Summary

AI-generated · Aug 23, 2025

Close one man-made cut in the salt marsh north of the Satilla River (Noyes Cut) in Camden County, GA, as part of the Noyes Cut Ecosystem Restoration Phase Two. Build a trapezoidal rubble mound closure about 495 feet long with a 3:1 horizontal-to-vertical slope, crest width about 6 feet, using GDOT Type I riprap with an estimated 21,000 tons of rock. The contractor must furnish, stockpile, and place all rock within the template using approved equipment to produce a well-graded mass while minimizing impacts to fish and wildlife, install aids to navigation (signs and markings on pile foundations) at each closure, and conduct work from floating platforms with no equipment placed in the marsh. The project requires maintaining safe vessel operation per state regulations; if marsh is damaged outside the footprint, restoration is at no additional cost to the Government. Site is remote and accessible only by water, with large tidal variations requiring verification of equipment accessibility.

Procurement is full and open competition with an estimated construction value of $5–$10 million and a period of performance of one year after notice to proceed. The solicitation and amendments will be issued on SAM; amendments include Pre-Bid Conference slides and updated specifications/drawings (posted July 18) and a later change to bid submission, shifting from PIEE to email submissions to the Contract Specialist and Contracting Officer. An abstract was posted August 14, 2025, and ongoing amendments will be distributed electronically through the SAM site.

The U.S. Army Corps of Engineers (USACE) Savannah District intends to issue an Invitation for Bid (IFB) W912HN24B5008 for the Noyes Cut Ecosystem Restoration Phase Two Project. The SOLICITATION will be issued for 100% Full and Open Competition under NAICS Code 237990. This acquisition will be procured in accordance with FAR Part 14 (Sealed Bid). The pricing information of the successful offeror shall be incorporated upon award of the contract. Per FAR 36.204, the Construction Magnitude of this contract is between $5,000,000.00 and $10,000,000.00. Anticipated Solicitation Release Date: The Government anticipates releasing the solicitation on or about 3 July 2025 with an approximate closing date on or about 6 August 2025. Actual dates and times will be identified in the solicitation. Additional details can be found in the solicitation when it is posted. Note: This Synopsis is ONLY A NOTIFICATION that a solicitation is anticipated and forthcoming; no proposals are being accepted at this time. Period of Performance: The period of performance will be 1 (one) year after the Notice to Proceed. The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101 N, 81.5466 W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek. The site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats. The cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock. The rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location. The site is owned by the State of Georgia and all applicable laws and regulations of safe vessel operation will be maintained. All work at the site will be conducted from floating platforms and no equipment will be allowed to be placed in the marsh. During construction, the contractor will use best management practices to minimize damage to the marsh and impacts to fish and wildlife. Marsh that is damaged outside of the established footprint of the structure will be restored by the contractor at no additional cost to the Government. Solicitation Website: The official solicitation, when posted, will be available free of charge by electronic posting only and may be found at System of Award Management System (SAM) website, https://sam.gov. Paper copies of the solicitation will not be issued. Telephone and Fax requests for this solicitation will not be honored. Project files are Portable Document Format (PDF) files and can be viewed, navigated, or printed using Adobe Acrobat Reader. To download the solicitation for this project, contractors are required to register at the SAM website at https://sam.gov. Amendments, if/when issued, will be posted to the above referenced website for electronic downloading. This will be the only method of distributing amendments prior to closing; therefore, it is the Offerors responsibility to check the website periodically for any amendments to the solicitation. Registrations: Offerors shall have and shall maintain an active registration in the following database: System for Award Management (SAM): Offerors shall have and shall maintain an active registration in the SAM database at https://sam.gov to be eligible for a Government contract award. If the Offeror is a Joint Venture (JV), the JV entity shall have valid SAM registration in the SAM database representing the JV as one business/firm/entity. If at the time of award an Offeror is not actively and successfully registered in the SAM database, the Government reserves the right to award to the next prospective Offeror. Procurement Integrated Enterprise Environment (PIEE): The only authorized transmission method for bids in response to the forthcoming solicitation is electronically via Procurement Integrated Enterprise Environment (PIEE) Solicitation Module. No Other Transmission Method (E-mail, Facsimile, U.S. Postal Mail, Hand Carried,etc.) Will Be Accepted. Offerors must have an active Proposal Manager role in PIEE at https://piee.eb.mil/. Point of Contacts: For this acquisition, the point-of-contacts are the Contracting Officer Ms. Glenda Canty, whose email address is glenda.a.canty@usace.army.mil and Contract Specialist Mr. Shermaine Malone whose email address is shermaine.d.malone@usace.army.mil.

From Presolicitation posted on Jun 16, 2025

The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101 N, 81.5466 W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek. The site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats. The cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock. The rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.

From Solicitation posted on Jul 14, 2025

The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101 N, 81.5466 W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek. The site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats. The cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock. The rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.

From Solicitation posted on Jul 18, 2025

Amendment 0001: publishes Pre-Bid Conference slides, Attendee List and updated specs and drawings(posted 18July), The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101 N, 81.5466 W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek. The site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats. The cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock. The rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.

From Solicitation posted on Jul 22, 2025

The abstract is posted as of 14 August 2025. Amendment 0002: changes the bid submission location from PIEE to the Contract Specialist and Contracting Officer email addresses. SEE INSTRUCTIONS TO BIDDERS #9 (SUBMISSION OF BID INSTRUCTIONS) Amendment 0001: publishes Pre-Bid Conference slides, Attendee List and updated specs and drawings(posted 18July), The contractor will be required to close one man-made cut in the salt marsh north of the Satilla River in Camden County, GA: Noyes Cut (approximate location: 31.0101 N, 81.5466 W). This work is part of the Noyes Cut Ecosystem Restoration Project and has the objective of increasing tidal exchange throughout the system, restoring salinity gradients to Dover Creek, and reducing shoaling in Umbrella Creek. The site is remote and only accessible by water. It is located approximately 10 linear miles south of Brunswick, GA and is 11 linear miles from the Woodbine boat ramp located at 103 E 1st St, Woodbine, GA, 31569 and 8 linear miles from the Tidelands Nature Center boat ramp located at 100 S Riverview Dr, Jekyll Island, GA 31527. The site is subject to large tidal variations typical to the GA coast and the site may not be accessible at all tide stages for all types of equipment. The contractor will verify site accessibility for selected equipment. Vessel traffic in the vicinity of the site is expected to be minimal and limited to occasional recreational boaters and small commercial crab fishing boats. The cut closure structure will consist of a trapezoidal rubble mound-type structure with a 3:1H:V slope and an approximately length of 495 ft at Noyes Cut. The width at the crest will be approximately 6 ft for each structure. The structure will be made entirely of GDOT Type I riprap. The current estimate for rock quantities is approximately 21,000 tons for Noyes Cut. The contractor will be responsible for furnishing, stockpiling, and placement of all rock. The rock will be carefully placed within the template using approved equipment in a manner to produce a wellgraded mass of rock and to minimize impacts to fish and wildlife. The contractor will install aids to navigation consisting of signs and other markings mounted on pile foundations at each cut closure location.

From Solicitation posted on Aug 14, 2025

Notice history

5
  1. Presolicitation Posted Jun 16, 2025 View
  2. Solicitation Posted Jul 14, 2025
    • Description: Description was updated
    • Notice Type: PresolicitationSolicitation
    • Response Deadline: Jul 02, 2025Aug 12, 2025
  3. Solicitation Posted Jul 18, 2025
    No changes from previous notice
  4. Solicitation Posted Jul 22, 2025
    • Description: Description was updated
  5. Solicitation LATEST Posted Aug 14, 2025
    • Description: Description was updated

Details

Solicitation number W912HN25B5008
Notice ID 6ca6f2a8671e4d7cb5522a7c45c41902
Notice type Solicitation
Product / Service (PSC) Z1KB
NAICS 237990
Set-aside No Set aside used
Place of performance Brunswick, Georgia
Archive date Aug 27, 2025

Award Information

Not yet awarded

Contacts

primary
Shermaine Malone

Email

Phone

secondary
Glenda CANTY

Email

Phone

Agency

DEPT OF DEFENSE
DEPT OF THE ARMY
US ARMY CORPS OF ENGINEERS
ENGINEER DIVISION SOUTH ATLANTIC
W074 ENDIST SAVANNAH

Place of Performance

Brunswick, Georgia
USA

Dates

Posted Aug 14, 2025 11 months ago
Last Updated Aug 06, 2026 1 day ago
Due Aug 12, 2025 11 months ago