Email

Agency

AGRICULTURE, DEPARTMENT OF
FARM PRODUCTION AND CONSERVATION BUSINESS CENTER
FPAC BUS CNTR-ACQ DIV

Place of Performance

Massachusetts 01752
USA

Dates

Posted May 20, 2026 2 months ago
Last Updated Aug 06, 2026 2 days ago
Due Jun 18, 2026 1 month ago